IR 05000331/1980017

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-331/80-17 on 800908-12.Noncompliance Noted: Some Watchmen Not Adequately Screened Per Security Plan Commitments.Details Withheld (Ref 10CFR2.790)
ML19347C394
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 09/30/1980
From: Belanger J, Creed J, Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19347C393 List:
References
50-331-80-17, NUDOCS 8010170546
Download: ML19347C394 (2)


Text

.g.

\\

\\J

'

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-331/80-17 Docket No. 50-331 License No. DPR-49 Licensee:

Iowa Electric Light and Power Company Post Office Box 351 Cedar Rapids, IA 52406 Facility Name: Duane Arnold Energy Center Inspection At: Duane Arnold Energy Center, Palo, Iowa Inspection Conducted: September 8-12, 1980 Date of Last Physical Security Inspection: October 29 - November 2, 1979 Type of Inspection: Unannounced Physical Security gd Inspectors:

<>,

.

m

.

J.

R.~ Creed

  • f Bate l

Physical Security Specialist l

%. h. ham 47 3-7/^fo

J.fJL. BelangeN Date Physical Security Specialist T!30 Approved By:

/=

1

-

VJ. A. Hind, Chidf I

Date

,

!

Safeguards Branch

,

I l

Inspection Summary l

l Areas Inspected:

Included a review of: Security Plan; Security Program I

Audit; Security Organization; Protected Area Physical Barriers; Vital Area i

Physical Barriers; Lighting; Access Control (Identification, Authorization l

and Badging); Access Control (Search); Access Control (Escorting); Access Control (Vital Areas); Alarm Stations; Detection Aids; Assessment Aids; Communications; Testing and Maintenance; Compensatory Measures; Response; Locks, Keys, and Combinations; Records and Reports; Followup on Previous

Items of Noncompliance / Deviations.

The inspection involved 82 inspector hours onsite by two NRC inspectors.

The inspection began during an off shif t period;. twenty-two inspection hours were accomplished 6aring offshift periods.

8010170546

._

_.

..

,4_.

.

i

-

,

  • Results: 1The licensee was found to be in compliance with NRC requirements i

within the 29 areas examined during this inspection except for the following-one'itemi Security Organization Some watchmen were not adequately screened in

]

accordance with security plan commitments.

(Infraction)

4

-

4

e

f

I i

i

i

i.

!

i l,

,

i

1

!

!

.

E d

.

G

&

3

-2-

.

.,

.

.

-.

_. _ _ _

_

. - -

.

,. _

......

..

.. _..