IE Insp Repts 50-329/81-18 & 50-330/81-18 on 810801-31.No Noncompliance Noted.Major Areas Inspected:Site Conditions, Specific Laydown Areas,Soils Settlement Bearings & Matl Storage Maint
ML20010H996
Person / Time
Site: Midland
Issue date: 09/10/1981
From: Boyd D, Cook R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20010H985 List:
References
50-329-81-09, 50-329-81-9, 50-330-81-18, NUDOCS 8109290482
Download: ML20010H996 (3)


Text

.

.

__

.

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AHD ENFORCEMENT I

REGION III

Report No. 50-329/81-18; 50-330/81-18 Docket No. 50-329; 50-330 License No. CPPR-81; CPER-82 Licensee: Consumers Power Company 1945 West Parnall Road Jackson, MI 49201 Facilit.y Name: Midland Nucice.r Power Plant, Units 1 and 2

{

Inspection At: Midland Site, Midland, MI Inspection Conduc August 1-31, 1981

-

'

'

~

Inspector:

R. J.

Ook h

[

g_

yhf

/

Approved By:

D. C. Boyd, C'hicf I'

i Reactor Project Section IA

_I_nt pection,Sunnary n

Inspection on Augyst 1-31. 1981 (Report Nos. 50-329/81-18: 50-330/81-18)

A eas Inspected: Examination of site conditions; examination of specific l

laydown areas; licensee audit pcrtaining to material storage maintenance; allegations pertaining to small bore piping installations; soils settlement public hearings; and underrated terminal strips for Limitorque Valve Opera-tors. This inspection involved a total of 21 inspector-hours onsite by one NRC inspector including 0 inspector-hours onsite during off-shitts.

Results: No items of noncompliance or devictions were identified.

,

8109290482 810911 DR ADOC4 05000329 '

PDR

,

.

.

DETAILS 1.

Persons Contacted Consumers Power Company Personnel D. Miller, Site Manager T. Cooke, Site Project Superintendant

  • D. Turnbull, Site Project QA Superintendant M. Schaeffer, QAE Electrical Supervisor j

2. Whitaker, QAE Supervisor R. Nheeler, Senior Engineer

'

H. Allen, QA Mechanical E. Jones, QA Electrical Other Soil Settlement Hearing Participants A11eger

"<A" Numerous other principal staff and personnel were contacted during the reporting period.

  • Denotes those present during the exit interview conducted during the reporting period.

2.

Functional or Program Areas Inspected a.

Site Tours At periodic intervals during the report period, tours of selected site areas were performed. These tours were intended to assess the cicanliness of the site; storage conditions of equipment and piping being used in site construction; the potential for fire or other-hazards which might have a deleterious effect on personnel and equip-i ment; and to witness construction activities in progress. It was notel during these tours that the licensee had commenc.ed digging de-watering wells in the area of the service water building.

b.

Examination of Laydown Area During the reporting period, the laydown aree was examined.

It was noted that piping and equipment were stored on dunnage and the area appeared drained. Pipe caps were installed on saiety related piping and segregation existed between safety and nonsafety related items.

c.

Licensee Audit During the reporting period, the l'icensee prepared and started a comprehensive audit to determine the effectiveness of their storage maintenance program and adherence to procedure FPG 5.000, Maintenance /

Inspection of Materials and Equipment Released for Construction. The

.-

. _.

_ _.

_ _ _ __ -

__

_. - -.

_.- _ _ _ _ _.- _ _

- _ _ _.

5

.

.

,

_

21, 1981 licenste stated in their letter to the NRC dated August

>

, (Itr. J. W. Cook to J. C. Keppler) that such an audit would be per-fonned starting August 31, 1981. This letter was in response to

"

items of noncompliance identified in NRC Inspection Report No. 50-329/

81-08; 50-330/81-08. The results of this-audit and other action taken

'

to correct the iten of noncompliance referenced above will be reviewed

,

at a later tLae.

'

i d.

Allegations - Sunil Bore Pipe Installation

,

j During the reporting period, the Resident Inspector was informed by

the individual making allegations pertaining to small bore piping installations that a document package containing the results of the NRC investigation into these matters had been received. The licen-

,'

see also informed the Resident Inspector that they had further con-tact with the alleger; had notified the Regional Office; and had l

written a letter to the individual explaining some of their policy on handling additional allegations.

l e.

IIcarinas - Soil Settlement Issues

'

On August 13, 1981, the public hearings pertaining to soil settlement issues recessed until 9:00 A.M. on October 13, 1981, at the Midland

,

i County Court House. The Midland Site Resident Inspector Office sup-ported the hearing staff during the reporting period and the Senior

.

{

Resident Inspector was called to testify on August 13, 1981.

<

j f.

50.55(e) Item - Underrated Terminal Strips on Limitorque Valve l

Operators e

During the reporting period, the licensee informed the Resident Inspec-tor and Region III that. their investigation into the 50.55(e) Ites

.

i No. 81-01 addressing underrated terminal strips in Limitorque Valve

Operators revealed that it could not be determined on six additional

!

model terminal strips whether these strips are envi'ronmentally quali-

!

fled. One of the terminal strip models designated Buchanan No. Po 824 j

has been determined to be not environmentally qualified and must be replaced. The licensee ~has requested Limitorque to supply evidence i

!

of environmental qualification for the remaining terminal strips used

{

in the valves sent to the Midland Site.

!

3.

Exit Interviews

'

!.

-

'

The Resident Inspector attended the exit interviews conducted by Regiua III.

!

Reactor Inspectors Messrs. R. Landsman and J. Norton on August 5,1981 and C. Erb and K. Ward on August 14, 1981.

The Resident Inspector met with licensee representative.s (denoted under Persons Contacted) on September 2,1981 to summarize the scope and findings

'

j of.the inspection effort through August 31, 1981. The licensee acknowledged the findings reported herein.

-

,