IR 05000329/1981015

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-329/81-15 & 50-330/81-15 on 810803-05.No Noncompliance Noted.Major Areas Inspected:Benchmark Stability Re Surcharging Borated Watertank Valve Pits & Containment 1 post-tensioning Quality Records
ML20030C099
Person / Time
Site: Midland
Issue date: 08/11/1981
From: Landsman R, Williams C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20030C095 List:
References
50-329-81-15, 50-330-81-15, NUDOCS 8108250395
Download: ML20030C099 (3)


Text

i U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Reports No. 50-329/81-15; 50-330/81-15 Docket Nos. 50-329; 50-330 Licenses No. CPPR-81; CPPR-82 Licens.se :

Consumers Power Company 1945 West Parnall Road Jackson, MI 49201 Facility Name: Midland Nuclear Plant, Units 1 and 2 Inspection At: Midland Site, Midland, MI Inspection Conducted: August 3-5, 1981 8"/!"[f Inspector:

R. B. Landsman Other Accompanying Personnel:

J. Norton (August 4-5, 1981)

$$WYW Approved By:

C. C. Williams, Chief

// / 6[

'

/

Plant Systems Section Inspection Summary Inspection on August 3-5, 1981 (Reports No. 50-329/81-15; 50-330/81-15)

Areas Inspected: Benchmark stability as it relates to surcharging of borated water tank valve pits; and containment No. I post tensioning quality records.

l This inspection effort involved a total of 20 inspector-hours by one NRC in-spector.

Results: No items of noncompliance or deviations were identified in the areas inspected.

l

,

,

l l

l l

l 8108250395 810812

'

PDR ADOCK 05000329 g

PDR

.- -. _

--.

_ ---

.

,,

-

-

-.

_-

,

_

_

,,

w-g

DETAILS Persons Contacted Licensee (MPQAD Department)

M. Schaeffer, Section Head IE&TV R. Whitaker, Group Supervisor Mechanical QAE E. Voss, Technical Department R. Sevo, Group Supervisor Civil IE&TV R. Hirzel, QAE Civil Engineer l

M. Butterfield, QAE Civil Engineer

-

J. Wood, Section Head QAS

Bechtel J. Betts, Assistant Project Field Engineer L. Morris, Field Engineer L. Wehner, Field Engineer

]

U.S. NRC, Region III R. Cook, Senior Resident Inspector All persons contacted were at the exit meeting on August 5, 1981.

1.

Benchmark Stability The inspector requested stability data on surveying bench marks used onsite. The topic was previously discussed in a conference call be-

,

l tween Consumers Power Company, Bechtel, NRR and IE on July 20, 1981.

'

Specifically, the stability of benchmark PBM-1 was questioned.

PBM-1, which is installed in the plant fill, will be used to monitor the surcharging of the borated water storage tank valve pits.

The inspector determined that, within the accuracy of the surveys performed, benchmark PBM-1 has been stable in relation to USGS benchmark 7C, since its installation in September of 1976.

2.

Pc.st Tensioning Quality Records The inspector reviewed quality records relative to containment No. 1 post tensioning operations. QC inspection reports concerning tendon insertion, button heading, stresr.ing and greasing operations were re-viewed as follows:

Vertical Tendons:

V21-1, V22-1, V29-1, V30-1, V73-1, V74-1, V85-1, V86-1, V101-1, V102-1; Horizontal Tendons:

H21-4, H21-46, H13-33, H13-34; H32-015, H32-046; i

H32-49, H32-50, H21-15, H21-16; and-2-

--

-r t_

Dome Tendons: D116, D115, D127, D128, D215, D216, D307, D308, D321, D322.

All records were found to be in accordance with requirements.

Exit Interview The inspector met with licensee representatives (denoted in the Persons Contacted section) at the conclusion of the inspection on August 5, 1981.

The inspector summarized the purpose and findings of the inspection. The licensee acknowledged the findings reported herein.