MONTHYEARIR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 IR 05000318/20240072024-11-0606 November 2024 Assessment Follow-Up Letter for Calvert Cliffs Nuclear Power Plant, Unit 2 (Report 05000318/2024007) IR 05000317/20240032024-10-22022 October 2024 Integrated Inspection Report 05000317/2024003, 05000318/2024003, and Independent Spent Fuel Storage Installation Report 07200008/2024001 IR 05000317/20245012024-10-0707 October 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000317/2024501 and 05000318/2024501 IR 05000317/20240052024-08-29029 August 2024 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2024005 and 05000318/2024005) IR 05000317/20240022024-08-0606 August 2024 Integrated Inspection Report 05000317/2024002 and 05000318/2024002 IR 05000317/20240102024-07-31031 July 2024 Age-Related Degradation Inspection Report 05000317/2024010 and 05000318/2024010 IR 05000317/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000317/2024401 and 05000318/2024401 IR 05000317/20240012024-05-0707 May 2024 Integrated Inspection Report 05000317/2024001 and 05000318/2024001 IR 05000317/20240402024-04-11011 April 2024 95001 Supplemental Inspection Report 05000317/2024040 and Follow-Up Assessment Letter IR 05000317/20230062024-02-28028 February 2024 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2, (Reports 05000317/2023006 and 05000318/2023006 IR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 IR 05000317/20230102023-11-20020 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000317/2023010 and 05000318/2023010 IR 05000317/20230402023-11-0202 November 2023 95001 Supplemental Inspection Report 05000317/2023040 and Follow-Up Assessment Letter IR 05000317/20230032023-11-0101 November 2023 Integrated Inspection Report 05000317/2023003 and 05000318/2023003 IR 05000317/20230902023-10-26026 October 2023 – Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000317/2023090 IR 05000317/20230502023-09-29029 September 2023 Special Inspection Report 05000317/2023050 and Preliminary White Finding and Apparent Violation IR 05000317/20234012023-09-18018 September 2023 Cyber Security Inspection Report 05000317/2023401 and 05000318/2023401 IR 05000317/20230052023-08-31031 August 2023 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2023005 and 05000318/2023005) IR 05000317/20230022023-08-0303 August 2023 Integrated Inspection Report 05000317/2023002 IR 05000317/20233012023-07-12012 July 2023 – Initial Operator Licensing Examination Report 05000317/2023301 and 05000318/2023301 IR 05000317/20230122023-07-10010 July 2023 Commercial Grade Dedication Report 05000317/2023012 and 05000318/2023012 IR 05000317/20230112023-05-10010 May 2023 Title 10 of the Code of Federal Regulations 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection Report 05000317/2023011 and 05000318/2023011 IR 05000317/20230012023-04-24024 April 2023 Integrated Inspection Report 05000317/2023001 and 05000318/2023001 IR 05000317/20234022023-04-19019 April 2023 Security Baseline Inspection Report 05000317/2023402, 05000318/2023402 and Independent Spent Fuel Storage Installation Security Inspection 07200008/2023401, 07200078/2023401 (Cover Letter Only) IR 05000317/20220062023-03-0101 March 2023 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Reports 05000317/2022006 and 05000318/2022006) IR 05000317/20220042023-01-24024 January 2023 Integrated Inspection Report 05000317/2022004 and 05000318/2022004 IR 05000317/20220102022-12-19019 December 2022 Triennial Fire Protection Inspection Report 05000317/2022010 and 05000318/2022010 IR 05000317/20224022022-12-12012 December 2022 Security Baseline Inspection Report 05000317/2022402 and 05000318/2022402 (Cover Letter Only) IR 05000317/20220902022-12-0505 December 2022 EA-22-089: Calvert Cliffs Nuclear Power Plant, Unit 1 - Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation: Inspection Report 05000317/2022090 IR 05000317/20225012022-11-14014 November 2022 Emergency Preparedness Inspection Report 05000317/2022501 and 05000318/2022501 ML22314A0872022-11-14014 November 2022 Notification of Conduct of Title 10 of the Code of Federal Regulations 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors, Inspection IR 05000317/20220032022-11-0707 November 2022 Integrated Inspection Report 05000317/2022003 and 05000318/2022003 and Preliminary White Finding and Apparent Violation IR 05000317/20224012022-09-0808 September 2022 Material Control and Accounting Program Inspection Report 05000317/2022401 and 05000318/2022401 (Cover Letter Only) IR 05000317/20220052022-08-31031 August 2022 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2022005 and 05000318/2022005) IR 05000317/20223012022-08-16016 August 2022 Initial Operator Licensing Examination Report 05000317/2022301 and 05000318/2022301 IR 05000317/20220022022-08-0808 August 2022 Integrated Inspection Report 05000317/2022002 and 05000318/2022002 IR 05000317/20220112022-07-18018 July 2022 Post-Approval Site Inspection for License Renewal - Phase 4 05000317/2022011 and 05000318/2022011 IR 05000317/20224202022-06-0707 June 2022 Plat Units 1 & 2 - Security Baseline Inspection Report 05000317/2022420 and 05000318/2022420 IR 05000317/20220012022-05-0202 May 2022 Integrated Inspection Report 05000317/2022001 and 05000318/2022001 IR 05000317/20210062022-03-0202 March 2022 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Reports 05000317/2021006 and 05000318/2021006) IR 05000317/20210042022-01-31031 January 2022 Integrated Inspection Report 05000317/2021004 and 05000318/2021004 IR 05000317/20210012022-01-24024 January 2022 Reissued Integrated Inspection Report 05000317/2021001 and 05000318/2021001 IR 07200008/20210012022-01-13013 January 2022 Independent Spent Fuel Storage Installation (ISFSI) NRC Inspection Report No. 07200008/2021001 IR 05000317/20210032021-11-0909 November 2021 Integrated Inspection Report 05000317/2021003 and 05000318/2021003 IR 05000317/20214012021-10-0505 October 2021 Security Baseline Inspection Report 05000317/2021401 and 05000318/2021401 (Cover Letter Only) IR 05000317/20210122021-10-0404 October 2021 Biennial Problem Identification and Resolution Inspection Report 05000317/2021012 and 05000318/2021012 IR 05000317/20215012021-09-23023 September 2021 Emergency Preparedness Biennial Exercise Inspection Report 05000317/2021501 and 05000318/2021501 IR 05000317/20210052021-09-0101 September 2021 Updated Inspection Plan for the Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2021005 and 05000318/2021005) IR 05000317/20210022021-08-10010 August 2021 Integrated Inspection Report 05000317/2021002 and 05000318/2021002 2024-08-06
[Table view] Category:Letter
MONTHYEARIR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 IR 05000318/20240072024-11-0606 November 2024 Assessment Follow-Up Letter for Calvert Cliffs Nuclear Power Plant, Unit 2 (Report 05000318/2024007) IR 05000317/20240032024-10-22022 October 2024 Integrated Inspection Report 05000317/2024003, 05000318/2024003, and Independent Spent Fuel Storage Installation Report 07200008/2024001 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24283A0012024-10-0909 October 2024 Senior Reactor and Reactor Operator Initial License Examinations IR 05000317/20245012024-10-0707 October 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000317/2024501 and 05000318/2024501 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000317/20240052024-08-29029 August 2024 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2024005 and 05000318/2024005) ML24240A2462024-08-27027 August 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report ML24240A1112024-08-27027 August 2024 Registration of Use of Casks to Store Spent Fuel ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240022024-08-0606 August 2024 Integrated Inspection Report 05000317/2024002 and 05000318/2024002 IR 05000317/20240102024-07-31031 July 2024 Age-Related Degradation Inspection Report 05000317/2024010 and 05000318/2024010 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24198A0442024-07-16016 July 2024 Inservice Inspection Report IR 05000317/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000317/2024401 and 05000318/2024401 ML24177A1832024-06-25025 June 2024 Inservice Inspection Report RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24161A0012024-06-0909 June 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML24150A0522024-05-29029 May 2024 Operator Licensing Examination Approval ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24136A1962024-05-15015 May 2024 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Operating Report IR 05000317/20240012024-05-0707 May 2024 Integrated Inspection Report 05000317/2024001 and 05000318/2024001 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests 05000317/LER-2024-002, Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus2024-04-29029 April 2024 Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus 05000318/LER-2024-001, Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip2024-04-24024 April 2024 Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip ML24101A1942024-04-22022 April 2024 Closeout Letter for GL 2004-02 ML24114A0182024-04-18018 April 2024 Electronic Reporting of Occupational Exposure Reporting 05000318/LER-2023-004-01, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-04-12012 April 2024 Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240402024-04-11011 April 2024 95001 Supplemental Inspection Report 05000317/2024040 and Follow-Up Assessment Letter RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24082A0082024-03-22022 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 ML24078A1152024-03-18018 March 2024 10 CFR 50.46 Annual Report ML24059A0632024-03-15015 March 2024 Authorization and Safety Evaluation for Alternative Request ISI-05-021 (EPID L-2023-LLR-0006) - Non-Proprietary IR 05000317/20230062024-02-28028 February 2024 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2, (Reports 05000317/2023006 and 05000318/2023006 ML24052A0072024-02-14014 February 2024 Core Operating Limits Report for Unit 1, Cycle 27, Revision 0 ML24040A0962024-02-0909 February 2024 Notification of Readiness for NRC 95001 Inspection ML24040A1492024-02-0909 February 2024 Response to NRC Request for Additional Information Regarding Final Response to Generic Letter 2004-02 IR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank IR 05000317/20230102023-11-20020 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000317/2023010 and 05000318/2023010 2024-09-06
[Table view] |
Text
ber 28, 2007
SUBJECT:
CALVERT CLIFFS NUCLEAR POWER PLANT - NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE - INSPECTION REPORT NOS.
05000317/2007502 AND 05000318/2007502
Dear Mr. Spina:
On November 2, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the 2007 evaluated emergency preparedness exercise at your Calvert Cliffs Nuclear Power Plant. The enclosed inspection report documents the inspection results, which were discussed on November 2, 2007, with you and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-317, 50-318 License Nos. DPR-53, DPR-69
November 28, 2007 Mr. James A. Spina, Vice President Calvert Cliffs Nuclear Power Plant, Inc.
Calvert Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657-4702 SUBJECT: CALVERT CLIFFS NUCLEAR POWER PLANT - NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE - INSPECTION REPORT NOS.
05000317/2007502 AND 05000318/2007502
Dear Mr. Spina:
On November 2, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the 2007 evaluated emergency preparedness exercise at your Calvert Cliffs Nuclear Power Plant. The enclosed inspection report documents the inspection results, which were discussed on November 2, 2007, with you and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-317, 50-318 License Nos. DPR-53, DPR-69 SUNSI Review Complete: JMT (Reviewers Initials)
DOCUMENT NAME: C:\FileNet\ML073330166.wpd ADAMS ACCESSION NO. ML073330166 After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure
"N" = No copy OFFICE RI/DRS RI/DRP RI/DRS NAME SBarr/STB GDentel/GTD JTrapp/JMT DATE 11/27/07 11/28/07 11/28/07 OFFICIAL RECORD COPY cc w/encl:
M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer President, Calvert County Board of Commissioners C. W. Fleming, Senior Counsel, Constellation Generation Group, LLC J. Gaines, Director, Licensing Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel R. Hickok, NRC Technical Training Center S. Pattison, SLO (2)
D. Hammons, RAC Chair, DHS, Region III Distribution w/encl: (via E-mail)
S. Collins, RA M. Dapas, DRA G. West, RI OEDO (Acting)
J. Lubinski, NRR D. Pickett, PM, NRR M. David, PM, NRR G. Dentel, DRP B. Bickett, DRP S. Kennedy, DRP, Senior Resident Inspector M. Davis, DRP, Resident Inspector C. Newgent, DRP, Resident OA Region I Docket Room (with concurrences)
ROPreports@nrc.gov R. Kahler, NSIR S. LaVie, NSIR M. Gamberoni, DRS D. Roberts, DRS J. Trapp, DRS S. Barr, DRS
U. S. NUCLEAR REGULATORY COMMISSION REGION I
REGION I
Docket No: 50-317, 50-318 License No: DPR-53, DPR-69 Report No: 05000317/2007502 and 05000318/2007502 Licensee: Constellation Generation Group, LLC (Constellation)
Facility: Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Location: Lusby, MD Dates: October 29, 2007 through November 2, 2007 Inspectors: S. Barr, Sr. Emergency Preparedness Inspector, DRS, Region I (Lead)
N. Perry, Sr. Emergency Response Specialist, DRS, Region I R. Cureton, Emergency Preparedness Inspector, DRS, Region I R. Rolph, Health Physicist, DRS, Region I Approved by: James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Enclosure
SUMMARY OF FINDINGS IR 05000317/2007502, 05000318/2007502; 10/29/2007 - 11/02/2007; Calvert Cliffs Nuclear Power Plant, Units 1 and 2; Exercise Evaluation; Emergency Action Level and Emergency Plan Changes; Emergency Preparedness Performance Indicators.
This was an announced inspection conducted by four region-based inspectors. No findings of significance were identified. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 4, dated December 2006.
Cornerstone: Emergency Preparedness A. NRC-Identified and Self-Revealing Findings No findings of significance were identified B. Licensee-Identified Findings None.
ii Enclosure
Report Details 1. REACTOR SAFETY Cornerstone: Emergency Preparedness (EP)
1EP1 Exercise Evaluation (71114.01 - 1 Sample)
a. Inspection Scope Prior to the exercise, an in-office review was conducted of the exercise objectives and scenario submitted to the NRC, to determine if the exercise would test major elements of the emergency plan as required by 10 CFR 50.47(b)(14). A description of the evaluation conducted by the NRC during the exercise is described below. Overall, this inspection activity represented the completion of one sample on a biennial cycle.
The exercise evaluation consisted of the following review and assessment:
- The adequacy of Calvert Cliffs performance in the biennial full-participation exercise regarding the implementation of the risk-significant planning standards (RSPS) in 10 CFR 50.47 (b)(4), (5), (9), and (10), which are emergency classification, offsite notification, radiological assessment, and protective action recommendations, respectively.
- The overall adequacy of Calvert Cliffs emergency response facilities with regard to NUREG-0696, Functional Criteria for Emergency Response Facilities, and Emergency Plan commitments. The facilities assessed were the Control Room Simulator, the Technical Support Center (TSC), the Operations Support Center (OSC), the Joint Information Center (JIC), and the Emergency Operations Facility (EOF).
- Other performance areas, such as, the emergency response organizations (EROs) recognition of abnormal plant conditions, command and control, intra- and inter-facility communications, prioritization of mitigation activities, utilization of repair and field monitoring teams, interface with offsite agencies, staffing and procedure adequacy, and the overall implementation of the emergency plan and its implementing procedures.
- Past performance issues from the last NRC exercise report and Calvert Cliffs drill reports to determine effectiveness of corrective actions as demonstrated during this exercise to ensure compliance with 10 CFR 50.47(b)(14).
- The post-exercise critiques to evaluate Calvert Cliffs self-assessment of its ERO performance during the exercise and to ensure compliance with 10 CFR 50, Appendix E, Paragraph IV.F.2.g.
The inspectors reviewed the documents listed in the attachment to this report.
Enclosure
b. Findings No findings of significance were identified.
1EP4 Emergency Action Level (EAL) and Emergency Plan Changes a. Inspection Scope (71114.04 - 1 Sample)
Since the last NRC inspection of this program area, Emergency Plan Revision 37 was implemented based on the licensees determination, in accordance with 10 CFR 50.54(q),
that the changes resulted in no decrease in effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR 50. The inspectors inspected all EAL changes made since January 2007, and conducted a sampling review of the Emergency Plan changes, and changes to the lower-tier emergency plan implementing procedures, to evaluate for potential decreases in effectiveness of the Emergency Plan. However, this review was not documented in a Safety Evaluation Report and does not constitute formal NRC approval of the changes.
Therefore, these changes remain subject to future NRC inspection in their entirety.
b. Findings No findings of significance were identified.
4. OTHER ACTIVITIES (OA)
4OA1 Performance Indicator (PI) Verification (71151- 3 Samples)
a. Inspection Scope The inspectors reviewed data for the Calvert Cliffs EP PIs, which are: (1) Drill and Exercise Performance (DEP); (2) ERO Drill Participation; and (3) Alert and Notification System (ANS) Reliability. The last EP inspection at Calvert Cliffs was in the fourth quarter of 2006, so the inspectors reviewed supporting documentation from drills and tests from the fourth quarter of 2006 and the first three quarters of 2007, to verify the accuracy of the reported PI data. The review of these performance indicators was conducted in accordance with NRC Inspection Procedure 71151. The acceptance criteria used for the review were documented in NEI 99-02, Revision 5, Regulatory Assessment Performance Indicator Guidelines.
This inspection activity represented the completion of three samples on an annual cycle.
b. Findings No findings of significance were identified.
Enclosure
40A6 Meetings, including Exit On November 2, 2007, the inspector presented the inspection results to Mr. James Spina, Calvert Cliffs Station Vice President, and other members of the Calvert Cliffs staff. No proprietary information was provided to the inspectors during this inspection.
Enclosure
A-1 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel E. Schinner, Calvert Cliffs Emergency Preparedness Manager LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None LIST OF DOCUMENTS REVIEWED Section 1EP1: Exercise Evaluation Calvert Cliffs Nuclear Power Station Emergency Response Plan (Revision 37)
Calvert Cliffs Emergency Response Plan Implementing Procedures Calvert Cliffs October 30, 2007, Emergency Exercise Scenario Package Calvert Cliffs Emergency Preparedness Drill Reports, January 2006 - October 2007 Condition Reports written for the October 30, 2007, exercise:
IRE-026-565 IRE-026-575 through -578 IRE-026-580 through -590 IRE-026-596 IRE-026-597 IRE-026-599 IRE-026-604 IRE-026-607 IRE-026-610 IRE-026-611 IRE-026-613 through -616 IRE-026-618 IRE-026-620 IRE-026-622 through -624 IRE-026-626 IRE-026-680 IRE-026-685 IRE-026-690 Attachment
A-2 Section 1EP4: Emergency Action Level an Emergency Plan Changes Procedure EN-1-100, Engineering Services Process Overview (Revision 19)
Procedure EN-1-102, 10CFR50.59/10CFR72.48 Reviews (Revision 11)
Procedure EP-1-100, Preparation and Control of the Emergency Response Plan (Revision 0200)
Calvert Cliffs Nuclear Power Station Emergency Response Plan Revision 37 change package All 10CFR50.54(q) screenings performed in 2007 (S07-01 through S07-14)
Section 4OA1: Performance Indicator Verification Procedure CNG-NL-1.01-1010, NRC and INPO Performance Indicator Reporting (Revision 0100)
Procedure RM-1-323, Preparation of Emergency Preparedness Cornerstone NRC Performance Indicators (Revision 3)
Drill/Exercise Performance Indicator Data, October 2006 - September 2007 ERO Drill Participation Performance Indicator Data, October 2006 - September 2007 ANS Reliability Performance Indicator Data, October 2006 - September 2007 LIST OF ACRONYMS ANS Alert and Notification System CFR Code of Federal Regulations EAL Emergency Action Level ERO Emergency Response Organization EOF Emergency Operations Facility EP Emergency Preparedness ERO Emergency Response Organization JIC Joint Information Center NRC Nuclear Regulatory Commission OSC Operations Support Center RSPS Risk Significant Planning Standard TSC Technical Support Center Attachment