April 8, 2025
SUBJECT:
CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000317/2025401 AND 05000318/2025401
Dear David Rhoades:
On April 3, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Calvert Cliffs Nuclear Power Plant, Units 1 and 2, and discussed the results of this inspection with Peter Moodie, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Brice A. Bickett, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety & Security
Docket Nos. 05000317 and 05000318 License Nos. DPR-53 and DPR-69
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000317 and 05000318
License Numbers:
Report Numbers:
05000317/2025401 and 05000318/2025401
Enterprise Identifier: I-2025-401-0016
Licensee:
Constellation Energy Generation, LLC
Facility:
Calvert Cliffs Nuclear Power Plant, Units 1 and 2
Location:
Lusby, MD
Inspection Dates:
March 31, 2025 to April 03, 2025
Inspectors:
K. Hussar, Senior Physical Security Inspector
S. McCarver, Physical Security Inspector
C. Davis, Physical Security Inspector
Approved By:
Brice A. Bickett, Chief
Security, Emergency Preparedness and Incident Response Branch
Division of Radiological Safety & Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Calvert Cliffs Nuclear Power Plant,
Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
===inspection elements:
Access Control===
(1)
- Tier I: All Requirements
- Tier II: 8 Requirements (02.06 a, 02.07 a, 02.08 a - e, i)
- Tier III: 1 Requirement (02.09)
71130.04 - Equipment Performance, Testing, and Maintenance
The inspectors evaluated the security equipment testing and maintenance program through completion of the following inspection elements:
Equipment Performance, Testing, and Maintenance (1 Sample)
(1)
- Tier I: All Requirements
- Tier II: 6 Requirements (02.09 a, 02-11 a - d, 02.12 a)
- Tier III: All Requirements
71130.07 - Security Training
The inspectors evaluated the security training program through completion of the following
===inspection elements:
Security Training===
(1)
- Tier I: All Requirements
- Tier II: 10 Requirements (02.05 a - d, 02.06 a - b, 02.07 a, 02.08 a, 02.09 a - b)
- Tier III: 7 Requirements (02.10, 02.11 a, 02.12 a - b, 02.13 a - c)
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following
===inspection elements:
Security Plan Changes===
- (1) Since the last NRC baseline inspection of this program area, Security Plan Revision 18 was implemented. Based on Calvert Cliffs' evaluation, and in accordance with 10 CFR 50.54(p)(2), the change resulted in no decrease in safeguards effectiveness of the security plan and the revised security plan change continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan change to evaluate for a potential decrease in safeguards effectiveness of the security plan; however, this review does not constitute formal NRC approval of this change. Therefore, the change remains subject to future NRC inspection in their entirety.
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)
=
- (1) April 01, 2024 through December 31,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On April 3, 2025, the inspectors presented the security baseline inspection results to Peter Moodie, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
04785121
04787099
04799252
04806180
04831591
Procedures
Control and Classification of Safeguards Information (SGI)
and Sensitive Unclassified Non-Safeguards Information
(SUNSI)
Revision 23
Security Sealing Operations
Revision 14
Constellation Security Search Processes
Revision 39
Processing and Escorting of Personnel and Vehicles
Revision 34
Control of Badges
Revision 11
Control of Security Access Control Devices
Revision 10
Operation of the Security Control Centers
Revision 16
SY-CA-101-119
Material Search for Entry Into PA
Revision 1
Corrective Action
Documents
04783465
04785107
04785991
04786594
04806906
04828958
Corrective Action
Documents
Resulting from
Inspection
04852347
04851926
04851845
Procedures
Testing Security Equipment
Revision 23
Security Standards Of Conduct
Revision 19
SY-AA-150-103-
F-01
Record of Semi-Annual Functionality and Accuracy Test and
Firearms Maintenance
Revision 1
SY-CA-101-122
Security System Testing
Revision 10
SY-CA-1015-F-02 Quarterly Duty Firearms Inspection/Cleaning Form
Revision 6
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
04797841
Corrective Action
Documents
Resulting from
Inspection
04820974
Miscellaneous
IQT #16
Determine Amount of Force to Prevent an Unauthorized Act
Revision 6
IQT #8
Conduct Security Patrols
Revision 7
Lesson Plan 1108 CCNPP Use of Force
01/09/2025
N-AN-SY-LP-
4301X
Annual Written Examination
Procedures
SY-AA-150-101-
F-15
Weapons Familiarization Training Worksheet
Revision 1
SY-AA-150-101-
F-44
Weapons Familiarization Training
Revision 1
Constellation Nuclear Security OJT Program
Revision 3
SY-AA-150-105-
F-01
Physical Exertion Information
Revision 1
SY-CA-101-145
Security Standards of Conduct
Revision 19
SY-CA-101-501
Defensive Strategy
Revision 18
Self-Assessments
25 Security Training Self-Assessment Report
2/21/2025
NOSA-CAL-23-01 Security Programs Audit Report 2023
2/08/2023
NOSA-CAL-25-01 Security Programs Audit Report 2025
2/25/2025
Corrective Action
Documents
Miscellaneous
Calvert Cliffs Nuclear Power Plant Security Plan, Training
and Qualification Plan, Safeguards Contingency Plan, and
Independent Spent Fuel Storage Installation Security
Program (SGI)
Revision 18
71151
Procedures
Monthly Data Elements for NRC ROP Indicator - Protected
Area Security Equipment Performance Index
Revision 5
Security Events and Nuclear Regulatory Commission
Performance Indicators
Revision 11