April 8, 2025

SUBJECT:

CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000317/2025401 AND 05000318/2025401

Dear David Rhoades:

On April 3, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Calvert Cliffs Nuclear Power Plant, Units 1 and 2, and discussed the results of this inspection with Peter Moodie, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Brice A. Bickett, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety & Security

Docket Nos. 05000317 and 05000318 License Nos. DPR-53 and DPR-69

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000317 and 05000318

License Numbers:

DPR-53 and DPR-69

Report Numbers:

05000317/2025401 and 05000318/2025401

Enterprise Identifier: I-2025-401-0016

Licensee:

Constellation Energy Generation, LLC

Facility:

Calvert Cliffs Nuclear Power Plant, Units 1 and 2

Location:

Lusby, MD

Inspection Dates:

March 31, 2025 to April 03, 2025

Inspectors:

K. Hussar, Senior Physical Security Inspector

S. McCarver, Physical Security Inspector

C. Davis, Physical Security Inspector

Approved By:

Brice A. Bickett, Chief

Security, Emergency Preparedness and Incident Response Branch

Division of Radiological Safety & Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Calvert Cliffs Nuclear Power Plant,

Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

===inspection elements:

Access Control===

(1)

  • Tier I: All Requirements
  • Tier II: 8 Requirements (02.06 a, 02.07 a, 02.08 a - e, i)
  • Tier III: 1 Requirement (02.09)

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security equipment testing and maintenance program through completion of the following inspection elements:

Equipment Performance, Testing, and Maintenance (1 Sample)

(1)

  • Tier I: All Requirements
  • Tier II: 6 Requirements (02.09 a, 02-11 a - d, 02.12 a)
  • Tier III: All Requirements

71130.07 - Security Training

The inspectors evaluated the security training program through completion of the following

===inspection elements:

Security Training===

(1)

  • Tier I: All Requirements
  • Tier II: 10 Requirements (02.05 a - d, 02.06 a - b, 02.07 a, 02.08 a, 02.09 a - b)
  • Tier III: 7 Requirements (02.10, 02.11 a, 02.12 a - b, 02.13 a - c)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following

===inspection elements:

Security Plan Changes===

(1) Since the last NRC baseline inspection of this program area, Security Plan Revision 18 was implemented. Based on Calvert Cliffs' evaluation, and in accordance with 10 CFR 50.54(p)(2), the change resulted in no decrease in safeguards effectiveness of the security plan and the revised security plan change continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan change to evaluate for a potential decrease in safeguards effectiveness of the security plan; however, this review does not constitute formal NRC approval of this change. Therefore, the change remains subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) April 01, 2024 through December 31,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On April 3, 2025, the inspectors presented the security baseline inspection results to Peter Moodie, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Corrective Action

Documents

04785121

04787099

04799252

04806180

04831591

Procedures

SY-AA-101-106

Control and Classification of Safeguards Information (SGI)

and Sensitive Unclassified Non-Safeguards Information

(SUNSI)

Revision 23

SY-AA-101-110

Security Sealing Operations

Revision 14

SY-AA-101-112

Constellation Security Search Processes

Revision 39

SY-AA-101-117

Processing and Escorting of Personnel and Vehicles

Revision 34

SY-AA-101-118

Control of Badges

Revision 11

SY-AA-101-120

Control of Security Access Control Devices

Revision 10

SY-AA-101-124

Operation of the Security Control Centers

Revision 16

SY-CA-101-119

OCA

Material Search for Entry Into PA

Revision 1

71130.04

Corrective Action

Documents

04783465

04785107

04785991

04786594

04806906

04828958

Corrective Action

Documents

Resulting from

Inspection

04852347

04851926

04851845

Procedures

SY-AA-101-122

Testing Security Equipment

Revision 23

SY-AA-101-145

Security Standards Of Conduct

Revision 19

SY-AA-150-103-

F-01

Record of Semi-Annual Functionality and Accuracy Test and

Firearms Maintenance

Revision 1

SY-CA-101-122

Security System Testing

Revision 10

SY-CA-1015-F-02 Quarterly Duty Firearms Inspection/Cleaning Form

Revision 6

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.07

Corrective Action

Documents

04797841

Corrective Action

Documents

Resulting from

Inspection

04820974

Miscellaneous

IQT #16

Determine Amount of Force to Prevent an Unauthorized Act

Revision 6

IQT #8

Conduct Security Patrols

Revision 7

Lesson Plan 1108 CCNPP Use of Force

01/09/2025

N-AN-SY-LP-

4301X

Annual Written Examination

Procedures

SY-AA-150-101-

F-15

Weapons Familiarization Training Worksheet

Revision 1

SY-AA-150-101-

F-44

Weapons Familiarization Training

Revision 1

SY-AA-150-104

Constellation Nuclear Security OJT Program

Revision 3

SY-AA-150-105-

F-01

Physical Exertion Information

Revision 1

SY-CA-101-145

Security Standards of Conduct

Revision 19

SY-CA-101-501

Defensive Strategy

Revision 18

Self-Assessments

25 Security Training Self-Assessment Report

2/21/2025

NOSA-CAL-23-01 Security Programs Audit Report 2023

2/08/2023

NOSA-CAL-25-01 Security Programs Audit Report 2025

2/25/2025

71130.09

Corrective Action

Documents

AR 04830106

Miscellaneous

Calvert Cliffs Nuclear Power Plant Security Plan, Training

and Qualification Plan, Safeguards Contingency Plan, and

Independent Spent Fuel Storage Installation Security

Program (SGI)

Revision 18

71151

Procedures

LS-AA-2160

Monthly Data Elements for NRC ROP Indicator - Protected

Area Security Equipment Performance Index

Revision 5

SY-AA-101-155

Security Events and Nuclear Regulatory Commission

Performance Indicators

Revision 11