IR 05000315/1991002

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-315/91-02 & 50-316/91-02 on 920108- 920218.No Violations Noted
ML17329A405
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/06/1992
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
Shared Package
ML17329A406 List:
References
NUDOCS 9203120199
Download: ML17329A405 (5)


Text

Docket No. 50-315 Docket No. 50-316 Indiana Michigan Power Company ATTN:

Hr.

E. Vice President Nuclear Operations Division 1 Riverside Plaza Columbus, OH 43216

Dear Nr. Fitzpatrick:

This refers to the routine safety inspection conducted by J.

A. Isom and D.

G.

Passehl of this office on January 8 through February 18, 1992, of activities at the Donald C.

Cook Nuclear Plant, Units 1 and 2, authorized by NRC Operating Licenses No.

DPR-58 and DPR-74, and to the discussion of our findings with A. A. Blind and others of your staff at the conclusion of the inspection.

Areas examined during the inspection are'identified in the report.

Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progress.

No violations of NRC requirements were identified during the course of this inspection.

One unresolved item was identified concerning the operability of the Emergency Diesel Generators in the past with degraded room ventilation airflows.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely, Enclosure:

Inspection Reports No. 50-315/92002(DRP);

No. 50-316/92002(DRP)

C.,'., '

W.

D. Shafer, Chief Reactor Projects Branch

S ee Attached Distribution

~Es RIIY RIII Schweibinz

/~Jorgensen Ci+

g -6->2 9203120199 920306 PDR ADOCK 05000315 G

PDR R

S afer~

g.J

6'EMI Wp.0

>>>>*<<<<

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION III

799 ROOSEVELT ROAD GLEN ELLYN, ILI INOIS 60137 NAi..;

Docket No. 50-315 Docket No. 50-316 Indiana Michigan Power Company ATTN:

Mr. E. Vice President Nuclear Operations Division 1 Riverside Plaza Columbus, OH 43216 Dear M This refers to the routine safety inspection conducted by J.

A.

Isom and D.

G. Passehl of this office on January 8 through February 18, 1992, of activities at the Donald C.

Cook Nuclear Plant, Units

and 2, authorized by NRC Operating Licenses No.

DPR-58 and DPR-74, and to the discussion of our findings with A. A. Blind and others of your staff at the conclusion of the inspection.

~

~

Areas examined during the inspection are identified in the report.

Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progress.

No violations of NRC requirements were identified during the course of this inspection.

One unresolved item was identified concerning the operability of the Emergency Diesel Generators in the past with degraded room ventilation airflows.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter.,and the enclo'sed inspection report will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Enclosure:

Inspection Reports No. 50-315/92002(DRP);

No. 50-316/92002(DRP)

See Attached Distribution

Sincerely, g-pd W.

D. Shafe, Chief Reactor Projects Branch

Indiana Michigan Power Company Distribution cc w/enclosures:

A. A. Blind, Plant Manager DCD/DCB (RIDS)

OC/LFDCB Resident Inspector, RIII James R. Padgett, Michigan Public Service Commission EIS Coordinator, USEPA Region 5 Office Michigan Department of Public Health D.

C.

Cook, LPH, NRR