IR 05000313/1994002
| ML20059F414 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 01/11/1994 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Yelverton J ENTERGY OPERATIONS, INC. |
| References | |
| NUDOCS 9401140012 | |
| Download: ML20059F414 (6) | |
Text
.-
--,
-
-
-
,...
-.
4R RfC UNITED ST ATES
-
_ y,-..
..
. ?g NUCLEAR REGULATORY' COMMISSION
i
.,d.'
- . } '
G11 RY AN PLAZA DRIVE, SUITE 400
REGION IV
,
o,
[~
F ARUNGTON, T E XAS 76011-8064
_
I
'JAN I i 1994 Dockets:
50-313 50-368 Licenses: DPR-51
>
.
Entergy Operations, Inc.
ATTN:
J. W. Yelverton, Vice President Operations, Arkansas Nuclear One Route 3, Box 137G Russellville, Arkansas 72801
SUBJECT:
SERVICE WATER SYSTEM OPERATIONAL PERFORMANCE INSPECTION -
[
REPORT NO. 50-313/94-02; 50-368/94-02 i
As stated in our April 30, 1993, letter, we are planning to conduct a Service
.
Water System Operational Performance Inspection.(SWSOPI) at your Arkansas
!
Nuclear One facility.
We have scheduled this inspection for the period from
.
July 25 through August 12, 1994. The change to the inspection schedule was discussed with Mr. M. Cooper of your staff on December 21, 1993.
.
The inspection will utilize the guidance. contained in Temporary
,
Instruction 2515/118, " Service Water System Operational Performance Inspections (SWSOPI)," Revision 1.
The inspection will, however, be a limited scope effort that will focus on the implementation of your Service. Water Integrity Program.
The inspection will be performed by three inspectors
during two 1-week site visits separated by 1 week of inoffice review.
+
In order to implement an efficient inspection, the team would like to conduct l
a short entrance meeting with those involved members of your staff on July 25, i
'
1994.
The team would appreciate a short (1-hour) presentation on the' design, operation,'and history of the service water system at the conclusion of the entrance meeting.
Attached to this letter is a list of materials that the team will require for the inspection.
We request that the material be available for the team on
.
July 25, 1994.
-]
~
l
.
130022 Il I
9401140012 949111 PDR ADOCK 05000313-O PDR
-
..
.
.
._.
..
.
.
Entergy Operations, Inc.
-2-Should you have any questions on the inspection or the requested material, please contact Mr. P. Wagner at (817) 860-8127.
Sincerely, a e Director
.
Division of Reactor Safety Attachment: As stated cc w/ attachment:
Entergy Operations, Inc.
ATTN:
Harry W. Keiser, Executive Vice President & Chief Operating Officer P.O. Box 31995 Jackson, Mississippi 39286-1995 Entergy Operations, Inc.
ATTN: John R. McGaha, Vice President Operations Support P.O. Box 31995 Jackson, Mississippi 39286 Wise, Carter, Child & Caraway ATTN: Robert B. McGehee, Esq.
P.O. Box 651 Jackson, Mississippi 39205 Honorable C. Doug Luningham County Judge of Pope County Pope County Courthouse Russellville, Arkansas 72801 Winston & Strawn ATTN:
Nicholas S. Reynolds, Esq.
1400 L Street, N.W.
Washington, D.C.
20005-3502 Arkansas Department of Health ATTN: Ms. Greta Dicus, Director Division of Radiation Control and Emergency Management 4815 West Markham Street Little Rock, Arkansas 72201-3867
_ ___
_
_ _. _
__.
.. _.____
.-
.
r
.
..
I Entergy Operations, Inc.
-3-B&W Nuclear Technologies ATTN: Robert B. Borsum Licensing Representative 1700 Rockville Pike, Suite 525 Rockville, Maryland 20852
,
Admiral Kinnaird R. McKee, USN (Ret)
214 South Morris Street Oxford, Maryland 21654
,
ABB Combustion Engineering Nuclear Power ATTN: Charles B. Brinkman i
Manager, Washington Nuclear Operations 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 l
,
.,__.-_. _
_
. -
-
-
..
i
..
_..
=
.-.
. _ _ _. _
....
_.
._
__
_
.,
,
JAN-1 i 1994
.
Entergy Operations, Inc.
-4-l
,
E-Mail report to D. Sullivan (DJS)
.
'
bec'to DMB (IE01)
bec distrib.. by RIV:
I J. L. Milhoan Resident Inspector l
DRP Section Chief (DRP/0)
Lisa Shea, RM/ALF, MS: MNBB 4503 HIS System
'
DRSS-FIPS RIV File Project Engineer (DRP/D)
Section Chief (DRP/TSS)
P. Wagner T. Westerman J. Pellet G. Imbro, NRR, MS: 9Al C. McCracken, NRR, MS: 8D1 DRS
.
l
)
!
RIV:TL:DRSh DD:DRS(b D:DRP[A D:D R
/
PCWagner:dif ATHowell ABBeach[
S[Cbip[
l/11/94 i ' n/94 1/ \\'y94 lhpM
'
- -
-
,
.-
-
,
,,,,,
.. -
.-.
.
.
-
-.
-.
...
.
. -.
-.
-
.,
l
...
r
!
.
JAN I I'1994 Entergy Operations, Inc.
-4-
i E-Mail report to D. Sullivan (DJS)
j
'
bcc to DMB (IE01)
!
bec distrib. by RIV:
,
'J. L. Milhoan Resident Inspector i
'
DRP Section Chief (DRP/D)
Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System
.
DRSS-FIPS RIV File
Project Engineer (DRP/D)
Section Chief (DRP/TSS)
P. Wagner T. Westerman J. Pellet G. Imbro, NRR, MS: 9Al C. McCracken, NRR, MS: 8D1 DRS
!
!
,
!
,
,
,
i
!
,
t
!
I
!
t
i
-
i RIV:TL:DRSh DD:DRS($E D:DRPlk
,
D:D R
/
PCWagner:dlf ATHowell ABBeachY[
S[Cbip[
1/ti/94 1/ \\\\/94 1/ 0 94 IkWM
,
I i
k
_.,
.-
.
- - _.
_
_.
._
_
_
__
- __..
.. _. _
_ __
.
,
.
.
ATTACHMENT
.
'
LIST OF MATERIALS TO SUPPORT THE SWSOPI l.
Service Water System (SWS) descriptions and associated P& ids;
2.
Design basis and other design documents (procurement specifications and vendor manuals for pumps, valves, heat exchangers, etc.; thermal and
'
hydraulic calculations and analyses);
-
3.
Pump curves and test results data;
,
4.
Flow and heat transfer test results data; i
i S.
Licensing basis, Technical Specifications, and commitments; 6.
Water hammer and surge pressure protection information and analyses;
7.
A copy of the completed preoperational testing program results and
copies of any subsequently completed system tests not included in'the
!
above requests-t i
8.
Descriptions of all modification to the SWS, 9.
Documentation relevant to the analyses, testing, procedure changes, and
,
inspections of the SWS credited for satisfying the actions requested by i
Generic Letter 89-13; 10.
Normal, off-normal, and emergency operating procedures; i
11.
Maintenance and surveillance (including ISI and IST) procedures; 12.
Information on the SWS training provide for maintenance and operations personnel including lesson plans, task performance measures, etc.;
13.
Maintenance histories of major SWS components, the status of maintenance and surveillance that were overdue, and a listing of all such activities that are scheduled to be conducted during the inspection period;
14.
Descriptions of the programs for the control of biofouling, silting, and i
corrosion, including the involved implementing procedures; and i
j e
15.
A description of the scope, findings, and conclusions of any service j
water system QA audits and any other self-assessment activities.
)
a
-
-
.
.
..
-
-