Notifies That SWS Operational Performance Insp Rept 50-313/94-02 & 50-368/94-02 to Be Conducted at Plant on 940725-0812.Listed Ref Matl Requested Prior to Insp
ML20059F414
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 01/11/1994
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Yelverton J
ENTERGY OPERATIONS, INC.
References
NUDOCS 9401140012
Download: ML20059F414 (6)


Text

.-

--,

-

-

-

,...

-.

4R RfC UNITED ST ATES

-

_ y,-..

..

. ?g NUCLEAR REGULATORY' COMMISSION

i

.,d.'

. } '

G11 RY AN PLAZA DRIVE, SUITE 400

REGION IV

,

o,

[~

F ARUNGTON, T E XAS 76011-8064

_

I

'JAN I i 1994 Dockets:

50-313 50-368 Licenses: DPR-51

NPF-6

>

.

Entergy Operations, Inc.

ATTN:

J. W. Yelverton, Vice President Operations, Arkansas Nuclear One Route 3, Box 137G Russellville, Arkansas 72801

SUBJECT:

SERVICE WATER SYSTEM OPERATIONAL PERFORMANCE INSPECTION -

[

REPORT NO. 50-313/94-02; 50-368/94-02 i

As stated in our April 30, 1993, letter, we are planning to conduct a Service

.

Water System Operational Performance Inspection.(SWSOPI) at your Arkansas

!

Nuclear One facility.

We have scheduled this inspection for the period from

.

July 25 through August 12, 1994. The change to the inspection schedule was discussed with Mr. M. Cooper of your staff on December 21, 1993.

.

The inspection will utilize the guidance. contained in Temporary

,

Instruction 2515/118, " Service Water System Operational Performance Inspections (SWSOPI)," Revision 1.

The inspection will, however, be a limited scope effort that will focus on the implementation of your Service. Water Integrity Program.

The inspection will be performed by three inspectors

during two 1-week site visits separated by 1 week of inoffice review.

+

In order to implement an efficient inspection, the team would like to conduct l

a short entrance meeting with those involved members of your staff on July 25, i

'

1994.

The team would appreciate a short (1-hour) presentation on the' design, operation,'and history of the service water system at the conclusion of the entrance meeting.

Attached to this letter is a list of materials that the team will require for the inspection.

We request that the material be available for the team on

.

July 25, 1994.

-]

~

l

.

130022 Il I

9401140012 949111 PDR ADOCK 05000313-O PDR

-

..

.

.

._.

..

.

.

Entergy Operations, Inc.

-2-Should you have any questions on the inspection or the requested material, please contact Mr. P. Wagner at (817) 860-8127.

Sincerely, a e Director

.

Division of Reactor Safety Attachment: As stated cc w/ attachment:

Entergy Operations, Inc.

ATTN:

Harry W. Keiser, Executive Vice President & Chief Operating Officer P.O. Box 31995 Jackson, Mississippi 39286-1995 Entergy Operations, Inc.

ATTN: John R. McGaha, Vice President Operations Support P.O. Box 31995 Jackson, Mississippi 39286 Wise, Carter, Child & Caraway ATTN: Robert B. McGehee, Esq.

P.O. Box 651 Jackson, Mississippi 39205 Honorable C. Doug Luningham County Judge of Pope County Pope County Courthouse Russellville, Arkansas 72801 Winston & Strawn ATTN:

Nicholas S. Reynolds, Esq.

1400 L Street, N.W.

Washington, D.C.

20005-3502 Arkansas Department of Health ATTN: Ms. Greta Dicus, Director Division of Radiation Control and Emergency Management 4815 West Markham Street Little Rock, Arkansas 72201-3867

_ ___

_

_ _. _

__.

.. _.____

.-

.

r

.

..

I Entergy Operations, Inc.

-3-B&W Nuclear Technologies ATTN: Robert B. Borsum Licensing Representative 1700 Rockville Pike, Suite 525 Rockville, Maryland 20852

,

Admiral Kinnaird R. McKee, USN (Ret)

214 South Morris Street Oxford, Maryland 21654

,

ABB Combustion Engineering Nuclear Power ATTN: Charles B. Brinkman i

Manager, Washington Nuclear Operations 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 l

,

.,__.-_. _

_

. -

-

-

..

i

..

_..

=

.-.

. _ _ _. _

....

_.

._

__

_

.,

,

JAN-1 i 1994

.

Entergy Operations, Inc.

-4-l

,

E-Mail report to D. Sullivan (DJS)

.

'

bec'to DMB (IE01)

bec distrib.. by RIV:

I J. L. Milhoan Resident Inspector l

DRP Section Chief (DRP/0)

Lisa Shea, RM/ALF, MS: MNBB 4503 HIS System

'

DRSS-FIPS RIV File Project Engineer (DRP/D)

Section Chief (DRP/TSS)

P. Wagner T. Westerman J. Pellet G. Imbro, NRR, MS: 9Al C. McCracken, NRR, MS: 8D1 DRS

.

l

)

!

RIV:TL:DRSh DD:DRS(b D:DRP[A D:D R

/

PCWagner:dif ATHowell ABBeach[

S[Cbip[

l/11/94 i ' n/94 1/ \\'y94 lhpM

'

- -

-

,

.-

-

,

,,,,,

.. -

.-.

.

.

-

-.

-.

...

.

. -.

-.

-

.,

l

...

r

!

.

JAN I I'1994 Entergy Operations, Inc.

-4-

i E-Mail report to D. Sullivan (DJS)

j

'

bcc to DMB (IE01)

!

bec distrib. by RIV:

,

'J. L. Milhoan Resident Inspector i

'

DRP Section Chief (DRP/D)

Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System

.

DRSS-FIPS RIV File

Project Engineer (DRP/D)

Section Chief (DRP/TSS)

P. Wagner T. Westerman J. Pellet G. Imbro, NRR, MS: 9Al C. McCracken, NRR, MS: 8D1 DRS

!

!

,

!

,

,

,

i

!

,

t

!

I

!

t

i

-

i RIV:TL:DRSh DD:DRS($E D:DRPlk

,

D:D R

/

PCWagner:dlf ATHowell ABBeachY[

S[Cbip[

1/ti/94 1/ \\\\/94 1/ 0 94 IkWM

,

I i

k

_.,

.-

.

- - _.

_

_.

._

_

_

__

- __..

.. _. _

_ __

.

,

.

.

ATTACHMENT

.

'

LIST OF MATERIALS TO SUPPORT THE SWSOPI l.

Service Water System (SWS) descriptions and associated P& ids;

2.

Design basis and other design documents (procurement specifications and vendor manuals for pumps, valves, heat exchangers, etc.; thermal and

'

hydraulic calculations and analyses);

-

3.

Pump curves and test results data;

,

4.

Flow and heat transfer test results data; i

i S.

Licensing basis, Technical Specifications, and commitments; 6.

Water hammer and surge pressure protection information and analyses;

7.

A copy of the completed preoperational testing program results and

copies of any subsequently completed system tests not included in'the

!

above requests-t i

8.

Descriptions of all modification to the SWS, 9.

Documentation relevant to the analyses, testing, procedure changes, and

,

inspections of the SWS credited for satisfying the actions requested by i

Generic Letter 89-13; 10.

Normal, off-normal, and emergency operating procedures; i

11.

Maintenance and surveillance (including ISI and IST) procedures; 12.

Information on the SWS training provide for maintenance and operations personnel including lesson plans, task performance measures, etc.;

13.

Maintenance histories of major SWS components, the status of maintenance and surveillance that were overdue, and a listing of all such activities that are scheduled to be conducted during the inspection period;

14.

Descriptions of the programs for the control of biofouling, silting, and i

corrosion, including the involved implementing procedures; and i

j e

15.

A description of the scope, findings, and conclusions of any service j

water system QA audits and any other self-assessment activities.

)

a

-

-

.

.

..

-

-