IR 05000309/1979008

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-309/79-08 on 790613-15.No Noncompliance Noted.Major Areas Inspected:Fire Prevention Program Including Administrative Control,Maint,Training & Condition of Equipment
ML19254E906
Person / Time
Site: Maine Yankee
Issue date: 09/10/1979
From: Ebneter S, Paolino R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19254E900 List:
References
50-309-79-08, 50-309-79-8, NUDOCS 7911050041
Download: ML19254E906 (9)


Text

.

.

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No. 50-309/79-08 Docket No. 50-309 License No. DPR-36 Priority

--

Category C

Licensee:

Maine Yankee Atomic Power Company 20 Turnpike Road Westborough, Massachusetts 01581 Facility Name:

Maine Yankee Atomic Power Station Inspeution at:

Wiscasset, Maine Inspection conducted: June 13-15,1979 Inspectors:

/;/

P

_ f-I- 7f ~

R. ' P ido',' Re' acto"r Inspector

/date signed date signed

' ate signed

.

Approved by: /2Nd/

'?

'-79 S. D. Ebneter, Chief, Engineer Support date signed Section 2, RC&ES Branch Insoection Summary:

Inspection on June 13-15, 1979 (IE Report No. 50-309/79-08)

'

Areas Inspected:

Routine, unannounced facility inspection by regional based inspector of the licensee's fire prevention / protection program, including functional responsibili-ties and administrative controls, modifications and maintenance activities, fire brigade qualification and training, general conditions of fire protection cquipment/

systems and associated components. The inspector also reviewed status oi modification and

"

implementation of procedures outlined in amendment 37, addressing fire protection, Technical Specifications, and facil.ty fire prevention / protection programs.

The inspections involved 16 inspection hours on site by one NRC regional based inspector.

Results:

No items of noncompliance were identified.

1267 355 Region I Form 12 (Rev. April 77)

7 g y 105 0 ol[ (

.

.

DETAILS 1.

Persons Contacted P. Anderson, Administrative Department Head R. Forrest, Fire Loss Prevention Manager C. Frizzle, Assistant Plant Surerintendent The above personnel were present at the exit interview.

2.

Fire Protection / Prevention Program a.

Functional Responsibilities The inspector reviewed licensee procedure No. 260.1 revision 1, dated February 6, 1979, and procedure No. 260.3, revision 0, dated August 24, 1977, verifying that the licensee has developed functional responsibilities and lines of communication for licensee personnel having responsibility for fire protet. tion / prevention activities.

No items of noncompliance were identified.

b.

Administrative Controls The inspector reviewed Administrative Procedure No's. 260.1, 260.3, 260.6 and attachment A to the above verifying that the licensee has developed administrative controls which include:

(1)

Periodic audits (2)

Indoctrination of all contractor personnel and off-site licentee personnel who work onsite (3)

Identification of action to be taken by individuals discovering a fire and subsequent action by control room personnel (4) Oualification of fire brigade members.

No items of noncompliance were identified.

'

c.

Control of Combustibles The inspector reviewed the licensee's Safety Manual dated September, 1977 referenced in the Administrative Procedures verifying that the Safety Manual includes:

1267 356

.

.

(1) Special authorization for use of combustibles, flammable or explosive materials in safety related areas (2) Prohibits storage of combustibles, flammable materials or explosives in safety related areas (3) Requirement for the removal of all waste, debris, rags, oil and other combustible materials resulting from work activity upon completion of that activity or at the end of each work shift, whichever is sooner (4) Requirement that all wood used in safety related areas be treated with flame retardent (5) Requirement for periodic facility inspection for accumulation of combustibles (6)

Prohibits smoking in safety related areas except in specifdc areas designated by management.

Administrative Procedure No. 260.7, revision 0, dated June 23, 1978 has been developed for control of ignition sources by requiring,

special authorization for activities involving open flame, welding or other ignition sources and taking cognizance of nearby flammable materials, cable trays or critical process equipment.

No items of noncompliance were identified.

d.

Fire Fighting Procedures The insepctor reviewed licensee Administrative Procedure No.

260.1 verifying that the procedure includes:

(1) Actions to be taken by the fire brigade (2) Coordination of fire fighting activities with offsite fire department (3) Actions taken by plant superintendent (4)

Instructions for plant operators and general plant personnel

,

during a fire.

Fire fighting strategies have not been completed. The licensee has requested an extension into the next cycle (1979) in a letter to the NRC dated August 14, 1978.

No items of noncompliance were identified.

1267 357

.

.

e.

Fire Brigade Training The inspector reviewed licensee Administrative Procedure No.

260.6 revision 1, dated June 23. 1978, verifying that the procedure includes:

(1) Requirement for announced and unannounced fire drills (2) Requirement for at least one drill per year on "backshift" for each brigade.

The procecure does not specify annual drill participation requirements for offsite fire department. However, licensee records indicate local fire department participation in a fire drill on site on November 5, 1978.

The licensee said the procedure would be changed to reflect the annual drill requirement with the local fire department.

No items of noncompliance were identified.

3.

Implementation '

a.

Fire Inspections The irspector reviewed the loss prevention report dated November 9,1979, for property file No. N-142, completed by the licensee's insurer, American Nuclear Insurers (ANI). The report identifies changes involving the additon of hose : 'tions in several areas of the plant and the addition of an aut. atic C02 system in the Cable Vault and the Cable Spreading Room and a sprinkler system in the Cable Vault. The report also lists eight previous recommendations dating back to 1969.

The licensee has committed to completion of items 69-20-b and e, 69-27, 76-1-b, 76-3, 76-4.

In addition, the inspector reviewed the weekly fire oriented housekeeping type inspections for the period July 19, 1978 through March 28,1979.

No items of noncompliance were identified.

b.

Modifications per Amendment No. 37 By work observation and examination of maintenance records, the inspector verified licensee compliance with scheduled implementation dates identified in table 3.1 of the Fire Protection Safety Evaluation Report (SER) for modifications listed in paragraph 3.1.1 through 3.1.18 of the SER.

1267 35B

.

.

For this determination, the inspector examined the following items scheduled for completion by end of 1978 refueling outage:

_._ -

(1) SER 3.1.2 a.

Nozzle replacement for areas containing electrical equipment; b.

Additional hose lengths in cable tray rooms; c.

Replacement of substandard fitting at hose station No.

79.

(2) SER 3.1.3

-

Additional equipment for hose houses nearest circulating a.

water pump house and the fire pump house consisting of:

2 1/2 inch hose

.

--

2 1/2 x 1 1/2 x 1 1/2 inch gate wye valves

--

75 ft. 1 1/2 inch hose (2)

--

1 1/2 inch adjustable nozzle (2)

--

b.

Suitable guard posts at hydrants and post indicator valves subject to vehicluar damage.

c.

Suitable hydrant wrenches at each hose house.

d.

2 1/2 inch gated valve at each hydrant preconnected to 2 1/2 inch hose.

(3) SER 3.1.2 a.

A 2 1/2 gallon water extinguisher for each of the following:

Control Room (1)

--

Computer Room (i)

--

Protected Switchgear Room (1)

--

Protected Cable Tray Room (1)

--

Circulating Water Pump House (2)

--

1267 359

.

.

G b.

Portable extinguisher on each welding cart in the turbine building.

c.

Portable Carbon Dioxide (CO2) extinguisher in the Protected Switchgear lom.

d.

20 lb. class A, B, C dry chemical extinguisher in the Protected Cable Tray Room.

(4) SER 3.17 a.

Modification of fire door to computer room from control room to remain normally closed.

.

b.

All doors to Protected Switchgear Room to be maintained as positive closing and latching.

_

c.

Replacement of fusible link on sliding door to turbine oil storage room with an unpainted fuseable link.

d.

Positive latching, self-closing door between fuel building and radioactive control area.

e.

Curbing or sealed doorway in northeast corner of turbine building. ( Licensee choose to seal the doorway.)

(5) cER 3.1.10 Portable ventilation exhaust duct for Protected Cable Vault.

(6) SER 3.1.11 a.

Relocation of air compressor used in recharging air breathing cylinders to an accessible area free of oil, fumes, dust and radioactive contaminants.

b.

Addition of two self-contained air breathing units near containment entrance.

(7) SER 3.1.12 a.

Four inch curb at entrance to Control Room.

b.

Replacement of wood cabinets in kitchen with cabinets of non-combustible materials.

I267 360

.

c.

Color coding of hydrogen lines in turbine building, d.

Racks for drum storage in diked area of turbine lube oil storage room.

e.

Fire retardant coating for plywood equipment hatch cover.

f.

Removal of transient combustibles from steam and feedwater valve area.

g.

Securing compressed air cylinders in above area (f.) with chains.

(8) SER 3.1.13 Floor access lifting tool for the computer room.

(9)

SER 3.1.15 Additional comunication equipment for exclusive use of fire brigade consisting of spare portable radios and voice-powered head set unit.

(10) SER 3.1.17 Changes to Administrative Controls to incorporate Fire Protection /

Prevention Program.

(11). SER 31.1.8 Addition of battery powered, hand neld sealed beam emergency lights.

No items of noncompliance were identified.

c.

Training The inspector reviewed the fire brigade training records for 1979, verifying that the licensee was complying with the annual 10 : sour 1.;aining commitment.

The inspector noted that the training records listed the reactor operators as attendees to the fire birgade training sessions though they were not fire brigade members.

No items of nonccmpliance were idencified.

\\26 n/ i

.

d.

Drills The inspector witnessed two unannounced fire drills with the licensee's fire protection coordinator. Both drills were conducted on June 13, 1979.

For the first drill, which was held at one o' clock, a wood crate, placed in the open area between the turbine building and the circulating ater pump house was ignited for the fire fighting effort.

Eight i.inutes laspe before brigade members appeared on the scene of the first fire drill.

The shift supervisor appeared on the fire scene within two (2) minutes after ignition of wood crate. Water was not available for eleven minutes after init!al ignition of wood crate. When the water was finally put into service, misalignment of water control valve resulted in low water pressure making it difficult to extinguish fire.

No attempt was made by brigade members to realign water control valve.

The fire was extinguished thirteen minutes after ignition of wood crate. Brigade members were not properly dressed to fight a real fire had there been one.

Response to the second fire drill was much better.

Brigade members were on the scene within two minutes after ignition of wood crate.

However, brigade members appeared on the scene partially clothed in fire protection clothing. Water was turned on within five minutes after ignition of wood crate with sufficient water pressure to provide necessary stream to combat fire.

The fire in the wood crate diminished before brigade members could apply the water.

The Fire Protection Coordinator agreed with the inspector that the fire drills did not meet the objectives of the drill. A critique is to be performed to determine areas of improvement.

This item is unresolved pending NRC review of licensee's evaluation and corrective action.

(79-08-01)

e.

Facility Tour The inspector examined the yard fire protection equipment, including positions of indicator valves, protection of valves and hydrants against vehicular damage and the contents of hose houses.

The inspector examined fire alarm and fire extinguishing systems in the control room complex, switchgear room cable vault, battery rooms, diesel generator building and the fire pump rooms.

The inspector rcndomly checked tags and maintenance records of portable hand extinguishers, and wheeled extinguishers for evidence of periodic inspections. No deterioration of equipment was noted and the maintenance record indicated that the required inspections and surveillance were performed.

No items of noncompliance were identified.

1267 562

.

,

.

4.

Unresolved Items Unresolved items are matters about which more information is required in order to ascertain whether they are acceptable items, items of noncompliance, or deviations. Unresolved items disclosed during this inspection are discussed in paragraph-d.

5.

Exit Interview The inspector met with licensee representatives (denoted in Detail, paragraph 1) at the conclusion of the inspection on June 15, 1979.

The inspector summarized the purpose and the scope of the inspection and the findings. The inspector expressed a concern regarding the manner in which the fire drills were conducted and the lack of enthusiasm in the response.

I267 363

.

6