U.S. NUCLEAR KtCULATORY COM'!ISSION OFFICE OF INSPECTION A';D ENFORCEMENT
REGION III
r Report No. 50-305/78-23
~
,
Doc ke t No. 50-305
.-
License No. DPR-43
-.
Licensee: Wisconsin Public Service Corporation Post Office Box 1200 Green Bay, WI 54305 Facility Name: Kewaunee Nuclear Power Plant Inspection At: Kewaunee Site, Kewaunee, WI Inspection Conducted: November 27-December 1, 1978
.
s
.-
%dmN
'
LQ'
Inspectors:
J. R. Creed
/ i 79
//
. f.
'
~~ s.
i fic.f'74
-
J. C. Howell-r..
,
.
.
,
,(f.
e u< f j/
A. Hi d, Chief
///C/ 79 Approved By:
a.
Safeguards Branch Inspection Summary Inspection on November 27-December 1, 1978 (Report No. 50-305/78-23)
Areas Inspected: Unannounced inspection regarding, (a) actions taken by the licensee to address a deviation, identified during an inspection con-ducted June 6-8, 1978; (b) progress of procurement construction and pre-
operational activities being undertaken by the licensee to implement all provis..ons of the rule; (c) the applicable procedural aspects of 10 CFR 73.55, which became effective on May 25, 1978; (d) the approved security plan, for those non-procedural aspects of the rule; (e) action taken by the licensee as a result of IE Circular No. 7d-17.
Specif!cally, the inspection covered areas relative to physical barriers, access controls, detection aids, testing and maintenance of security related equipment, 79020103 3
.,
.
response requirements; and (f) 10 CFR 73.70 records. The inspection involved 68 inspector-hours onsite by two NRC inspectors.
Results: Of the six areas specifically inspected, no items of noncompli-ance were identified in three areas; three items of noncompliance were identified in three areas (Access Controls - Paragraph 3; Co==unications Controls - Paragraph 4;; Records - Paragraph 5).
f Details (Part 2.790(d) Information)
O.
-
,
-
-
-
-2-