IE Insp Rept 50-305/78-23 on 781127-1201.Details Withheld (Ref 10CFR2.790)
ML20062G753
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 01/10/1979
From: Creed J, Hind J, Howell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20062G752 List:
References
50-305-78-23, NUDOCS 7902010343
Download: ML20062G753 (2)


Text

.

U.S. NUCLEAR KtCULATORY COM'!ISSION OFFICE OF INSPECTION A';D ENFORCEMENT

REGION III

r Report No. 50-305/78-23

~

,

Doc ke t No. 50-305

.-

License No. DPR-43

-.

Licensee: Wisconsin Public Service Corporation Post Office Box 1200 Green Bay, WI 54305 Facility Name: Kewaunee Nuclear Power Plant Inspection At: Kewaunee Site, Kewaunee, WI Inspection Conducted: November 27-December 1, 1978

.

s

.-

%dmN

'

LQ'

Inspectors:

J. R. Creed

/ i 79

//

. f.

'

~~ s.

i fic.f'74

-

J. C. Howell-r..

,

.

.

,

,(f.

e u< f j/

A. Hi d, Chief

///C/ 79 Approved By:

a.

Safeguards Branch Inspection Summary Inspection on November 27-December 1, 1978 (Report No. 50-305/78-23)

Areas Inspected: Unannounced inspection regarding, (a) actions taken by the licensee to address a deviation, identified during an inspection con-ducted June 6-8, 1978; (b) progress of procurement construction and pre-

operational activities being undertaken by the licensee to implement all provis..ons of the rule; (c) the applicable procedural aspects of 10 CFR 73.55, which became effective on May 25, 1978; (d) the approved security plan, for those non-procedural aspects of the rule; (e) action taken by the licensee as a result of IE Circular No. 7d-17.

Specif!cally, the inspection covered areas relative to physical barriers, access controls, detection aids, testing and maintenance of security related equipment, 79020103 3

.,

.

response requirements; and (f) 10 CFR 73.70 records. The inspection involved 68 inspector-hours onsite by two NRC inspectors.

Results: Of the six areas specifically inspected, no items of noncompli-ance were identified in three areas; three items of noncompliance were identified in three areas (Access Controls - Paragraph 3; Co==unications Controls - Paragraph 4;; Records - Paragraph 5).

f Details (Part 2.790(d) Information)

O.

-

,

-

-

-