ML20062G745

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-305/78-23 on 781127-1201.Notice of Violation Withheld (Ref 10CFR2.790)
ML20062G745
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 01/12/1979
From: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: James E
WISCONSIN PUBLIC SERVICE CORP.
Shared Package
ML20062G752 List:
References
NUDOCS 7902010340
Download: ML20062G745 (2)


See also: IR 05000305/1978023

Text

. -

.- -

- -

. . _ .

-

..

_-=,

. .-

. . .

..

. _. _. . -

1

'

.

.

'I~

  • ;

.

    • "D

i

. UNITED STATES

., v

.

NUCLEAR REGULATORY COMMISSION

,

f

,s' # b I b

REGION lli

.

U.

.

f

799 RooSsVE LT Ro AD

. %, 4j'

otsu sotvs. ittisois sci:7

{

,

J,'i19.jG

'

,

'

O

i/

Docket N . 50-305

i

f

  • .:

Wisconsin Pu

Service

.

l

Corporation

ATIN:

Mr. E. W. James

i

Senior Vice President

Power Generation and

Engineering

Post Office Box 1200

,

Green Bay, WI 54305

Gentlemen:

This refers to the inspection conducted by Messrs. J. R. Creed and

J. C. Howell of this office on Nove=ber 27-December 1,1978, of

I

activities at the Kewaunee Nuclear Power Plant' authorized by KRC

Operating License No. DPR-43 and to the discussion of our findings

with Messrs. M. Stern, G. Ruiter, C. Luoma, T. Moore and D. Raine

at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

i

examined during the inspection. Within these areas, the

!

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

During this inspection, certain of your activities appeared

,

to be in noncompliance with NRC requirements, as described

in the enclosed Appendix A.

t

(

This notice is sent to you pursuant to the provisions of'Secticn

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code

.

j

of Federal Regulations. Section 2.201 requires you to submit to

j

this office within twenty days of your receipt of this notice a

'

written statement or explanation in reply, including for each

I

item.of noncompliance: (1) corrective action taken and the results

achieved; (2) corrective action to be taken to avoid further ncn-

compliance; and (3) the date when full compliance will be achieved.

I

!

!

,

s

7 9 0 2 010 3c/o

.

. -

.

.

.

.

.

.. ..

.

. .

. .

.

. - - . ~.

,

-

\\

2

1

Wisconsin Public Service

-2-

Corporation

Areas examined during this inspection concern a subject matter

which is exempt from disclosure according to Section 2.790 of

theNRC's"Rulesoffractice,"Part 2 Title 10, Code of Federal

Regulations. Consequently, the enclosure to this letter, our

_

ri

report of this inspe'ction, and your response to the noncompliance

~

,7

identified in the enclosure to this letter will not be placed in

the Public Document Room. Therefore, your statement of corrective

action regarding the noncompliance identified in the enclosure

should be submitted as a separate enclosure to your transmittal

letter.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

,gf.f'

-

J. A. Hind, Chief

Safeguards Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-305/78-23

(Part 2.790(d) Information)

cc w/encls:

Mr. C. Luoma, Plant

Superintendent

Central Files

Reproduction L' nit NRC 20b

cc w/o encls:

PDR

Local PDR