September 20, 2007
SUBJECT:
NRC INSPECTION REPORT 050-00295/07-02(DNMS) -
ZION NUCLEAR STATION
Dear Mr. Crane:
On September 7, 2007, the NRC completed an inspection at the Zion Nuclear Station. The purpose of the inspection was to determine whether decommissioning activities were conducted safely and in accordance with NRC requirements. Specifically, the inspector evaluated organization and management controls, safety reviews, maintenance and surveillance, and radiological waste. At the conclusion of the inspection on September 7, 2007, the NRC inspector discussed the findings with members of your staff.
The inspection consisted of an examination of activities at the facility as they relate to safety and compliance with the Commissions rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, field observations of activities in progress, and interviews with personnel.
Based on the results of this inspection, the NRC did not identify any violations.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). The NRCs document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you may have regarding this inspection.
Sincerely,
/RA/
Patrick L. Louden, Chief
Decommissioning Branch
Docket No. 05000295 License No. DPR-39
Enclosure:
Inspection Report 050-00295/07-02(DNMS)
REGION III==
Docket No.:
050-00295
License No.:
Report No.:
050-00295/07-02(DNMS)
Licensee:
Exelon Generation Company, LLC
Facility:
Zion Nuclear Station
Location:
101 Shiloh Boulevard
Zion, IL 60099
Date:
September 5 through 7, 2007
NRC Inspector:
Peter J. Lee, Ph.D., CHP, Health Physicist
Approved by:
Patrick L. Louden, Chief
Decommissioning Branch
Division of Nuclear Materials Safety
Enclosure
EXECUTIVE SUMMARY
Zion Nuclear Station
NRC Inspection Report 050-00295/07-02(DNMS)
This routine decommissioning inspection focused on the evaluation of the licensees facility management and control, decommissioning support activities, spent fuel safety, and radiological safety.
Facility Management and Control
!
The inspector determined that the licensees staffing was adequate for the level of work being performed at the site and met the requirements established in licensee procedures. The licensee properly implemented training programs for general employee training and fuel handling. (Section 1.1)
!
The inspector determined that the licensees process for evaluating the safety impacts of facility changes was in compliance with the requirements of 10 CFR Part 50.59.
(Section 1.2)
Decommissioning Support Activities
!
The inspector determined that the licensee implemented its maintenance and surveillance programs in accordance with its procedures and NRC regulations.
(Section 2.1)
Radiological Safety
!
The inspector determined that the licensee conducted the transfer of spent resin from the storage tank to the shipping cast in accordance with its procedures and As-Low-As-is-Reasonably-Achievable (ALARA) plan. (Section 3.1)
Enclosure
Report Details
Summary of Plant Activities
During the period covered by this inspection, the licensee maintained the spent fuel in storage within the spent fuel pool and transferred the spent resin to the shipping cast.
1.0 Facility Management and Control
1.1 Organization, Management and Cost Controls (IP 36801)
a.
Inspection Scope
The inspector evaluated the licensees staffing and two training programs: Nuclear General Employee Training - (NGET); and Certified Fuel Handler Initial Training and Retraining Program. The inspector reviewed the site training matrix, and the licensees tracking and implementation of certified fuel handler and NGET training.
b.
Observations and Findings
The licensee made changes to its staffing at the station since the last inspection. The changes included the filling of two positions: Maintenance Mechanist and Health Physics Technician. Each of the positions were described in licensee procedure ZAP 200-01, Zion Decommissioning Organization, Revision 9.
The licensee tracked required training for station personnel using the site training matrix. Licensee personnel received annual operating examinations, and biennial written examinations in accordance with Training Procedure Description (TPD)-312, Certified Fuel Handler Initial Training and Retraining Program Description, Revision 0, dated May 22, 1998; and annual NGET training documented on TQ-AA-210-4105, Course Attendance Sheet, Revision 1. All personnel taking the examinations reviewed during this inspection period scored passing grades on the exams.
c.
Conclusions
The inspector determined that the licensees staffing was adequate for the level of work being performed at the site and met the requirements established in licensee procedures. The licensee properly implemented training programs for general employee training and fuel handling.
1.2 Safety Reviews, Design Changes, and Modifications (IP 37801)
a.
Inspection Scope
The inspector reviewed the licensees safety screening reviews to verify that completed reviews were consistent with the requirements of 10 CFR Part 50.59. The review included selected screening reviews completed since January 2007.
Enclosure b.
Observations and Findings
The licensees Administrative Procedure ZAP-100-06 was consistent with the NRCs guidance on 10 CFR 50.59 screening reviews. The licensee conducted several safety screening reviews of facility changes and none of the changes required a formal 10 CFR Part 50.59 safety evaluation.
c.
Conclusions
The inspectors determined that the licensees process for evaluating the safety impacts of facility changes was in compliance with the requirements of 10 CFR 50.59.
2.0 Decommissioning Support Activities
2.1 Maintenance and Surveillance (IP 62801)
a.
Inspection Scope
The inspector reviewed the licensees annual assessment of its 10 CFR Part 50.65, Maintenance Rule (MR) program for the 2006 calendar year. The inspectors also reviewed the work orders associated with MR summary of performance for the first and second quarter of 2007, to verify that maintenance and surveillance for structures, systems, and components (SSCs) important to spent Fuel Storage Safety, were conducted in a manner that provided adequate protection of spent fuel.
b.
Observations and Findings
During annual assessment, the licensee reviewed the following aspects of its MR program: changes in scope, review of goals, review of performance, corrective action effectiveness, balance of availability and reliability, and expert panel recommendations. The licensees staff reviewed 19 MR functions, 9 high importance functions and 10 low importance functions, that were documented in Attachment A of ZAP 500-13C. During the assessment period of 2006, the licensee identified two functional failures. All failures were associated with low importance functions and corrective actions had been satisfactory to prevent recurrence and were performed in a timely manner. All the work request reviews were conducted in according with the MR performance program and documented in Attachment 1 of ZAP 500-13A. There were no functional failures identified during the first and second quarter of 2007.
c.
Conclusions
The inspector determined that the licensee implemented its maintenance and surveillance programs in accordance with its procedures and NRC regulations.
Enclosure
3.0 Radiological Safety
3.1 Transportation of Radioactive Materials (IP 86750)
a.
Inspection Scope
The inspector reviewed the licensees procedure for removal and transfer of spent resin from the spent resin storage tank (SRST) to the shipping cast. The inspector reviewed the ALARA plan and radiation work permits of the transfer of spent resin to verify that the licensee had established procedures, and engineering and work controls that were based on sound radiation protection principles in order to achieve occupational exposures that were ALARA. The inspector also toured the area where the spent resin transfer took place.
b.
Observations and Findings
There were about 300 cubic feet of spent resin in the SRST ready for the disposal.
During the inspection, the licensee completed the transfer of about 100 cubic feet of spent resin. The areas where the spent resin took place were posted and access was controlled in accordance with the ALARA plan. Based on the review of external exposure records, workers received doses less than the dose limits specified in radiation work permits and 10 CFR Part 20.
c.
Conclusions
The inspectors determined that the licensee conducted the transfer of spent resin from the storage tank to the shipping cast in accordance with its procedures and ALARA plan.
4.0 Exit Meeting
The inspectors presented the inspection results to licensee management at the conclusion of the inspection on September 7, 2007. The licensee acknowledged the findings presented did not identify any of the documents or processes reviewed by the inspectors as proprietary.
Attachment: Supplemental Information
Attachment
SUPPLEMENTAL INFORMATION
PARTIAL LIST OF PERSONS CONTACTED
- R. Schuster, Plant Manager
- J. Ashley, Design Engineering
- R Adams, Operations and Engineering Manager
- L. Cunningham, Security Project Manager
- M. Petersen, Administration/Training Supervisor
- Present at the September 7, 2007, exit meeting.
INSPECTION PROCEDURES (IP) USED
Management, Organization, and Cost Control IP 37801
Safety Reviews, Design Changes, and Modifications IP 62801
Maintenance and Surveillance IP 86750
Transportation of Radioactive Materials
ITEMS OPENED, CLOSED, AND DISCUSSED
Opened
None
Closed
None
Discussed
None
LIST OF ACRONYMS USED
CFR
Code of Federal Regulations DNMS
Division of Nuclear Materials Safety NGET
Nuclear General Employee Training NRC
Nuclear Regulatory Commission ALARA
As Low As is Reasonably Achievable
LICENSEE DOCUMENTS REVIEWED