MONTHYEARML24305A1492024-11-0404 November 2024 Review of the Fall 2023 Steam Generator Tube Inspection Report (O2R31) IR 05000269/20240032024-10-31031 October 2024 Integrated Inspection Report 05000269/2024003 and 05000270/2024003 and 05000287/2024003 (2) IR 05000269/20243012024-09-23023 September 2024 NRC Operator License Examination Report 05000269/2024301, 05000270/2024301, and 05000287/2024301 IR 05000269/20240052024-08-26026 August 2024 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 (Report 05000269/2024005, 05000270/2024005, and 05000287-2024005) IR 05000269/20240102024-08-0101 August 2024 Focused Engineering Inspection - Age-Related Degradation Report 05000269/2024010 and 05000270/2024010 and 05000287/2024010 IR 05000269/20240022024-07-25025 July 2024 Integrated Inspection Report 05000269/2024002 and 05000270/2024002 and 05000287/2024002 IR 05000269/20240012024-05-0303 May 2024 Integrated Inspection Report 05000269/2024001, 05000270/2024001 and 05000287/2024001 IR 05000269/20244022024-04-24024 April 2024 Security Baseline Inspection Report 05000269/2024402 and 05000270/2024402 and 05000287/2024402 IR 05000269/20244012024-03-28028 March 2024 – Security Baseline Inspection Report 05000269-2024401 and 05000270-2024401 and 05000287-2024401 IR 05000269/20230062024-02-28028 February 2024 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 - (NRC Inspection Report 05000269/2023006, 05000270/2023006, and 05000287/2023006) IR 05000269/20230042024-02-13013 February 2024 Integrated Inspection Report 05000269/2023004, 05000270/2023004, and 05000287/2023004; and Inspection Report 07200040/2023001 ML24017A0582024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion IR 05000269/20230052023-08-25025 August 2023 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005) IR 05000269/20230112023-08-25025 August 2023 Comprehensive Engineering Team Inspection Report 05000269/2023011 and 05000270/2023011 and 05000287/2023011 IR 05000269/20230022023-07-28028 July 2023 Integrated Inspection Report 05000269/2023002, 05000270/2023002 and 05000287/2023002 IR 05000269/20230102023-07-19019 July 2023 Biennial Problem Identification and Resolution Inspection Report 05000269/2023010 and 05000270/2023010 and 05000287/2023010 and Notice of Violation ML23124A0302023-05-18018 May 2023 Security Baseline Inspection Report 05000269/2023420 and 05000270/2023420 and 05000287/2023420 RA-23-0128, Refuel 32 (O1R32) Steam Generator Tube Inspection Report2023-05-18018 May 2023 Refuel 32 (O1R32) Steam Generator Tube Inspection Report IR 05000269/20234202023-05-18018 May 2023 Security Baseline Inspection Report 05000269/2023420 and 05000270/2023420 and 05000287/2023420 IR 05000269/20230012023-05-12012 May 2023 Integrated Inspection Report 05000269/2023001 and 05000270/2023001 and 05000287/2023001 IR 05000269/20234012023-04-14014 April 2023 – Security Baseline Inspection Report 05000269 2023401 and 05000270 2023401 and 05000287 2023401 IR 05000269/20220062023-03-0101 March 2023 Annual Assessment Letter for Oconee Nuclear Nuclear Station, Units 1, 2 and 3 (NRC Inspection Report 05000269/2022006, 05000270/2022006, and 05000287/2022006) ML23037A0772023-02-0606 February 2023 402 Cyber Notification and RFI Letter Final IR 05000269/20220042023-02-0202 February 2023 Integrated Inspection Report 05000269 2022004 and 05000270/2022004 and 05000287/2022004 IR 05000269/20220032022-11-0707 November 2022 Integrated Inspection Station 05000269/2022003 and 05000270/2022003 and 05000287/2022003 IR 05000269/20220112022-09-26026 September 2022 NRC Inspection Report 05000269/2022011 and 05000270/2022011 and 05000287/2022011 IR 05000269/20224012022-08-26026 August 2022 Material Control and Accounting Program Inspection Report 05000269/2022401 and 05000270/2022401 and 05000287/2022401 (OUO Removed) IR 05000269/20220052022-08-26026 August 2022 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 - NRC Inspection Report 05000269/2022005, 05000270/2022005, and 05000287/2022005 IR 05000270/20220022022-07-29029 July 2022 Integrated Inspection Report 05000269/ 2022002 and 05000270/2022002 and 05000287/2022002 IR 05000269/20220102022-06-30030 June 2022 Triennial Fire Protection Inspection Report 05000269/2022010 and 05000270/2022010 and 05000287/2022010 IR 05000269/20220012022-05-0404 May 2022 Integrated Inspection Report 05000269/2022001, 05000270/2022001 and 05000287/2022001 IR 05000269/20224032022-05-0404 May 2022 Security Baseline Target Set Inspection Report 05000269/2022403 and 05000270/2022403 and 05000287/2022403 IR 05000269/20224042022-04-27027 April 2022 Security Baseline Inspection Report 05000269/2022404 and 05000270/2022404 and 05000287/2022404 IR 05000269/20223012022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 IR 05000269/20210062022-03-0202 March 2022 Annual Assessment Letter for Oconee Nuclear Station, Units 1, 2, and 3 (Report 05000269/2021006, 05000270/2021006, and 05000287/2021006) IR 05000269/20220122022-02-24024 February 2022 Safety Conscious Work Environment Issue of Concern Followup Report 05000269/2022012 and 05000270/2022012 and 05000287/2022012 IR 05000269/20224022022-02-16016 February 2022 Security Baseline Inspection Report 05000269/2022402 and 05000270/2022402 and 05000287/2022402 IR 05000269/20210042022-02-14014 February 2022 Integrated Inspection Report 05000269/2021004 and 05000270/2021004 and 05000287/2021004 and Apparent Violation IR 05000269/20210032021-10-28028 October 2021 Integrated Inspection Report 05000269/2021003 and 05000270/2021003 and 05000287/2021003 IR 05000269/20210102021-09-17017 September 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000269/2021010 and 05000270/2021010 and 05000287/2021010 IR 05000269/20210052021-08-26026 August 2021 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2, and 3 (NRC Inspection Report 05000269/2021005, 05000270/2021005, and 05000287/2021005) IR 07200004/20210012021-08-26026 August 2021 Operation of an Independent Spent Fuel Storage Installation Report 07200004/2021001 IR 05000269/20210022021-08-0404 August 2021 Integrated Inspection Report 05000269/2021002 and 05000270/2021002 and 05000287/2021002 IR 05000269/20213012021-07-0606 July 2021 NRC Operator License Examination Report 05000269/2021301, 05000270/2021301, and 05000287/2021301 IR 05000269/20210112021-06-0202 June 2021 Biennial Problem Identification and Resolution Inspection Report 05000269/2021011 and 05000270/2021011 and 05000287/2021011 IR 05000269/20210012021-04-23023 April 2021 Integrated Inspection Report 05000269/2021001 and 05000270/2021001 and 05000287/2021001 IR 05000269/20214012021-04-22022 April 2021 Security Baseline Inspection Report 05000269/2021401, 05000270/2021401 and 05000287/2021401 (U) IR 05000269/20200062021-03-0303 March 2021 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2, & 3 NRC Inspection Report 05000269/2020006, 05000270/2020006, & 05000287/2020006 2024-09-23
[Table view] Category:Letter
MONTHYEAR05000270/LER-2024-001, Common Cause Inoperability of Both Trains of Control Room Ventilation System Outside Air Booster Fans Due to Supply Breaker Wiring Deficiency Resulted in a Condition That Have Prevented Fulfillment2024-12-19019 December 2024 Common Cause Inoperability of Both Trains of Control Room Ventilation System Outside Air Booster Fans Due to Supply Breaker Wiring Deficiency Resulted in a Condition That Have Prevented Fulfillment. 05000269/LER-2024-001, Standby Shutdown Facility (Ssf) Pressurizer Level Switch Configuration Caused by Legacy Procedure Deficiency Resulted in Condition Prohibited by Technical Specifications2024-12-19019 December 2024 Standby Shutdown Facility (Ssf) Pressurizer Level Switch Configuration Caused by Legacy Procedure Deficiency Resulted in Condition Prohibited by Technical Specifications 05000269/LER-2022-001-01, Ultrasonic Examination Indication Identifies Degraded Reactor Coolant System Pressure Boundary2024-11-0707 November 2024 Ultrasonic Examination Indication Identifies Degraded Reactor Coolant System Pressure Boundary ML24305A1492024-11-0404 November 2024 Review of the Fall 2023 Steam Generator Tube Inspection Report (O2R31) IR 05000269/20240032024-10-31031 October 2024 Integrated Inspection Report 05000269/2024003 and 05000270/2024003 and 05000287/2024003 (2) ML24255A3322024-10-16016 October 2024 SLRA - Revised SE Letter ML24297A6172024-10-11011 October 2024 PCA Letter to NRC Oconee Hurricane Helene ML24269A0912024-10-0909 October 2024 Request for Withholding Information from Public Disclosure IR 05000269/20243012024-09-23023 September 2024 NRC Operator License Examination Report 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML24145A1782024-08-26026 August 2024 Issuance of Amendment Nos. 430, 432, and 431, to TS 5.5.2, Containment Leakage Rate Testing Program for a one-time Extension of the Type a Leak Rate Test Frequency IR 05000269/20240052024-08-26026 August 2024 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 (Report 05000269/2024005, 05000270/2024005, and 05000287-2024005) ML24220A1092024-08-0808 August 2024 – Operator Licensing Examination Approval 05000269/2024301, 05000270/2024301, and 05000287/2024301 05000287/LER-2024-001, Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation2024-08-0202 August 2024 Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation IR 05000269/20240102024-08-0101 August 2024 Focused Engineering Inspection - Age-Related Degradation Report 05000269/2024010 and 05000270/2024010 and 05000287/2024010 IR 05000269/20240022024-07-25025 July 2024 Integrated Inspection Report 05000269/2024002 and 05000270/2024002 and 05000287/2024002 ML24192A1312024-07-15015 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 ML24183A2352024-06-29029 June 2024 Update 3 to Interim Report Regarding a Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 ML24179A1102024-06-27027 June 2024 Submittal of Updated Final Safety Analysis Report Revision 30, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc IR 05000269/20240012024-05-0303 May 2024 Integrated Inspection Report 05000269/2024001, 05000270/2024001 and 05000287/2024001 IR 05000269/20244022024-04-24024 April 2024 Security Baseline Inspection Report 05000269/2024402 and 05000270/2024402 and 05000287/2024402 ML24108A0792024-04-16016 April 2024 EN 57079 Paragon Energy Solutions Email Forwarding Part 21 Interim Report Re Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 IR 05000269/20244012024-03-28028 March 2024 – Security Baseline Inspection Report 05000269-2024401 and 05000270-2024401 and 05000287-2024401 ML24088A3052024-03-25025 March 2024 Fws to NRC, Agreement with Nlaa Determination for Tricolored Bat for Oconee Lr 05000287/LER-2023-002, Passive Containment Isolation Device Inoperability Results in Operation or Condition Prohibited by Technical Specifications2024-02-29029 February 2024 Passive Containment Isolation Device Inoperability Results in Operation or Condition Prohibited by Technical Specifications 05000270/LER-2023-001, Inappropriate Procedural Guidance for Planned Online Maintenance Results in Event or Condition That Could Have Prevented Fulfillment of a Safety Function Licensee2024-02-29029 February 2024 Inappropriate Procedural Guidance for Planned Online Maintenance Results in Event or Condition That Could Have Prevented Fulfillment of a Safety Function Licensee IR 05000269/20230062024-02-28028 February 2024 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 - (NRC Inspection Report 05000269/2023006, 05000270/2023006, and 05000287/2023006) ML24045A3072024-02-16016 February 2024 Ltr. to Pete Parr Chief Pee Dee Indian Tribe Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24030A0052024-02-16016 February 2024 Ltr. to Brian Harris, Chief, Catawba Indian Nation; Re., Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2992024-02-16016 February 2024 Ltr. to Eric Pratt Chief the Santee Indian Organization Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3082024-02-16016 February 2024 Ltr. to Ralph Oxendine Chief Sumter Tribe of Cheraw Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3032024-02-16016 February 2024 Ltr. to John Creel Chief Edisto Natchez-Kusso Tribe of Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2952024-02-16016 February 2024 Ltr. to Chuck Hoskin, Jr, Principal Chief Cherokee Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3062024-02-16016 February 2024 Ltr. to Michell Hicks, Principal Chief Eastern Band of Cherokee Re Oconee Nuclear Station Units 1,2, and 3 Section 106 ML24045A3012024-02-16016 February 2024 Ltr. to Harold Hatcher Chief the Waccamaw Indian People Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2972024-02-16016 February 2024 Ltr. to Dexter Sharp Chief Piedmont American Indian Assoc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3022024-02-16016 February 2024 Ltr. to Joe Bunch United Keetoowah Band of Cherokee Indians in Ok Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2962024-02-16016 February 2024 Ltr. to David Hill Principal Chief Muscogee Creek Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2942024-02-16016 February 2024 Ltr. to Carolyn Chavis Bolton Chief Pee Dee Indian Nation of Upper Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3042024-02-16016 February 2024 Ltr. to Lisa M. Collins Chief the Wassamasaw Tribe of Varnertown Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3052024-02-16016 February 2024 Ltr. to Louis Chavis Chief Beaver Creek Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24011A1482024-02-13013 February 2024 Letter to Steven M. Snider-Oconee Nuclear Sta, Unites 1,2 & 3 Notice of Avail of the Draft Site-Specific Supp. 2, 2nd Renewal to the Generic EIS for Lic. Renew of Nuclear Plants ML24030A5212024-02-13013 February 2024 Letter to Elizabeth Johnson, Director, SHPO; Re Oconee Nuclear Stations Units 1, 2, and 3 Section 106 ML24019A1442024-02-13013 February 2024 Letter to Reid Nelson, Executive Director, Achp; Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 IR 05000269/20230042024-02-13013 February 2024 Integrated Inspection Report 05000269/2023004, 05000270/2023004, and 05000287/2023004; and Inspection Report 07200040/2023001 ML24011A1532024-02-13013 February 2024 Letter to Tracy Watson EPA-Oconee Nuclear Sta, Unites 1, 2 & 3 Notice of Avail of the Draft Site-Specific Supp. 2, 2nd Renewal to the Generic EIS for Lic. Renew of Nuclear Plants ML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staff’S Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML24017A0582024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 2024-09-23
[Table view] |
Text
June 14, 2011
SUBJECT:
OCONEE NUCLEAR STATION - NRC EXAMINATION REPORT
05000269/2011301, 05000270/2011301 AND 05000287/2011301
Dear Mr. Gillespie,
Jr.:
During the period May 2, 2011, through May 5, 2011, the Nuclear Regulatory Commission (NRC) administered operating tests to employees of your company who had applied for licenses to operate the Oconee Nuclear Station. At the conclusion of the tests, the examiners discussed preliminary findings related to the operating tests and the written examination submittal with those members of your staff identified in the enclosed report. The written examination was administered by your staff on May 13, 2011.
Five Reactor Operator (RO) and three Senior Reactor Operator (SRO) applicants passed both the operating test and written examination. There were four post-examination comments. The NRC resolutions to these comments are summarized in Enclosure 2. A Simulator Fidelity Report is included in this report as Enclosure 3.
The initial written SRO examination submitted by your staff failed to meet the guidelines for quality contained in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1, as described in the enclosed report.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
DPC
If you have any questions concerning this letter, please contact me at (404) 997-4550.
Sincerely,
/RA/
Malcolm T. Widmann, Chief
Operations Branch 1
Division of Reactor Safety
Docket Nos.: 50-269, 50-270, 50-287 License Nos.: DPR-38, DPR-47, DPR-55
Enclosures 1. Summary of Findings & Report Details 2. Facility Comments and NRC Resolution 3. Simulator Fidelity Report
cc w/encl.: (See page 3)
DPC
cc w/encl:
Division of Radiological Health TN Dept. of Environment & Conservation Electronic Mail Distribution
David A. Baxter Vice President, Nuclear Engineering Duke Energy Carolinas, LLC Electronic Mail Distribution
Kent Alter Regulatory Compliance Manager Oconee Nuclear Station Duke Energy Carolinas, LLC Electronic Mail Distribution
Sandra Threatt, Manager Nuclear Response and Emergency Environmental Surveillance Bureau of Land and Waste Management Department of Health and Environmental Control Electronic Mail Distribution
Scott L. Batson Station Manager Oconee Nuclear Station Duke Energy Carolinas, LLC Electronic Mail Distribution
Senior Resident Inspector Oconee Nuclear Station U.S. Nuclear Regulatory Commission 7812B Rochester Hwy Seneca, SC 29672
Terry L. Patterson Safety Assurance Manager Duke Energy Carolinas, LLC Electronic Mail Distribution
Charles Brinkman Director Washington Operations Westinghouse Electric Company, LLC Electronic Mail Distribution
County Supervisor of Oconee County 415 S. Pine Street Walhalla, SC 29691-2145
W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution
Tom D. Ray Engineering Manager Oconee Nuclear Station Duke Energy Carolinas, LLC Electronic Mail Distribution
Dean M. Hubbard Training Manager Oconee Nuclear Station Electronic Mail Distribution
DPC
If you have any questions concerning this letter, please contact me at (404) 997-4550.
Sincerely,
/RA/
Malcolm T. Widmann, Chief
Operations Branch 1
Division of Reactor Safety
Docket Nos.: 50-269, 50-270, 50-287 License Nos.: DPR-38, DPR-47, DPR-55
Enclosures 1. Summary of Findings & Report Details 2. Facility Comments and NRC Resolution 3. Simulator Fidelity Report
cc w/encl.: (See page 3)
Distribution w/encl:
C. Evans, RII EICS (Part 72 Only)
L. Douglas, RII EICS (Linda Douglas)
OE Mail (email address if applicable)
RIDSNRRDIRS PUBLIC RidsNrrPMOconee Resource
X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS X Yes ACCESSION NUMBER: ML111651353
X SUNSI REVIEW COMPLETE OFFICE RII: DRS RII: DRS RII:DRP
SIGNATURE RA RA RA
NAME MBates MWidmann JBartley
DATE 06/13/2011 06/14/2011 06/13/2011
E-MAIL COPY?
x YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME:
G:\\OLEXAMS\\OCONEE EXAMINATIONS\\INITIAL EXAM 2011-301\\CORRESPONDENCE\\OCONEE EXAM REPORT 2011-301 REV 1.DOCX
Enclosure 1 U.S. NUCLEAR REGULATORY COMMISSION
REGION II
Docket Nos.:
05000269, 05000270, 05000287
License Nos.:
DPR-38, DPR-47, DPR-55
Report No.:
05000269/2011301, 05000270/2011301 and 05000287/2011301
Licensee:
Duke Energy Carolinas LLC.
Facility:
Oconee Nuclear Station, Units 1, 2, and 3
Location:
Seneca, SC
Dates:
Operating Tests - May 2, 2011, through May 5, 2011
Written Examination - May 13, 2011
Examiners:
M. Bates, Chief, Senior Operations Engineer
F. Ehrhardt, Senior Reactor Inspector
G. Laska, Senior Operations Examiner
Approved by:
Malcolm T. Widmann, Chief Operations Branch 1 Division of Reactor Safety
Enclosure 1 SUMMARY OF FINDINGS
ER 05000269/2011301; 05000270/2011301; 05000287/2011301; operating test 05/02/2011 -
05/05/2011 & written exam 05/13/2011; Oconee Nuclear Station, Units 1, 2, and 3 Operator License Examinations.
Nuclear Regulatory Commission (NRC) examiners conducted an initial examination in accordance with the guidelines in Revision 9, Supplement 1, of NUREG-1021, Operator Licensing Examination Standards for Power Reactors. This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45 as applicable.
Members of the Oconee Nuclear Station staff developed both the operating tests and the written examination. The initial written SRO examination submittal did not meet the quality guidelines contained in NUREG-1021.
The NRC administered the operating tests during the period of May 2, 2011, through May 5, 2011. Members of the Oconee Nuclear Station training staff administered the written examination on May 13, 2011. Five Reactor Operator (RO) and three Senior Reactor Operator (SRO) applicants passed both the written examination and operating test. Eight applicants were issued licenses commensurate with the level of examination administered.
There were four post-examination comments. The NRC resolutions to these comments are summarized in Enclosure 2.
No findings of significance were identified.
Enclosure 1 Report Details
4.
OTHER ACTIVITIES
4OA5 Operator Licensing Initial Examinations
a.
Inspection Scope
Members of the Oconee Nuclear Plant staff developed both the operating tests and the written examination. All examination material was developed in accordance with the guidelines contained in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC examination team reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021, and incorporated into the final version of the examination materials.
The examiners reviewed the licensees examination security measures while preparing and administering the examinations to ensure examination security and integrity complied with 10 CFR 55.49, Integrity of Examinations and Tests. One noncompliance of security requirements occurred on May 12, 2011, when the licensee emailed two written examination questions to the Chief Examiner without password protection as required by NUREG-1021. The security risk was evaluated by the NRC prior to the examination being administered and determined to be minimal. The licensee documented this event in PIP-O-11-6050.
The NRC examiners evaluated five Reactor Operator (RO), and three Senior Reactor Operator (SRO) applicants using the guidelines contained in NUREG-1021. The examiners administered the operating tests during the period of May 2, 2011, through May 5, 2011. Members of the Oconee Nuclear Station training staff administered the written examination on May 13, 2011. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate the Oconee Nuclear Station, met the requirements specified in 10 CFR Part 55, Operators Licenses.
b.
Findings
The NRC determined that the licensees initial RO written examination submittal and operating test submittal were within the range of acceptable quality expected for a proposed examination as specified by NUREG-1021. However, the NRC determined that the licensees SRO written examination submittal was outside the range of acceptable quality because more than 20% (7 of 25, or 28%) of the questions sampled for review contained unacceptable flaws. Individual questions were evaluated as unsatisfactory for the following reasons:
- Three questions contained two or more implausible distractors.
- Two questions were not written at the SRO license level.
- One question contained more than one correct answer.
- One question contained no correct answer.
Enclosure 1
The written examination was originally scheduled to be administered on May 11, 2011; however, administration was delayed by two days due to the licensee submitting concerns with 16 questions. Continued validation by the licensee, after their examination had already been submitted, revealed numerous question flaws of varying degrees of severity. All concerns were evaluated and addressed by the NRC prior to examination administration. The final evaluation of these concerns did not impact the status of the RO written examination being within the range of acceptable quality.
Five RO and three SRO applicants passed both the operating test and written examination. Eight licenses were issued.
Copies of all individual examination reports were sent to the facility Training Manager for evaluation of weaknesses and determination of appropriate remedial training.
There were four post-examination comments. The NRC resolution to these comments is summarized in Enclosure 2. A copy of the final written examination and answer key may be accessed not earlier than July 1, 2013, in the ADAMS system (ADAMS Accession Number ML111380080 and ML111380083). The licensees post-examination comments pertained only to the operating test and may be accessed in the ADAMS system (ADAMS Accession Number ML111380076).
4OA6 Meetings
Exit Meeting Summary
On May 6, 2011, the NRC examination team discussed generic issues associated with the operating test with Mr. S. Batson, Station Manager, and members of his staff. The examiners asked the licensee if any of the examination material was proprietary. No proprietary information was identified.
On June 1, 2011, The NRC Chief Examiner discussed issues associated with the development of the written examination with Mr. J. Steely, Operations Training Manager, and members of his staff.
PARTIAL LIST OF PERSONS CONTACTED
Licensee personnel
S. Batson, Station Manager E. Burchfield, Operations Superintendent F. Baldwin, Operations Shift Manager D. Hubbard, Training Manager R. Robinson, Operations Shift Manager P. Stovall, Training Manager Operations Fleet Training J. Steely, Operations Training Manager G. Washburn, Training Instructor C. Witherspoon, Training Instructor J. Smith, Licensing
NRC personnel
A. Sabisch, Senior Resident Inspector
Enclosure 2 NRC Disposition of Oconee 2011-301 Post-Examination Comments:
Four post-examination comments were submitted on the operating test and may be accessed in the ADAMS system (ADAMS Accession Number ML111380076).
COMMENT #1:
Correction for Scenario 2, Form ES-D-2:
Step 35 of EOP Enclosure 5.1 stated that when either (1) three LPSW pumps were operating, or (2) two LPSW pumps were operating when Technical Specifications (TS) only required two to be operating, Then 1LPSW-4 and 1LPSW-5 were required to be opened. Neither condition was met, therefore the applicants were not expected to ensure 1LPSW-4 and 1LPSW-5 were opened.
RECOMMENDATION:
The licensee stated that the applicants were not expected to ensure 1LPSW-4, and 1LPSW-5 were open due to not meeting the conditions of Step 35, which would have required these two valves to be in the open position.
NRC RESOLUTION:
NRC agreed with the licensees comment and incorporated the resolution into the applicant grading because neither of the above stated conditions were met.
COMMENT #2:
Correction for Scenario 3, Form ES-D-2.
RECOMMENDATION:
The licensee stated that actions of TS 3.4.1 were not required because the LCO did not apply in Mode 2.
NRC RESOLUTION:
NRC agreed with the licensees comment and incorporated the resolution into the applicant grading because the LCO did not apply to the plant Mode.
Enclosure 2 COMMENT #3:
The licensee submitted a comment at the Chief Examiners request to ensure accurate grading of In-Plant JPM (NLO-600), which required the applicant to transfer MCC 2XA between normal and emergency power. The circumstance in question occurred when an applicant incorrectly opened the normal feeder breaker and then reclosed it.
RECOMMENDATION:
The licensee stated that momentarily opening the normal feeder breaker would not have negatively impacted the plant or the applicants successful completion of the task.
NRC RESOLUTION:
NRC agreed with the licensees comment and incorporated the resolution into the applicant grading.
COMMENT #4:
The licensee submitted a comment at the Chief Examiners request to ensure accurate grading of JPM ADMIN-124, which required the applicants to make a determination on minimum shift staffing.
The licensee obtained confirmation from their Licensing Department on the correct application of Selected Licensee Commitment (SLC) 16.13.1 for minimum staffing of the facility given a set of plant conditions. The licensee stated that all requirements of SLC 16.13.1 could be met with three Senior Reactor Operators (SROs).
RECOMMENDATION:
The licensee stated that the original answer key in their final examination submittal was accurate.
NRC RESOLUTION:
Upon further review of SLC 16.13.1, and the licensees justification, the NRC agreed with the licensees comment and graded the applicants performance using the answer key contained in the licensees final submittal.
Enclosure 3 SIMULATOR FIDELITY REPORT
Facility Licensee: Oconee Nuclear Station
Facility Docket No.: 05000269/2011301, 05000270/2011301 AND 05000287/2011301
Operating Test Administered: May 2, 2011, through May 5, 2011
This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with Inspection Procedure 71111.11, are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.
While conducting the simulator portion of the operating test, examiners observed no simulator fidelity or configuration issues.