March 11, 2025
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION - UNITS 1 AND 2 - NRC INSPECTION REPORTS 05000280/2024006 AND 05000281/2024006
Dear Eric Carr:
The NRC has completed its end-of-cycle performance assessment of Surry Power Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2024, through December 31, 2024. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC concluded that overall performance at your facility preserved public health and safety.
The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.
The NRC determined the performance at Surry Power Station, Units 1 and 2 during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e.,
Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2026. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This letter and its enclosure will be made available for public inspection and copying at ADAMS Public Documents l NRC.gov and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Please contact me at 404-997-4506 with any questions you have regarding this letter.
Sincerely, James B. Baptist, Chief Projects Branch 4 Division of Operating Reactor Safety Docket Nos.: 05000280, 05000281 License Nos.: DPR-32, DPR-37 Enclosure:
Surry Inspection Plan cc: Distribution via ListServ Signed by Baptist, James on 03/10/25 SUBJECT: ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - NRC INSPECTION REPORTS 05000280/2024006 AND 05000281/2024006 DATED - MARCH 11, 2025 DISTRIBUTION:
R2 ACES RidsNRRDRO Resource ROPAssessment Resource RidsNrrPMSurry Resource ADAMS ACCESSION NUMBER: ML25065A265 X
SUNSI Review X
Non-Sensitive
Sensitive X
Publicly Available
Non-Publicly Available OFFICE RII/DORS RII/DORS NAME C. Even J. Baptist DATE 03/10/25 03/10/25
Site Inspection Activity Plan Surry 03/01/2025 - 12/31/2026 FOCUSED ENGINEERING INSPECTION (FPTI)
1,2 3/31/2025 4/4/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
1,2 4/14/2025 4/18/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
SECURITY BASELINE INSPECTION
1,2 4/7/2025 4/10/2025 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 4/7/2025 4/10/2025 IP 71130.07 000739 Security Training OPERATION OF AN ISFSI
RP PUBLIC RAD SAFETY BASELINE INSPECTION
1,2 7/14/2025 7/18/2025 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1,2 7/14/2025 7/18/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program 1,2 7/14/2025 7/18/2025 IP 71151 000746 Performance Indicator Verification EMERGENCY PREPAREDNESS EXERCISE INSPECTION
1,2 7/21/2025 7/25/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 7/21/2025 7/25/2025 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event 1,2 7/21/2025 7/25/2025 IP 71151 001397 Performance Indicator Verification SURRY INITIAL LICENSE EXAM
1,2 8/24/2025 8/30/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
1,2 10/5/2025 10/18/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
SECURITY BASELINE INSPECTION
1,2 9/15/2025 9/18/2025 IP 71130.02 000734 Access Control 1,2 9/15/2025 9/18/2025 IP 71130.05 000737 Protective Strategy Evaluation 1,2 9/15/2025 9/18/2025 IP 71130.09 001656 Security Plan Changes 1,2 9/15/2025 9/18/2025 IP 71151 001338 Performance Indicator Verification TARGET SET INSPECTION
1,2 10/20/2025 10/24/2025 IP 71130.14 000743 Review of Power Reactor Target Sets RP OCCUPATIONAL RAD SAFETY AND TRANSPORTATION BASELINE INSPECTION
1,2 11/3/2025 11/7/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 11/3/2025 11/7/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 1,2 11/3/2025 11/7/2025 IP 71151 000746 Performance Indicator Verification Enclosure 1,2 7/14/2025 7/18/2025 IP 60855 001001 Operation Of An ISFSI Unit Start End Activity CAC Title Staff Count UNIT 1 IN-SERVICE INSPECTION +SG
1 11/3/2025 11/14/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
Site Inspection Activity Plan RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION
1,2 4/27/2026 5/1/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 4/27/2026 5/1/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 4/27/2026 5/1/2026 IP 71124.04 000728 Occupational Dose Assessment 1,2 4/27/2026 5/1/2026 IP 71124.05 000729 Radiation Monitoring Instrumentation 1,2 4/27/2026 5/1/2026 IP 71151 000746 Performance Indicator Verification 1,2 5/18/2026 5/22/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 5/18/2026 5/22/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 5/18/2026 5/22/2026 IP 71124.04 000728 Occupational Dose Assessment 1,2 5/18/2026 5/22/2026 IP 71124.05 000729 Radiation Monitoring Instrumentation 1,2 5/18/2026 5/22/2026 IP 71151 000746 Performance Indicator Verification UNIT 2 IN-SERVICE INSPECTION +SG
FOCUSED ENGINEERING INSPECTION (CGD)
1,2 7/13/2026 7/17/2026 IP 71111.21N.03 001808 Commercial Grade Dedication 1,2 7/27/2026 7/31/2026 IP 71111.21N.03 001808 Commercial Grade Dedication PROBLEM IDENTIFICATION AND RESOLUTION
1,2 7/20/2026 7/24/2026 IP 71152B 000747 Problem Identification and Resolution 1,2 8/3/2026 8/7/2026 IP 71152B 000747 Problem Identification and Resolution ISFSI LICENSE RENEWAL
1,2 8/17/2026 8/21/2026 IP 60859 Independent Spent Fuel Storage Installation (ISFSI) License Renewal Inspection SECURITY BASELINE INSPECTION
1,2 9/21/2026 9/24/2026 IP 71130.02 000734 Access Control 1,2 9/21/2026 9/24/2026 IP 71130.09 001656 Security Plan Changes 1,2 9/21/2026 9/24/2026 IP 71151 001338 Performance Indicator Verification CYBER SECURITY INSPECTION
1,2 9/28/2026 10/2/2026 IP 71130.10 000741 Cybersecurity EMERGENCY PREPAREDNESS PROGRAM INSPECTION
1,2 11/16/2026 11/20/2026 IP 71114.02 000717 Alert and Notification System Testing 1,2 11/16/2026 11/20/2026 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2 11/16/2026 11/20/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 11/16/2026 11/20/2026 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 11/16/2026 11/20/2026 IP 71151 001397 Performance Indicator Verification
2 5/4/2026 5/15/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)