SUBJECT:

OCONEE NUCLEAR STATION - SECURITY BASELINE INSPECTION REPORT 05000269/2025402 AND 05000270/2025402 AND 05000287/2025402

Dear Steven Snider:

On February 26, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Oconee Nuclear Station and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jannette G. Worosilo, Chief Nuclear Security Branch Division of Fuels, Radiological Safety, and Security Docket Nos. 05000269 and 05000270 and 05000287 License Nos. DPR-38 and DPR-47 and DPR-55

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000269, 05000270 and 05000287

License Numbers:

DPR-38, DPR-47 and DPR-55

Report Numbers:

05000269/2025402, 05000270/2025402 and 05000287/2025402

Enterprise Identifier:

I-2025-402-0032

Licensee:

Duke Energy Carolinas, LLC

Facility:

Oconee Nuclear Station

Location:

Seneca, SC

Inspection Dates:

February 24, 2025, to February 26, 2025

Inspectors:

K. Kirchbaum, Senior Operations Engineer

Approved By:

Jannette G. Worosilo, Chief

Nuclear Security Branch

Division of Fuels, Radiological Safety, and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees

performance by conducting a security baseline inspection at Oconee Nuclear Station, in

accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs

program for overseeing the safe operation of commercial nuclear power reactors. Refer to

https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in

effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with

their attached revision histories are located on the public website at http://www.nrc.gov/reading-

rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared

complete when the IP requirements most appropriate to the inspection activity were met

consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for

Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and

records, observed activities, and interviewed personnel to assess licensee performance and

compliance with Commission rules and regulations, license conditions, site procedures, and

standards.

SAFEGUARDS

71130.14 - Review of Power Reactor Target Sets

The inspectors evaluated the Security Target Set Program. The following elements were

evaluated:

Review of Power Reactor Target Sets (1 Sample)

(1)

Section 03.01 Review of Events and Logs

The inspector reviewed any licensee event reports, safeguards log entries, and

corrective action program entries since the last Target Set inspection that concern the

target set identification, development, and maintenance program.

Section 03.02 Target Set Identification and Development Process Review

The inspector assessed the licensee's documentation and maintenance of the

process used to develop and identify complete and accurate target sets as required

by 10 CFR Part 73 by reviewing applicable portions of procedures and samples of

records and conducting interviews with responsible personnel and plant employees.

Section 03.03 Verification of Target Sets Changes

The inspector reviewed changes to the licensees documented target sets since the

last Target Set inspection. The inspector verified that any design modifications and

procedure or configuration changes that have occurred were appropriately

documented in the site's target sets.

Section 03.04 Verification of Complete and Accurate Target Sets

The inspector interviewed licensee personnel and reviewed a sample of target sets

for reactor operation and for modes other than operation. The inspector reviewed

assumptions used in the licensees development of its target sets.

Section 03.05 Physical Protection Program Review

The inspector verified that the licensee performed a review of target sets for

accuracy, completeness, and applicability at least every 24 months and as otherwise

required, documented the results and recommendations, and entered findings in the

sites corrective action program (CAP).

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On February 26, 2025, the inspectors presented the security baseline inspection results

to Steven Snider and other members of the licensee staff.