Security Baseline Inspection Report 05000269/2025401; 05000270/2025401 and 05000287/2025401
ML25085A384
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/27/2025
From: Jannette Worosilo
NRC/RGN-II/DFRSS/NSB
To: Rasmey Robinson
Duke Energy Carolinas
References
IR 2025401
Download: ML25085A384 (7)


Text

SUBJECT:

OCONEE NUCLEAR STATION, UNITS 1, 2, & 3 - SECURITY BASELINE INSPECTION REPORT 05000269/2025401 AND 05000270/2025401 AND 05000287/2025401

Dear Rodney (Keith) Robinson:

On March 20, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Oconee Nuclear Station, Units 1, 2, & 3 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jannette G. Worosilo, Chief Nuclear Security Branch Division of Fuels, Radiological Safety, and Security Docket Nos. 05000269 and 05000270 and 05000287 License Nos. DPR-38 and DPR-47 and DPR-55

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000269, 05000270 and 05000287

License Numbers:

DPR-38, DPR-47 and DPR-55

Report Numbers:

05000269/2025401, 05000270/2025401 and 05000287/2025401

Enterprise Identifier:

I-2025-401-0044

Licensee:

Duke Energy Carolinas, LLC

Facility:

Oconee Nuclear Station, Units 1, 2, & 3

Location:

Seneca, SC

Inspection Dates:

January 13, 2025 to January 16, 2025 (Corporate Office)

March 17, 2025 to March 20, 2025 (Onsite)

Inspectors:

M. Denman, Physical Security Inspector

J. Justice, Senior Physical Security Inspector

J. Stovall, Physical Security Inspector

R. Patterson, Senior Physical Security Inspector

Approved By:

Jannette G. Worosilo, Chief

Nuclear Security Branch

Division of Fuels, Radiological Safety, and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Oconee Nuclear Station, Units 1, 2, and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were evaluated:

Access Authorization

(1)

  • Tier I: All Requirements
  • Tier II: All Requirements
  • Tier III: All Requirements

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1)

  • Tier I: All Requirements
  • Tier II: 12 Requirements (02.06 a,d, 02.07 a, 02.08 a-i)
  • Tier III: All Requirements

71130.08 - Fitness-For-Duty Program

The inspectors evaluated the fitness for duty program by completing the following inspection

elements: Fitness-For-Duty Program

(1)

  • Tier I: All Requirements
  • Tier II: (02.05 a-l, 02,06 a-g, 02.07, 02.08, 02.09 a, b, c, d)
  • Tier III: (02.10, 02.11 a, 02.12 a, 02.14 a, b, c)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Security Plan Changes (1 Partial)

(1)

(Partial)

The opportunity to apply this procedure was not available in accordance with IMC 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p)(2) since the last performance of this IP.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) March 2024 - February

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On March 20, 2025, the inspectors presented the security baseline inspection results to Rodney (Keith) Robinson and other members of the licensee staff.
  • On January 16, 2025, the inspectors provided a debrief covering the results of the inspection at the Kings Mountain access authorization and fitness for duty facility to Teddy Reed and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

2540300

2540899

Various Self-Screener Audits

Miscellaneous

Various Access Authorization Personnel Records

AD-SY-ALL-0301

Nuclear Worker Unescorted Access Authorization Program

Revision 11

AD-SY-ALL-0310

Access Authorization Processing

Revision 11

AD-SY-ALL-0320

Personnel Access Data System (PADS)

Revision 5

AD-SY-ALL-0340

Access Authorization Training and Qualification Program

Revision 3

AD-SY-ALL-0350

Reviewing Officials Guidance for Access Authorization

Revision 4

Procedures

AD-SY-ALL-0370

Access Processing of Foreign Nationals

Revision 4

2411430-05

22

PADS Self-Assessment

05/19/2022

71130.01

Self-Assessments

2432397-05

Psychological Testing

07/05/2022

Oconee Nuclear Station Safeguard Event Logs (2nd, 3rd,

and 4th Quarters)

24

Miscellaneous

Material Search Notification Form (TID Shipment Notification)

2/02/2025

Duke Energy Physical Security Plan

Revision 30

Security Shift Supervisors Journal

Security Shift Supervisor Journal - Key Changeout

2/20/2025

AD-SY-ALL-0110

Protection of Information Related to Nuclear Security

Revision 11

AD-SY-ALL-0210

Site Access Controls

Revision 11

AD-SY-ALL-0215

Security Search and Entry Processing

Revision 15

AD-SY-ALL-0240

Security Key and Lock Controls

Revision 3

CSD-SY-ONS-

215-01

ONS Search and Entry Processing

Revision 13

71130.02

Procedures

CSD-SY-ONS-

240-01

ONS Security Lock and Key Program - Regulatory Key B

Inventory

03/13/25

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

24-ONS-SEC-

Oconee Physical Security Audit

Self-Assessments

24-ONS-SEC-

PR-01

Oconee Physical Security, Nuclear Oversight Performance

Review

Corrective Action

Documents

2532174,

2521189,

2439065,

2416953,

2410381,

2415751,

2515008

23 NRC FFD Program Performance Data Report

24 NRC FFD Program Performance Data Report

Miscellaneous

Generic Fitness For Duty and Behavioral Observation

Lesson Plan

Revision 4

AD-SY-ALL- 0401

Fitness For Duty Program

Revision 7

AD-SY-ALL- 0405

Fitness For Duty Violations

Revision 6

AD-SY-ALL- 0410

Fitness For Duty Drug and Alcohol Collections

Revision 7

AD-SY-ALL- 0415

Fitness For Duty Blind Performance Testing Procedure

Revision 5

AD-SY-ALL- 0420

Fitness For Duty Unscheduled Call Out

Revision 2

AD-SY-ALL- 0440

Fitness For Duty Training and Qualifications Program

Revision 3

AD-SY-ALL- 0451

Behavior Observation Program

Revision 6

AD-SY-ALL- 0460

Managing Fatigue and Work Hour Limits

Revision 8

AD-SY-ALL-0110

Protection of Information Related to Nuclear Security

Revision 10

71130.08

Procedures

PY-SY-ALL-0004

Duke Energy Nuclear Generation Fitness For Duty Policy

Revision 3

71151

Miscellaneous

Various Safeguards Event Logs