IR 05000254/2008402

From kanterella
Jump to navigation Jump to search
IR 05000254-08-402, (Drs), IR 05000265-08-402, (Drs), 01/22/2008 - 01/24/2008, Exelon Nuclear Corporate; 03/03/2008 - 03/07/2008, Quad Cities Nuclear Power Station, Routine Security Baseline Inspection - Cover Letter
ML081130439
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 04/17/2008
From: Eric Duncan
Plant Support Branch II
To: Pardee C
Exelon Generation Co
References
IR-08-402
Download: ML081130439 (5)


Text

ril 17, 2008

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000254/2008402(DRS);

05000265/2008402(DRS)

Dear Mr. Pardee:

On March 7, 2008, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Quad Cities Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.

The enclosed inspection report documents the inspection results, which were discussed on March 7, 2008, with Mr. T. Tulon and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agency wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Enclosure transmitted herewith contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA by R. Jickling acting for/

Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 Nonpublic Enclosure: Inspection Report 05000254/2008402(DRS);

05000265/2008402(DRS)

w/Attachment: Supplemental Information cc w/encl: Deani Riffle, NSIR/DSO/DDSO State Liaison Officer, State of Illinois State Liaison Officer, State of Iowa D. Thompson, Quad Cities Site Security Manager See Attached Distribution