MONTHYEARSVP-99-181, Forwards Biennial Update to Quad Cities Ufsar,Iaw 10CFR50.71(e).Update Includes Changes to Facility & Procedures & Are Current Through 9906301999-10-20020 October 1999 Forwards Biennial Update to Quad Cities Ufsar,Iaw 10CFR50.71(e).Update Includes Changes to Facility & Procedures & Are Current Through 990630 ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217K7011999-10-13013 October 1999 Provides Response to Questions Related to Request for License Amend,Per 10CFR50.90, Credit for Containment Overpressure. Supporting Calculations Encl 05000254/LER-1999-004, Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action1999-10-12012 October 1999 Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action ML20217F6321999-10-0707 October 1999 Forwards Insp Repts 50-254/99-01 & 50-265/99-01 on 990721- 0908.No Violations 05000254/LER-1999-003, Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee1999-10-0707 October 1999 Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee ML20212K9421999-10-0505 October 1999 Informs That NRC Accepts 990513 Inservice Inspection Relief Request CR-31 for Quad Cities Nuclear Power Station,Units 1 & 2 ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr SVP-99-189, Confirms Completion of Actions Identified During Review of NRC Safety Evaluation of Boiling Water Reactor Owners Group Rept, Utility Resolution Guidance of ECCS Suction Strainer Blockage1999-09-22022 September 1999 Confirms Completion of Actions Identified During Review of NRC Safety Evaluation of Boiling Water Reactor Owners Group Rept, Utility Resolution Guidance of ECCS Suction Strainer Blockage ML20212J0451999-09-21021 September 1999 Forwards Safety Evaluation of Licensee USI A-46 Program at Quad Cities Nuclear Power Station,Units 1 & 2,established in Response to GL 87-02 Through 10CFR50.54(f) Ltr ML20212D8231999-09-20020 September 1999 Informs That Effectieve 991101,NRC Region III Will Be Conducting Safety System Design & Performance Capability Pilot Insp at Quad Cities Nuclear Power Station.Insp Will Be Performed IAW NRC Pilot Insp Procedure 71111-21 ML20212C6961999-09-15015 September 1999 Forwards Insp Repts 50-254/99-17 & 50-265/99-17 on 990823- 0827.No Violations Noted SVP-99-190, Clarifies Statement Contained in NRC Insp Repts 50-254/99-12 & 50-265/99-12,dtd 990813,paragraph 4OA1.3B, Observation & Findings, Re Sys Mod to DG Air Start Sys1999-09-13013 September 1999 Clarifies Statement Contained in NRC Insp Repts 50-254/99-12 & 50-265/99-12,dtd 990813,paragraph 4OA1.3B, Observation & Findings, Re Sys Mod to DG Air Start Sys ML20211Q7961999-09-0909 September 1999 Forwards Correction to Administrative Error on Page 8 of NRC Insp Repts 50-254/99-16 & 50-265/99-16,transmitted by Ltr, ML20217H5661999-09-0909 September 1999 Discusses 990907 Pilot Plan Mgt Meeting Re Results to-date of Pilot Implementation of NRC Revised Reactor Oversight Process at Prairie Island & Quad Cities.Agenda & Handouts Provided by Utils Encl ML20211Q6511999-09-0808 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Quad Cities Operator License Applicants During Wk of 000327.Validation of Exam Will Occur at Station During Wk of 000306 ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211F8251999-08-25025 August 1999 Forwards Insp Repts 50-254/99-15 & 50-265/99-15 on 990816-20.No Violations Noted.Insp Evaluated Effectiveness of Maint Rule Program & Review Periodic Evaluation Specifically Required for 10CFR50.65 ML20211B8691999-08-20020 August 1999 Forwards Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Action Plans Developed to Address Configuration Control Weaknesses Not Totally Effective as Listed ML20211D1491999-08-19019 August 1999 Forwards Insp Repts 50-254/99-16 & 50-265/99-16 on 990719-22.Staff Identified Major Discrepancy Re Accuracy of Data Submitted to NRC for Protected Area Security Equipment Performance ML20211C7601999-08-19019 August 1999 Confirms NRC Intent to Meet with NSP & Ceco on 990807 in Lisle,Il to Discuss with Region III Pilot Plants,Any Observations,Feedback,Lessons Learned & Recommendations Relative to Implementation of Pilot Program ML20210R7451999-08-13013 August 1999 Forwards Insp Repts 50-254/99-11 & 50-265/99-11 on 990601-0720.NRC Identified Several Issues Which Were Categorized as Being of Low Risk Significance.Two Issues Involved NCVs of Regulatory Requirements SVP-99-147, Notifies of Change to Bases of TS to Licenses DPR-29 & DPR- DPR-30.Change to TS Section 3/4.9 Provides Clarity & Consistency with Sys Design Description in Ufsar,Sections 8.3.2.1 & 8.3.2.2.TS Bases Page,Encl1999-08-13013 August 1999 Notifies of Change to Bases of TS to Licenses DPR-29 & DPR- DPR-30.Change to TS Section 3/4.9 Provides Clarity & Consistency with Sys Design Description in Ufsar,Sections 8.3.2.1 & 8.3.2.2.TS Bases Page,Encl SVP-99-170, Forwards Relief Requests CR-25,CR-26,CR-27,CR-28,PR-11, PR-12 & PR-13,on Basis That Compliance with Specified Requirements Would Result in Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality & Safety1999-08-13013 August 1999 Forwards Relief Requests CR-25,CR-26,CR-27,CR-28,PR-11, PR-12 & PR-13,on Basis That Compliance with Specified Requirements Would Result in Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality & Safety ML20210T9941999-08-13013 August 1999 Forwards Insp Repts 50-254/99-12 & 50-265/99-12 on 990628-0716.Violations Noted SVP-99-154, Notifies NRC That M Price,License SOP-31389,is No Longer Required to Maintain Operator License.Price Was Removed from Licensed Duty on 990729 & Comm Ed Requests License Be Terminated1999-08-13013 August 1999 Notifies NRC That M Price,License SOP-31389,is No Longer Required to Maintain Operator License.Price Was Removed from Licensed Duty on 990729 & Comm Ed Requests License Be Terminated ML20210R9541999-08-10010 August 1999 Informs That During 990804 Telcon Between J Bartlet & M Bielby,Arrangements Were Made for NRC to Insp License Operator Requalification Program at Plant.Insp Planned for Wks of 991018 & 25 ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M5461999-08-0606 August 1999 Discusses 990804 Telcon Between J Bartlet & M Bielby,Where Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant.Insp Planned for Wks of 991018 & 25 ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210L8371999-08-0202 August 1999 Forwards SE Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety Related Motor-Operated Valves ML20210M4691999-07-30030 July 1999 Forwards Insp Repts 50-254/99-14 & 50-265/99-14 on 990713-15.One NCV Was Identified & Discussed in Encl Insp ML20210H4661999-07-29029 July 1999 Forwards Insp Repts 50-254/99-13 & 50-265/99-13 on 990628-0702.No Violations Noted.Insp Consisted of Selective Examination of Procedures & Representative Records, Observations of Activities & Interviews with Personnel 05000254/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73(a)(2)(iv).Rev Includes Cause Codes & Energy Industry Identification Sys Identifiers Which Were Erroneously Omitted in Original Ler.Commitments Listed1999-07-29029 July 1999 Forwards LER 99-002-01,IAW 10CFR50.73(a)(2)(iv).Rev Includes Cause Codes & Energy Industry Identification Sys Identifiers Which Were Erroneously Omitted in Original Ler.Commitments Listed SVP-99-151, Responds to NRC 990701 Telcon RAI Re Licensee Amend Request Re Use of Containment Overpressure to Support NPSH Available for ECCS at Quad Cities Nuclear Power Station,Units 1 & 21999-07-23023 July 1999 Responds to NRC 990701 Telcon RAI Re Licensee Amend Request Re Use of Containment Overpressure to Support NPSH Available for ECCS at Quad Cities Nuclear Power Station,Units 1 & 2 SVP-99-150, Forwards Responses to 990520 RAI Re Annual 10CFR50.46 Rept1999-07-23023 July 1999 Forwards Responses to 990520 RAI Re Annual 10CFR50.46 Rept SVP-99-146, Informs of Termination of License SOP-31132-1,for G Green, as Required by 10CFR50.74(b).Individual Was Removed from License Duty on 9906251999-07-21021 July 1999 Informs of Termination of License SOP-31132-1,for G Green, as Required by 10CFR50.74(b).Individual Was Removed from License Duty on 990625 ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes SVP-99-139, Forwards Revised Action 2 & Associated TS Bases Changes, Describing Specific Alternate Method for Determining Drywell Floor Drain Sump Leakage1999-06-30030 June 1999 Forwards Revised Action 2 & Associated TS Bases Changes, Describing Specific Alternate Method for Determining Drywell Floor Drain Sump Leakage ML20209B2081999-06-29029 June 1999 Discusses Closure of Response to RAI Re GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity. Rvid,Version 2 Issued as Result of Review of Responses.Info Should Be Reviewed & Comments Submitted by 990901 05000265/LER-1999-002, Forwards LER 99-002-00 for Quad Cities Nuclear Power Station IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Commits to One Listed Action1999-06-25025 June 1999 Forwards LER 99-002-00 for Quad Cities Nuclear Power Station IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Commits to One Listed Action SVP-99-122, Forwards Regulatory Commitment Change Summary Rept, Containing Summary Info from 980601 Through 9906011999-06-25025 June 1999 Forwards Regulatory Commitment Change Summary Rept, Containing Summary Info from 980601 Through 990601 SVP-99-066, Informs That J Reed,License SOP-31034-1,was Removed from License Duty in 990618.Termination of License Is Requested1999-06-25025 June 1999 Informs That J Reed,License SOP-31034-1,was Removed from License Duty in 990618.Termination of License Is Requested SVP-99-103, Informs NRC of Results of Subject Evaluation as Committed to in .Evaluation Consisted of Analytically Demonstrating That Cfu Factor for Rv Head Closure Studs Will Remain Below 1.0 for Remainder of Current License Period1999-06-25025 June 1999 Informs NRC of Results of Subject Evaluation as Committed to in .Evaluation Consisted of Analytically Demonstrating That Cfu Factor for Rv Head Closure Studs Will Remain Below 1.0 for Remainder of Current License Period ML20196F7921999-06-24024 June 1999 Forwards Meeting Summary,Nrc Meeting Handout & Licensee Handout from 990608 Meeting ML20196E7131999-06-23023 June 1999 Forwards Insp Repts 50-254/99-09 & 50-265/99-09 on 990421-0531.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20196E4821999-06-21021 June 1999 Discusses 990617 Meeting by Region III Senior Reactor Analysts (SRA) in Cordova,Il to Meet with PRA Staff to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA Staff 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217F6321999-10-0707 October 1999 Forwards Insp Repts 50-254/99-01 & 50-265/99-01 on 990721- 0908.No Violations ML20212K9421999-10-0505 October 1999 Informs That NRC Accepts 990513 Inservice Inspection Relief Request CR-31 for Quad Cities Nuclear Power Station,Units 1 & 2 ML20212J0451999-09-21021 September 1999 Forwards Safety Evaluation of Licensee USI A-46 Program at Quad Cities Nuclear Power Station,Units 1 & 2,established in Response to GL 87-02 Through 10CFR50.54(f) Ltr ML20212D8231999-09-20020 September 1999 Informs That Effectieve 991101,NRC Region III Will Be Conducting Safety System Design & Performance Capability Pilot Insp at Quad Cities Nuclear Power Station.Insp Will Be Performed IAW NRC Pilot Insp Procedure 71111-21 ML20212C6961999-09-15015 September 1999 Forwards Insp Repts 50-254/99-17 & 50-265/99-17 on 990823- 0827.No Violations Noted ML20217H5661999-09-0909 September 1999 Discusses 990907 Pilot Plan Mgt Meeting Re Results to-date of Pilot Implementation of NRC Revised Reactor Oversight Process at Prairie Island & Quad Cities.Agenda & Handouts Provided by Utils Encl ML20211Q7961999-09-0909 September 1999 Forwards Correction to Administrative Error on Page 8 of NRC Insp Repts 50-254/99-16 & 50-265/99-16,transmitted by Ltr, ML20211Q6511999-09-0808 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Quad Cities Operator License Applicants During Wk of 000327.Validation of Exam Will Occur at Station During Wk of 000306 ML20211F8251999-08-25025 August 1999 Forwards Insp Repts 50-254/99-15 & 50-265/99-15 on 990816-20.No Violations Noted.Insp Evaluated Effectiveness of Maint Rule Program & Review Periodic Evaluation Specifically Required for 10CFR50.65 ML20211B8691999-08-20020 August 1999 Forwards Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Action Plans Developed to Address Configuration Control Weaknesses Not Totally Effective as Listed ML20211C7601999-08-19019 August 1999 Confirms NRC Intent to Meet with NSP & Ceco on 990807 in Lisle,Il to Discuss with Region III Pilot Plants,Any Observations,Feedback,Lessons Learned & Recommendations Relative to Implementation of Pilot Program ML20211D1491999-08-19019 August 1999 Forwards Insp Repts 50-254/99-16 & 50-265/99-16 on 990719-22.Staff Identified Major Discrepancy Re Accuracy of Data Submitted to NRC for Protected Area Security Equipment Performance ML20210R7451999-08-13013 August 1999 Forwards Insp Repts 50-254/99-11 & 50-265/99-11 on 990601-0720.NRC Identified Several Issues Which Were Categorized as Being of Low Risk Significance.Two Issues Involved NCVs of Regulatory Requirements ML20210T9941999-08-13013 August 1999 Forwards Insp Repts 50-254/99-12 & 50-265/99-12 on 990628-0716.Violations Noted ML20210R9541999-08-10010 August 1999 Informs That During 990804 Telcon Between J Bartlet & M Bielby,Arrangements Were Made for NRC to Insp License Operator Requalification Program at Plant.Insp Planned for Wks of 991018 & 25 ML20210M5461999-08-0606 August 1999 Discusses 990804 Telcon Between J Bartlet & M Bielby,Where Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant.Insp Planned for Wks of 991018 & 25 ML20210L8371999-08-0202 August 1999 Forwards SE Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety Related Motor-Operated Valves ML20210M4691999-07-30030 July 1999 Forwards Insp Repts 50-254/99-14 & 50-265/99-14 on 990713-15.One NCV Was Identified & Discussed in Encl Insp ML20210H4661999-07-29029 July 1999 Forwards Insp Repts 50-254/99-13 & 50-265/99-13 on 990628-0702.No Violations Noted.Insp Consisted of Selective Examination of Procedures & Representative Records, Observations of Activities & Interviews with Personnel ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20209B2081999-06-29029 June 1999 Discusses Closure of Response to RAI Re GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity. Rvid,Version 2 Issued as Result of Review of Responses.Info Should Be Reviewed & Comments Submitted by 990901 ML20196F7921999-06-24024 June 1999 Forwards Meeting Summary,Nrc Meeting Handout & Licensee Handout from 990608 Meeting ML20196E7131999-06-23023 June 1999 Forwards Insp Repts 50-254/99-09 & 50-265/99-09 on 990421-0531.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20196E4821999-06-21021 June 1999 Discusses 990617 Meeting by Region III Senior Reactor Analysts (SRA) in Cordova,Il to Meet with PRA Staff to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA Staff ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20195K1411999-06-16016 June 1999 Forwards Safety Evaluation Authorizing Relief Request RV-23A for Duration of Current 10 Yr IST Interval on Basis That Compliance with Code Requirements Would Result in Hardship Without Compensating Increase in Level of Quality & Safety ML20195J6401999-06-14014 June 1999 Discusses Licensee 990331 Remediation Plan for Welds Susceptible to Intergranular Stress Corrosion Cracking at Quad Cities Nuclear Power Station,Unit 1 & Requests Licensee Address Concerns Discussed & Propose Plan to Implement C/A ML20207H6171999-06-14014 June 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-254/99-01 & 50-265/99-01,per 990217 & 0401 Ltrs Which Transmitted NOV Associated with Insp Repts 50-254/98-23 & 50-265/98-23 ML20206Q3111999-05-18018 May 1999 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety ML20206S3981999-05-14014 May 1999 Forwards Insp Repts 50-254/99-06 & 50-265/99-06 on 990307-0420.Three Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20206S1131999-05-13013 May 1999 Informs That on 990505 NRC Staff Held Planning Meeting for Plant to Identify Insp Activities at Facility Over Next 6 to 12 Months ML20206S1561999-05-12012 May 1999 Informs of Plans to Conduct Public Meeting on 990608 in Rock Island,Il to Present Planned Changes to NRC Regulatory Processes & Pilot Plant Program for Quad Cities Station ML20206N9621999-05-11011 May 1999 Forwards Insp Repts 50-254/99-08 & 50-265/99-08 on 990419-23.No Violations Noted.Insp Examined Efforts in Addressing Actions Requested in NRC GL 96-01, Testing of Safety Related Logic Circuits ML20206P8511999-05-11011 May 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-254/98-21 & 50-265/98-21.Corrective Actions Will Be Examined During Future Insp ML20206P6811999-05-11011 May 1999 Confirms Discussion Between Members of Staff to Have Mgt Meeting at Qcs on 990608 in Training Bldg,Meeting Open to Public.Purpose of Meeting to Discuss Qcs Performance Described in PPR ML20206F3221999-05-0404 May 1999 Second Final Response to FOIA Request for Documents.Forwards Documents Listed in App B Maintained in PDR Under Request Number 99-134.Documents in App C Being Released in Part (Ref FOIA Exemptions 6) ML20206Q5701999-05-0303 May 1999 Informs That on 990420-21 NRC Senior Managers Met to Evaluate Nuclear Safety Performance of Operation Reactors, Fuel Cycle Facilities & Other Matl Licenses ML20206E0621999-04-30030 April 1999 Refers to Ceco Which Committed to Perform Future FW Nozzle Insps in Accordance with BWROG Alternate BWR FW Nozzle Insp Requirements Rept.Informs of Misunderstanding Re Condition 6 Implications in SER Which Approved Rept ML20205T4281999-04-22022 April 1999 Informs That Encl FEMA Correspondence Was Received on 990322,transmitting FEMA Evaluation Rept for 981007 Annual Medical Drill Conducted at Rock Island County for Quad City Nuclear Power Station.No Violations Were Noted ML20205Q5191999-04-16016 April 1999 Forwards SER Concluding That Quad Cities Nuclear Power Station,Unit 1 Can Be Safely Operated for Next Fuel Cycle with Weld O2BS-F4 in Current Condition Because Structural Integrity of Weld Will Be Maintained ML20205P4641999-04-15015 April 1999 Forwards for Review & Comment Draft Info Notice That Describes Unanticipated Reactor Water Draindown at Quad Cities Nuclear Power Station Unit 2,Arkansas Nuclear One Unit 2 & Ja Fitzpatrick NPP ML20205P0591999-04-14014 April 1999 Ninth Partial Response to FOIA Request for Documents.App Records Already Available in Pdr.Records in App T Encl & Being Made Available in Pdr.App U Records Being Released in Part (Ref FOIA Exemption 7).App V Records Withheld Entirely ML20205N9541999-04-0909 April 1999 Forwards Insp Repts 50-254/99-03 & 50-265/99-03 on 990308-12.No Violations Noted.Longstanding Materiel Condition Issues Continue to Be Problem,However Progress Had Been Made in Listed Areas ML20205J5691999-04-0707 April 1999 First Partial Response to FOIA Request for Documents. Documents Listed in App a Being Released in Their Entirety ML20205F8031999-04-0202 April 1999 Forwards Draft Info Notice Describing Unanticipated Reactor Water Draindown of Listed Plants ML20205J2891999-04-0101 April 1999 Forwards Insp Repts 50-254/99-01 & 50-265/99-01 on 990121-0306.Violations Identified Involving Failure to Follow Station Procedures for Use of Shutdown Cooling & Failure to Follow Station out-of-svc Tagging Procedures ML20196K9001999-03-31031 March 1999 Forwards Radiation Protection Insp Repts 50-254/99-07 & 50-265/99-07 on 990309-12.No Violations Were Identified.Insp Consisted of Review of Solid Radwaste Processing & Control Program & Radioactive Matls Shipping Program ML20205G5811999-03-26026 March 1999 Advises of Completion of Plant Performance Review on 990201 to Develop Integrated Understanding of Safety Performance. Overall Performance of Plant Acceptable.Plant Issues Matrix & Insp Plan Encl ML20204E0611999-03-18018 March 1999 Discusses Review of Rev 8Q to Portions of Plant Emergency Plan Site Annex ML20207L7511999-03-15015 March 1999 Informs That Staff Offers No Objections to Util 990121 Change to Licenses DPR-29 & DPR-30,App a TSs Bases Sections 3/4.10.K & 3/4.10.L.Changes Clearly Identifies That RHR Scs Not Designed to Be Throttled Sufficiently to Maintain Rc 1999-09-09
[Table view] |
Text
,. - _.,-__...-.m. _ _. _ . . - . _ . , . . . _ _ . _ . . _ . _.____,___
.. c L Noveter 15, 1996
!
l- ,
Mr. ~ !
Site Vice President !
- Quad Cities Station l
Commonweaith Edison Company.
_
l 22710 206th Avenue North r
Cordova, IL 61242- ;
SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REPORT NO. l 50-254/96010(D RS): 50-265 /96010(D RS)
Dear Mr. Kraft:
l ,
This will acknowledge receipt of your letter dated October 6,1996,in response to
our letter dated September 9,1996, transmitting a Notice of Violation associated with:
_'
t l- . (1) the failure of the Engineering Department to adequately review the suitability of a part
'
l essential to the function of an Emergency Core Cooling System; and (2) the failure of the I
, 1 l-f: Engineering Department to follow procedures for the Temporary Alterationed Root Cause
' investigation Process programs at the Quad Cities Nuclear Power Station. We have . .
! .
~
.
.
. ' reviewed your corrective actions and have no further questions at this time. These corrective actions will be examined during future inspections.
I
Sincerely, j
Original signed by Geoffrey E. Grant' i I
Geoffrey E. Grant, Director '
Division of Reactor Safety I
- . Docket Nos. 50-254 ;
p 1
'
- See Attached Distribution DOCUMENT NAME: G:\DRS\OUA111_6.DRS To receive a copy of this document, Indicate in the box *C" = Copy without attachment / enclosure "E* = Copy with attachment / enclosure
- N* = No copy c OFFICE Rlli gn Rlli . , , G Rlli p' Rll! __ l
- NAME EDuncan:nh/j3F- M Rinif f Q M PHiland gg HClaytdt/tH49t
[ DATE 11/6/96 4A 11/;f/96 11/996 f 11/lf/9p . j/ )
V "
-
OFFICIAL RECOflD COPY
.
9611260137 961115
- PDR ADOCK 05000254 b M6u(L IE-O l
!
.- - - . . . . - - . . . . . ..
.. . _ . , .. . . . . - . _ .. _- . .- ---._. -. - .. . .
. . l.
l cc: D. A. Sager, Vice President, Generatica Support H. W. Keiser, Chief Nuclear +
Operating Officer l L. W. Pearce, Station Manager l N. Chrissotimos, Regulatory
'
Assurance Supervisor l C. C. Peterson, Regulatory Affairs Manager
!
l. Johnson, Acting Nuclear Regulatory Services Manager Document Control Desk - Licensing cc w/Itr dtd 10/06/96: Richard Hubbard
- Nathan Schloss, Economist, l Office of the Attorney General i State Liaison Officer l Chairman, Illinois Commerce Commission J. R. Bull, Vice President, General &
Transmission, MidAmerican Energy Company I
Distribution w/Itr dtd 10/06/96:
Docket File RlliPRR A. B. Beach, Rlli
PUBLIC IE-01 SRis, Quad Cities, Enf. Coordinator, Rlli l OC/LFDCB Dresden, LaSalle RAC1 (E-mail)
! DRP W. Axelson, Rlli CAA1 (E-mail)
l DRS LPM, NRR i
I i
l
!
I t-1
!
, _ _ . . _ _ _ _ . .
,
. .-
Commonwealth Edison Company
.
Quad Cities Generating Station 22710 206th Axnue North Cordova, IL 612419740 Tri 3094%2241 l ESK 96-190 October 6,1996 U.S Nuclear Regulatory Commission Washington, D.C. 20555 )
Attention: Document Control Desk Subject: Quad Cities Nuclear Power Station Units 1 and 2; NRC Docket Numbers 50-254 and 50-265:
NRC Inspection Report Numbers 50-254/96010 and 50-265/96010. I Reference: G. E. Grant I.etter to E. S. Kraft, Jr., Dated September 6,1996, l Tansmitting Notices of Violation. l l
Enclosed is Commonwealth Edison's (Comed's) responses to the Notice of
, Violations (NOV) tansmitted with the referenced letter. The report cited two
'
Severity Level IV violations: 1) concerning the failure of the Engineering Department to adequately review the suitability of a part essential to the function of ,
an Emergency Core Cooling System, and 2) failure of the Engineering Department l to follow procedures for the Temporary Alteration and Root Cause Investigation Process pmgrams.
'Ihis letter contains the following commitments:
1) QCAP 2300-24 will be revised to add minimum qualification requirements for investigators and a maintained list will be issued detailing individuals who meet those requirements by November 15, 1996. This is tracked under NTS 254-100-96-01002.01.
.
. ,..i. .If;there are any questions or. comments concerning this letter, please refer than to y. .
Mr. Charles Peterson, Regulatory Affairs Manager, at (309) 654-2241, ext. 3602.
Re tf 11 E. M. Kraft, Jr.
k 60 86 Site Vice President Quad Cities Station Attachment (A), Response to Notice of Violation cc: A. Beach, NRC Regional Administrator, RIII R. Pulsifer, NRC Project Manager, NRR C. Miller, Senior Resident Inspector, Quad Cities R. Singer, MidAmerican Energy Company D. Tubbs, MidAmerican Energy Company A l *nicom Comp.im
_
-. . .--- .. -
,
. .-
l
ATTACHMENT A (Page 1 of 8)
STATEMENT OF VIOLATION (254/265-96-010-01):
NOTICE OF VIOLATION During an NRC inspection conducted on July 8 through July 26,1996, violations of NRC requirements were identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions the violations am listed below:
A. 10 CFR 50, Appendix B, Criterion III requires, in part, that measures be established for the selection and review for suitability of application of parts that are essential to the safety-related function of structures, systems, and components.
Contrary to the above, on July 10,1996, the inspectors identified that the safety evaluation review for exempt change EO4-2-94-226 to replace a Unit 2 emergency core cooling system (ECCS) toms suction butterfly valve for the reactor core isolation cooling system was based on an incorrect valve weight. As a result, the licensee failed to adequately review for suitability a part essential to the function of an ECCS system.
This is a Severity level IV problem (Supplement I) (50-265/96010-01).
REASON FOR VIOLATION:
Quad Cities Station acknowledges the violation for inadequate review of suitability of parts.
Quad Cities Station understands the concern on the exempt change E04-2-94-226 in respect to the discrepancy between the target and actual valve weight for the 6" valve. The valves were ordered to a specified weight in order to eliminate the possibility of reanalysis of the associated Mark I piping. The target weights were pulled from the existing approved piping
'
calculations and entered into the bids to the valve manufacturers. Therefore, these valves
' ' * '
.' -
' were not wscessatilp sto'ck order valve'fand depdriding on the required weight were custoni' - -
made for the specific application. The chronological documentation for the ordering and receipt of the 2-1301-56-6" Crane Butterfly valve is as follows:
February 9,1995 CHRON #0306410 His letter was addressed to Vectra, Technologies letter transmitting the 2-1301-56-6" Crane Butterfly valve weight, as well as the three (3) other butterfly valves, for design information.
De estimated target weight in this letter for the 6" valve was 95 lbs (+/- 10 %).
February 22,1995 CHRON #0306451 nis letter was addressed to Vectra, Technologies transmitting revised information on the 2-1301-56, 6" valve. Crane had neglected to include the operator weight in the previous weight estimate. Therefore, the new estimate of the valve and operator combined weight was 140 lbs (+/- 10 %).
.
"
_. _ __ _ _ _ _ _ . . . . _ _ _ _ __ . _ . . . _ _ ._ _ . . _ _ _ _ _ _
. .-
ATTACHMENT A (Page 2 of 8)
l February 25,1995 10CFR50.59
'Ihe 10CFR50.59 Safety Evaluation was prepared and the approval was given on March 1, 1996. At this time this was written and reviewed, the 2-1301-56-6" valve weight was e#imatM to be 140 lbs (+/- 10 %).
February 27,1995 CHRON #0306465 The Exempt Change Approval letter for E04-2-94-226. The letter states "... the calculations which were performed during the design process will be reviewed by the Site Engineering ,
Cognizant Engineer and discussed in an addendum letter. ....." l l
Marth 9,1995 CHRON #0307259 l Exempt Change Addendum letter 1. Due to the difference between 95 lbs. and 140 lbs. the l piping analysis was revised. The calculation portion of this letter states: "....The i calculations which were performed by Vectra during the design process are listed in Part 2 of l ECN 04-1260M-01. They have been reviewed for assumptions, judgments and conclusions
! by Site Engineering and have been found acceptable." This review methodology is consistent with NEP-04-00 "Roadmap Design Changes". 'Ihese calculations No.
28.0202.0332.21 and 28.0202.0333.22 contained the 140 lbs (+/- 10 %) 6" valve weight.
April 20,1995 CHRON #0307939 The letter addressees the valve weights listed on the Crane assembly drawings versus the weights in the Crane purchase order. 'Ihe 2-1301-56-6" valve was 160 lbs versus the initial l estimate of 140 lbs (+/- 10 %) discussed above. The letter also accepted the weight on the
'
drawing. All of the other valve weights were within their acceptable weight windows. This letter was copied to Vectra, Technologies for fmal design information.
April 27,1995 CHRON #0308379 Addendum letter 2 to address the Crane Seismic calculations. The calculations were l reviewed for assumptions, judgments and conclusions and found acceptable with the combined valve and operator weight of 160 lbs. The 10CFR50.59 was also reviewed and '
'* '
-
detehniried that it was' not'a'ffected. The Purchase order was referente' d dhich is the -
,
referenced document accepted in CHRON #0307939 with the total valve weight of 160 lbs.
l July 16,1996 PIF 96-2334
'Ihis PIF was generated to document the discrepancies between the fmal design information on the valve weight and the Vectra piping calculations No. 28.0202.0332.21 and 28.0202.0333.22. It was also to determine why the information was not formally documented within the calculations.
I
1
,
._
- - , - - --, - - - - - . --- - _ . - - . - - - - --
. .
l.
,
ATTACHMENT A (Page 3 018)
l l
SUMMARY OF THE CHRONOIDGY:
During the course of the project, constant contact was maintained between Vectra and the Quad Cities Site Engineering Engineer. In April of 1995, the final weight of the valves were discussed between the site and the A/E and it was determined that the weight difference was insignificant in the piping model. His was due to the fact that the overall valve assembly weight, which includes the valve, operator and flanges, were still within the 10% weight l
'
window. This is because the total valve weight as input into the piping analysis contains the valve, operator and flange weights. De piping flanges were not weighed as part of the 160 lbs valve assembly. This information was not input into the piping calculation since the
.
design margin window of the total valve assembly (+/-10%) was achieved. De Piping
! Configuration Verification Instruction CEC-99-017 states this tolerance is acceptable. His
! information and discussion was utilized to acknowledge the acceptance of the valves in
!'
CHRON letter #0307939. This determination was also utilized to review the existing
'
10CFR50.59 and documented that it was still applicable in CHRON letter #0308379.
CORRECTIVE ACTIONS TAKEN l
l As a result of the NRC inspection conducted on July 8 through July 26,1996 a telecon documenting the conversation and results of the methodology discussed in April 1995 was searchedfor in Vectra's project files. This searth did not uncover a telecon from 1995 documenting the methodology utilized to state in CHRON# 0307939, that the difference in valve weight was acceptable. As a result of the telecon not being retrievable, PIF 96-2334 was initiated. Also, the piping input calculation was revised to document the actual valve weight of 160 lbs. versus 140 lbs. (+/-10%) is acceptable and that no further analysis is l required, nerefore, after formal review of the project timeline and Project Instructions, l
tcumentation of the weight difference wkh flanges fell within the stated allowable (+/ 10%).
ACTIONS TO PREVENT FURTHER OCCURRENCE:
. . . .. .
, . . . . .
.
. .. . .
De NDIT, Nuclear Design Information Transmittal, located in NEP 12-03 will be enforced for utilization for all applicable design inputs. At a minimum this includes Safety Related components. This transmittal form is located in NEP 12-03 Exhibit B. A training session to refresh the engineering department on the NEP 12-03 for Design Information Transmittals, l was held during the departmental meeting on October 1,1996.
! DATE WHEN FULL COMPLIANCE WILL BE MET:
l Full compliance was met with the completion of the departmental meeting on October 1,1996.
l
l i
!
l - -
_ _ _ . _ _ _ _ _ . _ _ _ _ _ _ _
,
.
. .-
'
.
? ATTACHMENT A (Page 4 of 8)
i
- I l STATEMENT OF VIOLATION (254/265-96 010-02)
- l j. NOTICE OF VIOLATION
!
]
I B. 10 CFR 50, Appendix B, Criterion V, "Instructices, Procedures, and Drawings,"
. requires, in part, that activities affecting quality shall be prescribed by documented
- instructions, procedures, and drawings of a type appropriate to the circumstances and j shall be accomplished in accordance with these instructions, procedures, and
'
drawings.
i
.~
Quad Cities Technical Procedure (QCTP) 1020-2, " System Temporary Alteration i Review," requires that for each temporary alteration, the cognizant system engineer ,
i shall review each temporary alteration in effect for greater than three months. This i review must address the continued applicability of the safety evaluation.
Quad Cities Technical Procedure (QCTP) 1020-2, " System Temporary Alteration Review," requires, in part, that all temporary alteration evaluations be submitted to
'
)
the technical staff supervisor for approval.
!
-
Quad Cities Technical Procedure (QCTP) 1020-2, " System Temporary Alteration
{'
-
Review," requires, in part, that the temporary alteration coordinator prepare a
-
l monthly report on all temporary alterations greater than 6 months old to include an l outline of the current status of actions required to resolve each alteration, the
- cognizant individual's name, and identification of alterations that have had limited
!
progress toward resolution.
l Quad Cities Administrative Procedure (QCAP) 2300-24, " Levels 1, 2, and 3 Root l Cause Investigations," requires, in part, that team leaders be trained in root cause
- analysis.
! * * *
Quad Cities Administrativb Procedure'(QCAP) 2300-24, " lev 61s 1,2, and 3 Root
'
.
i Cause Investigations," requires, in part, that causal codes be used in the root cause analysis report.
j Contrary to the above:
>
i a. On July 23,1996, the inspectors identified that temporary alteration I evaluations for temporary alterations 94-2-34, 941-84, and 94-1-121 had not i been submitted to the technical staff supervisor for approval as required by QCTP 1020-2.
- b. On July 23,1996, the inspectors identified that temporary akeration
-
evaluations 94-1-6, 93-1-52, and 94-2-5 failed to address the continued
!
applicability of the safety evaluation as required by QCTP 1020-2.
J s
i
_ . _
_ . _ . _ ._ _ __.____ _ __ _ _ _ _ _ . _ . _ _
ATTACHMENT A (Page 5 of 8)
c. On July 23,1996, the inspecmrs identified that although the monthly report identified temporary alterations in place and projected removal dates, the report failed to identify responsible personnel and temporary alterations which have had limited progress toward resolution as required by QCTP 1020-2. In addition, prior to 1996, monthly temporary alteration reports were not generated as required by QCTP 1020-2.
d. On July 24,1996, the inspectors identified that the team leader for mot cause investigations associated with issues described in problem identification forms (PIFs) 96-0460, 96-0067, 96-0828, and 96-1097 failed to attend training in root cause analysis as requind by QCAP 2300-24.
e. On July 24,1996, the inspectors identified that root cause investigation reports l associated with issues described in problem identification forms (PIFs)
l 96-0460, 96-0067, 96-0828, and 96-1097 did not contain causal codes as l required by QCAP 2300-24.
This is a Severity Level IV problem (Supplement I) (50-254/96010-02; 50-265/96010-02).
REASON FOR VIOLATION:
Quad Cities Station acknowledges the violation for procedure adher.nce.
'Ibe violations of QCTP 1020-2 are attributed to the following reasons:
B.a.- Failure to Obtain Anoroval Signahires l 'Ihe reason the forms were prepared, but not approved, can be attributed to the preparer of l
'
the form not sending the form to the Supervisor for signature and failure of the Temp Alt Coordinator to notice both signatures were not on the form prior to filing it.
. . . =
. . ;*
B.b.- Failure to Review Safety Evaluntions for Continnad Anoliemhility The QCTP 1020-2 procedure requhes a monthly review of temporary alteration safety evaluations (for temp alts installed beyond the 90 days) to ensure that the evaluations have no system or operational limitations which would invalidate them.
'Ihe reason for the violation can be attributed to a failure on the system engineers part to follow the procedure and the supervisors failure to note the deficiency prior to signing the review form.
!
!
,
!
l
, _ _ _
-. . - .-- - - - - - - --- -- -.- _.
. . .-
.
ATTACHMENT A (Page 6 of 8)
l B.c.- Failure to Issue Report per OCTP 1020-2 Requirements l When the administrative responsibility for Temporary Alteration was transitioned to Design
'
Engineering in September of 1995, the new Temp Alt Coordinator was told by his l
l predecessor that the QCTP 1020-2 report was not being issued and that nobody had expressed an interest in an additional temporary alteration report with the information required by QCTP 1020-2. At that time monthly Temp Alts statistics were being tracked in j IQB and reported to the BWR Vice President on a monthly basis. !
- The new Temp Alt Coordinator continued the IQE and vice president reports and began issuing a third report at the monthly TRB meetings to address temp alt removal plans and l schedule. At that time it was thought the " intent" of the QCTP 1020-2 pmcedure was being met.
i The reason for the violation is attributed to a failure of the Temp Alt Coordinator to ,
recognize the need for verbatim procedural compliance for all activities, including reports. l B.d.- Root Cause Analysis Training:
Although QCAP 2300-24, "Ievel 1,2, and 3 Root Cause Investigation" does not specifically i detail root cause analysis training or qualification requirements, an examination into the l training records of the investigators for these four PIFs does show that reasonable root cause analysis training was completed. l PIP 96-0460 - Investigator completed Organization and Programmatic Root Cause Determination Training 09/01/94 and Human Performance Evaluation System Training 05/23/90 (at Dresden Station).
'
PIF 96-0067 - Investigator completed Management-Oversite Risk Tree (MORT) Training 08/24/90 (at I.aSalle Station).
PIF 96-0828 -Investigator completed Human Performance Evaluation System Training 11/10/92.
PIF 96-1097 - Investigator completed Problem Solving / Decision Making Training 09/13/94 and Management-Oversite Risk Tree (MORT) Training 07/15/87.
However, the training required for interviewing techniques and for diagnostics for plant events, as listed in QCAP 2300-24, was not conducted for these four PIFs.
l l B.e.- Causal Codes:
i
! The revision of QCAP 2300-24 which was current during the mentioned PIF investigations
! did have a separate Causal Code Attachment which was not completed by the investigators i
!
for these PIFs.
-
- , ,
._ . - . - -.. - - - - - - __ -. .. - - - - . - - .
.. ..
l.
i ATTACHMENT A (Page 7 of 8)
CORRECTIVE ACTIONS TAKEN:
B.a-c.:
Procedure QCTP 1020-2 has been revised since the NRC inspection. The revision made the following changes:
,
-
Changed the responsibility for performing QCTP 1020-2 reviews from System to l
Design Engineering.
.
-
Reduced the frequency of the required report from monthly to quarterly. !
! -
Requires the Temp Alt Coordinator to review QCTP 1020-2 review forms on file for l Temp Alts greater than three months old for continued applicability on a monthly basis.
-
Requires the Temp Alt Coortlinator to ensure removal plans in the Electronic Work Control System (EWCS) are current.
-
Requires the Plant Operations Review Committee to review Temp Alts greater than three months old on a quarterly basis.
'
l l D . d-e . - !
l It was verified that the investigators for the PIFs listed had completed reasonable Root Cause I Analysis training. .
QCAP 2300-24 was revised on May 22,1996 to remove the Causal Code Attachment sheet.
QCAP 2300-20, " Problem Identification" was revised on May 22,1996 to add a Causal Factor section to the Problem Identification Form. This section has high visibility during
,
PIF approval as it is placed between the Cause/Conective Action section and the final
'
approval signature block. 'Ihis should ensure its completion.
l ACTIONS TO PREVENT FURTHER OCCURRENCE:
-
B.a.: * -
The Temp Alt Coordinator will review all QCTP 1020-2 forms prior to filing to ensure both signatures are present.
BJL.:.
During the monthly review of QCTP 1020-2 forms on file, the Temp Alt Coordinator will (per section F.3 of the revised procedure) note any discrepancies with respect to the safety evaluation review and bring them to the Design Engineering Supervisors attention for further action.
i
l
!
l
- - - . . - .-
/ ..- l
.
ATTACHMENT A (Page 8 of 8) ,
Bai The Temp Alt Coordinator will issue the QCTP 1020-2 report as required by the procedum.
B.d-e. :
QCAP 2300-24 will be revised to add minimum qualifications to investigate PIFs. A list will l then be genented and maintained detailing individuals who meet these minimum ;
requirements to be used as Team Leaders or Evaluators. These actions will be tracked under ;
NTS 254-100-96-01002.01.
DATE WHEN FULL COMPLIANCE WILL BE MET:
QCTP 1020-2 was mvised and issued with an effective date of 9/9/96. )
<
QCAP 2300-24 will be revised and the qualification list generated by 11/15/96.
I l
'
.
l l
!
e *
i