IR 05000250-12-403, 05000251-12-403, on January 13, 2012, Turkey Point Units 3 & 4, NRC Security Report
ML12038A276
Person / Time
Site: Turkey Point  
Issue date: 02/06/2012
From: Binoy Desai
NRC/RGN-II/DRS/PSB2
To: Nazar M
Florida Power & Light Co
DLB1
References
IR-12-403
Download: ML12038A276 (4)


Text

February 6, 2012

SUBJECT:

TURKEY POINT NUCLEAR POWER PLANT-NRC SECURITY INSPECTION REPORT 05000250/2012403 AND 05000251/2012403

Dear Mr. Nazar:

On January 13, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Turkey Point Nuclear Plant, Units 3 and 4. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed on January 13, 2012, with Mr. M. Kiley, and other members of your staff. A re-exit meeting was conducted by telephone on February 3, 2012, with Mr. J. Mocello, and other staff members.

This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

This report documents one finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The deficiencies were corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left the site. The finding had a cross-cutting aspect in the area of Human Performance, in the Work Practices component, H.4.c., for supervisory and management over-sight, in that the licensee failed to ensure management oversight of contract personnel who review potentially disqualifying employee information prior to the employee being granted unescorted access.

Additionally, two licensee-identified violations which were determined to be of very low safety significance are listed in this report. However, because of the very low safety significance and because they are entered into your corrective action program, the NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2 of the NRC Enforcement Policy. If you contest these non-cited violations, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Regional Administrator, Region II, and the NRC Resident Inspector at Turkey Point Nuclear Power Plant. FP&L

2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity-Related InformationBWithhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Binoy B. Desai, Chief Plant Support Branch 2 Division of Reactor Safety

Docket No.: 50-250, 50-251 License No.: DPR-31, DPR-41

Nonpublic Enclosure: Inspection Report 05000250/2012403 and05000251/2012403 w/Attachment: Supplemental Information

cc w/encl: (See page 3)

.

ML12038A276 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRS/PSB2 RII:DRS/PSB2 RII:DRS/PSB2 RII:DRP/BR2 RII:DRS/PSB2 SIGNATURE RA RA RA RA RA NAME K. DAVIS J. GRAHAM A. TRUE D.RICH B. DESAI DATE 01/30/2012 02/02/2012 02/02/2012 02/02/2012 02/02/2012 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO FP&L

3 cc w/encl.:

Michael Kiley Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW 344th Street Florida City, FL 33035

Robert J. Tomonto Licensing Manager Turkey Point Nuclear Plant Florida Power & Light Company 9760 SW 344th Street Florida City, FL 33035