Category:NOTICE OF VIOLATION OF A REGULATION
MONTHYEARML20206F8121988-11-0909 November 1988 Notice of Violation from Insp on 880817-18.Violation Noted: Reactor Control & Safety Equipment Not Calibr from Mar-Aug 1988 & Nuclear Safety Review Board Have Not Met at Required Frequency Since Apr 1983 & Between May 1987 & Aug 1988 ML20151G9931988-07-19019 July 1988 Partially Withheld Notice of Violation from Insp on 880607- 10 ML20202F4121986-07-10010 July 1986 Partially Withheld Notice of Violation from Insp on 860304-07 (Ref 10CFR2.790) ML20009E3931981-07-10010 July 1981 Notice of Violation from Insp on 810122-23 1988-07-19
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000225/19982011998-04-28028 April 1998 Insp Rept 50-225/98-201 on 980407-10.No Violations Noted. Major Areas Inspected:Protection of Public Health & Safety IR 05000225/19930011993-11-24024 November 1993 Insp Repts 50-225/93-01 & 70-0920/93-01 on 931102-01.No Violations Noted.Major Areas Inspected:Accounting & Physical Security,Facility Operation,Measurement & Controls,Shipping & Receiving & Storage & Internal Controls IR 05000225/19900011990-03-27027 March 1990 Safety Insp Rept 50-225/90-01 on 900215.No Violations Noted. Major Areas Inspected:Radiological Controls Program IR 05000225/19900021990-03-26026 March 1990 Exam Rept 50-225/90-02OL on 900309.Exam Results:Both Senior Reactor Operator Candidates Passed Partial Retake Exams IR 05000225/19890011989-07-13013 July 1989 Insp Rept 50-225/89-01 on 890518-19.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Program ML20206F8121988-11-0909 November 1988 Notice of Violation from Insp on 880817-18.Violation Noted: Reactor Control & Safety Equipment Not Calibr from Mar-Aug 1988 & Nuclear Safety Review Board Have Not Met at Required Frequency Since Apr 1983 & Between May 1987 & Aug 1988 IR 05000225/19880041988-11-0404 November 1988 Insp Rept 50-225/88-04 on 880817-18.No Violations Noted. Major Areas Inspected:Facility Organization,Action on Previous NRC Findings,Logs & Records,Procedures, Surveillances & Mgt Oversight IR 05000225/19880031988-09-28028 September 1988 Insp Rept 50-225/88-03 on 880826.No Violations Noted. Major Areas Inspected:Safety Insp in Area of Emergency Preparedness ML20151G9931988-07-19019 July 1988 Partially Withheld Notice of Violation from Insp on 880607- 10 IR 05000225/19880021988-07-13013 July 1988 Insp Rept 50-225/88-02 on 880707-10.Violation Noted.Major Areas Inspected:Nuclear Matl Control,Accounting & Physical Security,Including Facility Organization & Operation, Measurement & Controls,Shipping & Receiving & Inventory IR 05000225/19880011988-06-21021 June 1988 Exam Rept 50-225/88-01OL on 880524-25.Exam Results:One Senior Reactor Operator Failed Both Written & Operating Exams.Proposed License Denial Issued IR 05000225/19870021988-02-0101 February 1988 Exam Rept 50-225/87-02(OL) on 871201-02.Exam Results:One Senior Reactor Operator Passed Written & Operating Exam & One Failed Operating Exam ML20214K5591987-05-18018 May 1987 Insp Rept 50-225/87-01 on 870428.No Violations Noted.Major Areas Inspected:Rpi Critical Facility Ref Data Handbook & Licensee Response to Questions Re Proposed Revs to SAR & Tech Specs for Low Enriched U Core ML20202F4121986-07-10010 July 1986 Partially Withheld Notice of Violation from Insp on 860304-07 (Ref 10CFR2.790) IR 05000225/19860011986-07-0909 July 1986 Partially Withheld Matl Control & Accounting & Physical Security Insp Repts 50-225/86-01 & 70-0920/86-01 on 860304-07 (Ref 10CFR2.790).Violation Noted:Failure to Notify NRC of Physical Security Plan Changes & Perform Alarm Tests IR 05000225/19850031985-11-21021 November 1985 Insp Rept 50-225/85-03 on 851008-09.No Unacceptable Conditions Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Facility Operations,Maint & Surveillance & Emergency Procedures & Annual Exercise ML20137P4451985-09-0505 September 1985 Exam Rept 50-225/OL-85-02 on 850722-24.Exam Results:Both Candidates Passed Written & Oral Exams IR 05000225/19850011985-08-26026 August 1985 Insp Rept 50-225/85-01 on 850708-09.No Violation Noted.Major Areas Inspected:Radiation Protection Program,Including Exposure Control,Instruments & Calibr,Experiments,Training, Repts & Notifications IR 05000225/20030011985-06-26026 June 1985 QA Program Insp Rept 99900401/85-01 on 850225-0301.No Noncompliance or Violations Noted.Major Areas Inspected: Field Action Requests,Corrective Action Repts & Availability Data Program Info Bulletins IR 05000225/20050031985-06-0404 June 1985 Insp Rept 50-458/85-18 on 850225-0503.Deviation Noted: Ranges of Display Instrumentation for HPCS Flow & RHR Svc Water Flow Contrary to Table 7.5-1 of Fsar,Amend 11, Dtd Jan 1984 IR 05000225/19810041981-09-23023 September 1981 IE Insp Repts 50-225/81-04 & 70-0920/81-02 on 810908-11. No Noncompliance Noted.Major Areas Inspected:Organization & Operation,Measurement Controls,Storage & Internal Control, Inventory & Records & Repts IR 05000225/19810031981-07-29029 July 1981 IE Insp Rept 50-225/81-03 on 810701-02.No Noncompliance Noted.Major Areas Inspected:Licensee Action on Previously Identified Enforcement Items,Review of Operations & Action on IE Circulars ML20009E3931981-07-10010 July 1981 Notice of Violation from Insp on 810122-23 IR 05000225/19810021981-06-0404 June 1981 IE Insp Rept 50-225/81-02 on 810427-30.Noncompliance Noted: Failure to Provide Guards W/Most Recent Access Authorization List.Details Withheld (Ref 10CFR2.790) IR 05000225/19810011981-02-27027 February 1981 IE Insp Rept 50-225/81-01 on 810122-23.Noncompliance Noted: Failure to Perform Notifications Required by Tech Specs, Failure to Maintain Records Consistent w/10CFR20 & Failure to Establish Procedures Per Tech Specs 1998-04-28
[Table view] |
Text
C APPENDIX A NOTICE OF VIOLATION Rensselaer Polytechnic Institute Docket No. 50225 As a result of the inspection conducted on January 22-23, 1981 and in accord-ance with the Interim Enforcement Policy, 45 FR 66754 (October 7,1980),the following violations were identified:
A.
Technical Specification 6.6.2, Non-Routine Reports, states, in part: "a.
Reportable Operational Occurrence Reports - Notification shall be made within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by telephone and telegraph to the Director of the appro-priate Regional Office... in the event of a reportable occurrence as defined in Section 1.0."
Technical Specification Section 1 m., Reportable Occurrence, defines, among other items, a reportable occurrence as the occurrence of any facility condition that results in abnormal degradation of one of the several boendaries which are designed to contain the radioactive materials resulting from the fission process or an occurrence of a condition arising from natural events that affect or threaten to affect safe operation of the facility.
Contrary to the above, on January 14, 1981 a moderator (water) line connecting the reactor tank to the moderator storage tank failed due to water freezing in the line, thereby allowing the moderator to leak to the reactor sump, and the occurrence was not reported within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. These tanks and line are one of several boundaries designed to contain radio-active material resulting from the fission process.
Further, on or about January 15, 1981, the Critical Facility was flooded as a result of a freezing drinking water line and this occurrence was not reported within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
The flooding of the facility resulted from freezing, i.e.,
a natural event, and caused the connecting cables from the reactor to the control panel to become wet, a condition that could affect or threaten to affect safe operation of the facility.
This is a Severity Level IV Violation (Supplement I).
B.
10 CFR 20.401, " Records of surveys, radiation monitoring and disposal",
states, in part, in paragraph (b):
"Each licensee shall maintain records in the same units used in this part, showing the results of surveys required by 5 20.201(b)..." Paragraph (b) of 10 CFR 20.201 requires each licensee to make or cause to be made surveys as may be necessary to comply with 10 CFR Part 20.
10 CFR 20.106 places limits on the quantity of material that may be released.
The limits are specified in units of microcuries per milliliter (uC1/ml).
8107280130,10710 PDRADOCKOdOOO2gg
r Appendix A 2
Contrary to the above as of January 23, 1981, the results of surveys performed to comply with 10 CFR 20.106 for discharges from the Critical Facility reactor moderator tank, and all records of these surveys, were maintained in units other than uCi/ml.
This is a Severity Level VI Violation (Supplement IV).
Pursuant to the provisions of 10 CFR 2.201, Rensselear Polytechnic Institute is hereby required to submit to this office within twenty-five days of the date of this Notice, a written statement or explanation in reply, including:
(1) the corrutive steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved.
Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.
Dated 10 JUL 1981 M,
8 f
Thomas T. Martin, Acting Director Division of Engineering and Technical Inspection