IR 05000219/1996009
| ML20217P682 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 04/29/1998 |
| From: | Marilyn Evans NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Roche M GENERAL PUBLIC UTILITIES CORP. |
| References | |
| 50-219-96-09, 50-219-96-11, 50-219-96-12, 50-219-96-9, NUDOCS 9805070021 | |
| Download: ML20217P682 (2) | |
Text
SUBJECT:
lNRC INSPECTION NOS 50-219/96-09,50-219/96-11 AND 50-219/96-12
Dear Mr. Roche:
l This letter refers to your August 29,1997, correspondence, in response to our February 14,1997, letter.
Thank you for informing us of the corrective and preventive actions documented in your letter, as well as the completion of corrective actions described in your January 24,1997, correspondence, in response to our December 6,1996 and January 2,1997 letters. These
. actions will be examined during a future inspection of your licensed program.
Your cooperation with. us is appreciated.
Sincerely,
Original Signed By:
Michele G. Evans, Chief.
Project Branch No. 7 Division of Reactor Projects fl
.
-
-
Docket No. 50-219
'
cc (w/o cv of Licensee Response Letter):
' G. Busch, Manager, Site Licensing, Oyster Creek -
/>
M. Laggart, Manager, Corporate Licensing
j OJ
.
-
i.
,
cc (w/cv of Licensee Response Letter):
State of New Jersey
9905070021 980429 PDR ADOCK 05000219 i
G PH
,
i
!
l
'!
! *
l l
i
>
,
Mr. Michael Distribution (w/cv of Licensee Resoonse Letter);
Region 1 Docket Room (with concurrences)
Nuclear Safety Information Center (NSIC)
{
PUBLIC i
NRC Resident inspector M. Evans, DRP N. Perry, DRP D. Haverkamp, DRP A. Linde, DRP J. Yerokun, DRS B. McCabe, EDO C. Thomas, NRR R. Eaton, NRR R.' Correia, NRR
{
F. Talbot, NRR I
Inspection Program Branch, NRR (IPAS)
DOCDESK i
l
.
i DOCUMENT NAME: G:\\ BRANCH 7\\0C9612. rep
-!
TD receive a copy of this document, indicate in the box:
"C" = Copy without attachment / enclosure
"E" = Copy with attachment / enclosure
"N" = No copy 0FFICE-RI/DRP l
RI/DRP bJ
/
l l
l NAME DHaverkamp M /M - MEvans wyn DATE 04/28/98 04/M /98 04/
/98 04/
/98 04/
/98 0FFICIAL RECORD COPY l.
[,
'
), 9 [
.
t l
l GPU Nuclear,ISc.
L
~
U.S. Route M South
!
' -
NU' CLEAR Post Office Box 388
,
rorked River, NJ 087310388
~
Tel 609-971-4000 l
(609)971-4814 August 29, 1997-
- 6730-97-2191
!
'
U.S.NuclearRegulatoryCommission
= Attn: DocumentControlDesk Washington,DC. 20555 Gentlemen:
Subject: Oyster Creek Nuclear Generating Station (OCNGS)
'
DocketNo. 50-219 Facility Operating License No. DPR-16 L
Response to Inspection Report 50-219/96-12 Notice of Violation
i
. NRC Inspection Report 50-219/96-12, dated February 14,1997, cited a Notice of Violation (NOV)
of 10 CFR 50.59 regarding a change to the shutdown cooling system configuration.. This
,
L inspection report noted that GPU Nuclear was not required to respond io the specific NOV because
!
our response to the similar recent 10 CFR 50.59 violations documented in Inspection Report 50-219/96-09 and 50/219/96-11 should address this violation. This letter provides additional information regarding actions taken and identified corrective actions related to these recent 10 CFR 50.59 violations.
l l
GPU Nuclear lette'r to the NRC dated January 24,1997 (6730-97-2030) provided the required response to NRC Inspection Report 50-219/96-09 and 50-219/96-11 Notices of Violation regarding
!
10 CFR 50.59._-In addition to correcting the specific safety determinations, identified corrective
steps taken included:~ (1) enhancing the safety review training program to emphasize the accuracy
,
L of safety determination question conclusions and to discuss tools available to facilitate licensing basis review and, (2) issuing a " Safety Review Newsletter" reinforcing safety review performance expectations. These steps have been completed as committed in GPU Nuclear letter to the NRC dated January 24,1997 (6730-97-2030).
!
l l
t
' '
s~
o
,
. j e)
.,,.,
...
l'
..
- 6730-97-219i Page 2 of 2
]
!
Additionally, as a result of these violations and the subsequent violation identified in NRC Inspection.
Report 50-219/96-12, GPU Nuclear conducted a self-assessment of the OCNGS ' safety review process implementation. This self-assessment was focused on the Safety Determination element of the GPU
.- Nuclear Safety Review Process. A number of strengths, as well as process issues, were identified.. The '
- self-assessment team identified twenty-three (23) recommendations addressing Safety Resiew Process
,
programmatic aspects, Safety Review Process Training Program improvements, and enhancements to facilitate licensing basis reviews. GPU Nuclear believes that these recommendations will enhance
-
implementation of the Safety Review Process, help prevent recurrence of similar violations, and
!
provide a beneficial effect on plant safety. A formal plan and schedule for implementation of the self-
.
assessment recommendations is being developed and the actions are;being identified in a formal j
corrective action process.
If any additional information is needed, please contact Mr. David J. Distel, Regulatory Affairs, at (201)
,
316-7955.
_
'
Sincerely, i
Michael Vice President and Director,.
Oyster Creek MBR/DJD i
Cc:
ddministrator, Region I NRC Project Manager -
,
NRC Senior Resident inspector