U. S. NUCLEAR REGULATORY COMMISS10N
REGION III
i Report No. 50-155/89L 7RS)
Docket No. 50-155 License No.-DPR-6-Licensee: Consumers Power Company 212 West Michigan Avenue Jackson, MI '49201 Facility Name: Big Rock Point Nuclear Plant Inspection At: Big Rock Point Site, Charlevoix, Michigan Inspection Conducted: June 12-14, 20-22, 26-28, and July 5-6, 1989 Y 984 Inspector:
K. D. Ward 7 [ff.
Date od7t'd Te Approved By:
D. H. Danielson, Chief
/kf7 Materials and Processes Date
,
Section Inspection Summary Inspection on June 12-14, 20-22, 26-28, and July 5-6, 1989 (Report No. 50-155/89012(DRS))
-Areas Inspected: Routine, unannounced safety inspection of inservice inspection (ISI) activities including review of programs (73051), procedures (73052), observation of work activities (73753), and data review (73755).
Results: No violations or deviations were identified. Based on the results of the inspection, the NRC inspector noted the following:
Within the areas revie;ad, the implementation of ISI followed the
requirements of ASME Section XI and the licensee's program.
.
The licensee's staffing of the ISI group was adeqt: ate, and the personnel
were very knowledgeable and conscientious.
The licensee's sampling plan for addressing IGSCC concerns was in accordance with Generic Letter 88-01, and all welds were found to be acceptable.
8907180296 890712 PDR ADOCK 05000155 O
PNU
,
- _ __ _ __
.. _.
.
___ _ ____ -
-
-
.-
-
..
__
. _ _ _
_ _ -
+3
.,.
.
.
<,
.
DETAILS 1.
Persons Contacted Consumers Power Company (CPCo)
- T. Elward, Plant Manager
- G. Withrow, Engineer ing Superintendent
- L. Monshcr, QA Superintendent
'*R. Alexander, Technical Engineer D. Zeigler, Special Projects Supervisor Nuclear Regult. tory Commission (NRC)
- E. Plettner, Senior Resident Inspector N. Williamsen, Resident Inspector Factory Mutual Engineering K. E hke, ANII HQS Inspection, Inc. (MQS)
D. Culver,.ISI Project Coordinator The NRC inspector also contacted and interviewed other licensee and contractor employees.
- Denotes those present at the exit interview July 6, 1989.
2.
Inservice Inspection (ISI) Unit 1 a.
Review of Program (73501)
CPCo Energy Supply Technical Services (ESTS) and MQS Inspection, Inc. (liQS) performed the ISI in accordance with ASME Section XI, 1977 Edition, Summer 1978 Addenda. There was sufficient
.
orgai.izational staff to ensure that acceptable ISI work was l
performed. The sampling inspection plan for addressing intergranular
'
stress corrosion cracking (IGSCC) concerns was in accordance with Generic Letter 88-01. All 12 welds inspected in accordance with Generic Letter 88-01 were found to be acceptable. Where ASME l
requirements were determined to be impractical, specific relief requests were requested from NRR in writing. The NRC inspector
'
reviewed the specific relief requests including the related correspondence between the licensee and the NRC. The NRC inspector
,
l reviewed audits / surveillance of ISI activities conducted by qualified personnel to verify compliance with the ISI program.
o a
L
_
_-
-__
_
_
-________ __ -- _ ______ _ _ _ _ w
F i
.
.
l s
b.-
Review of Procedures'(73052)
All ISI procedures were approved by the Authorize.i Nuclear Inservice Inspector (ANII) and were reviewed by the NRC inspector.
An ultrasonic examination (UT) master slave unit and manual. pulse echo UT detection instruments and transducers of various angles, sizes, and MHZ were used. The nondestructive examinations (NDE) were performed in accordance with ASME Section V, 1977 Edition, Summer 1978 Addenda, c.
Data Review and Evaluation (73755)-
-The examination data was within the criteria as outlined in the applicable NDE procedures and ASME Code requirements. The NRC inspector.'s review included examination of documents relating to NDE equipment, data, and evaiuatiens.
d.
Observation of Work Activities (73753)
The NRC inspector observed work and hat discussions with personnel-during the ISI activities. These observations included the following:
(1) CPCo personnel performing liqJid penetrant examinations on the following:
Component 1D#
Pipe Weld
- 3-RCS-101-59 Pipe Weld
- 3-RCS-101-68 Pipe Weld
- 3-RCS-101-80 Valve to Pipe Weld
- M0-7071 Elbow to Flange
- 4-RDC-101-33 (2) CPCo personnel performing visual examinations on the following:
Component 10#
Pipe Flange
- 3-RCS-101-55BT Pipe Lug Restraint
- 4-ECS-103-8PLR Pipe Restraint
- 3-RCS-101-85PR Pipe Restraint
- 2-RCS-106-3PR Pipe Restraint
- 2-RDS-1C7A-4PR Pipe Restraint
- 12-RDS-101-6PR
,
Pipe Restraint
- 12-RDS-10-1-7PR l
Pipe Restraint
- 4-ECS-102-5PR-1
'
Bolt 3 on North Bundle of Emergency Consenser
- 102N
3 i
,
- - -. _ -
- _ - - - -
_ _ _
. - - - - -
- - - -.
- - - _ -.
_
_
-.- - _ _ _
-
. q, ;
.
-
.
-
,
(3) CPCo personnel performing ultrasonic examinations on the following:
, Component 1D#-
Nozzle to Vessel Weld
~ #104N Nozzle to Vessel Weld
- 1045 (4) MQS personnel performing ultrasonic examinations on the following:
Component ID#
- F-2 D-3 (5) MQS personnel utilizing the ultrasonic master slave unit.
The NRC inspector reviewed the qualifications and certifications of all inspection personnel on site to ensure conformance with SNT-TC-1A. The Level III individual performing the UT on stainless steel welds was qualified at Electric Power Research Institute (EPRI) for IGSCC.
No violations or deviations were identified.
3.
Exit Interview (30703)
The NRC inspector met with site representatives (denoted in Paragraph 1) at the conclusion of the inspection. The NRC inspector summarized the scope and findings of the inspection noted in this report. The NRC inspector also discussed the likely informational content of the inspection report with regard to documents or processes reviewed by the NRC inspector during the inspection. The licensee did not. identify any such documents / processes as proprietary.