IR 05000054/1979004
| ML20008D960 | |
| Person / Time | |
|---|---|
| Site: | 05000054, 07000687 |
| Issue date: | 10/23/1979 |
| From: | Bailey R, Devlin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20008D957 | List: |
| References | |
| 50-054-79-04, 50-54-79-4, 70-0687-79-04, 70-687-79-4, NUDOCS 8010230719 | |
| Download: ML20008D960 (1) | |
Text
- - _ _ - - _ _ - _ - _ _ _ _ _ _
U. S. NUCLEAR REGULATORY COMMISSION (
OFFICE OF INSPECTION AND ENFORCEMENT
,
.
,
,
REGION I
g 50-54/79-04 Report No. 70-687/79-04
l 50-54 R-81 and
Docket No.70-687 License NoS SNM-639 Safeguards Group II I
Licensee:
Union Carbide Co g'c o tion ATTN:
Mr. J. J. McGoverh, Production Manager, Radiochemicals i
Sterling Forest Laboratory
'
P. O. Box 324
Tuxedo, New York 10987
!
'
j Facility Name:
Sterlino Forest Research Center l
Inspection At:
Tuxedo. New York 10987 Inc 'ction Conducted: Aucus' 21-24. 1979 Date of Last Physical Security Inspection Visit: July 17-20, 1978 j
Type of Inspection Unannounced Ph7sical Security
/d [
W I
Inspectors:
\\
i c
Roland J. BaiTey, Physical Jecurity Inspector
/ cate i
'
,
date
-
-
)
l date
,,
,
Approved by:
ddlv
/cb
b-Aames W. Devlin, Chief, Security and Investigation
' date'
'
- d ection, Safeguards Branch
.
!
Insoection Summarv:
'
,
Routine unannounced inspection August 21-24, 1979 (Combined Report Nos. 50-54/
79-04 and 70-687/ 79-04)
i Areas Inspected:
Included review of Security Plan, Protection of SNM, Security Organization, Access Control, Alarm Systems, Keys, Locks, and Combinations, Communications, Surveillance, Procedures, Security Program Review, Radiological Sabotage. The inspection involved 30 inspector hours onsite by one NRC Regional Based Inspcctor.
The inspection was begun during regular hours; two inspection j
hours were accomplished during offshift periods.
'
Resul ts:
The licensee was found to be in compliance with the Physical Security Plan within~the 11 areas examined during the inspection except for the following item: Alarm system, the hot cell manipulators and doors were not locked and alarmed in the manner prescribed by the MPP-3 License Condition 9.2 (Infraction).