IR 05000054/1979004

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-054/79-04 & 70-0687/79-04 on 790821-24. Noncompliance Noted:Alarm Sys,Hot Cell Manipulators & Unlocked Doors.Details Withheld (Ref 10CFR2.790)
ML20008D960
Person / Time
Site: 05000054, 07000687
Issue date: 10/23/1979
From: Bailey R, Devlin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20008D957 List:
References
50-054-79-04, 50-54-79-4, 70-0687-79-04, 70-687-79-4, NUDOCS 8010230719
Download: ML20008D960 (1)


Text

- - _ _ - - _ _ - _ - _ _ _ _ _ _

U. S. NUCLEAR REGULATORY COMMISSION (

OFFICE OF INSPECTION AND ENFORCEMENT

,

.

,

,

REGION I

g 50-54/79-04 Report No. 70-687/79-04

l 50-54 R-81 and

Docket No.70-687 License NoS SNM-639 Safeguards Group II I

Licensee:

Union Carbide Co g'c o tion ATTN:

Mr. J. J. McGoverh, Production Manager, Radiochemicals i

Sterling Forest Laboratory

'

P. O. Box 324

Tuxedo, New York 10987

!

'

j Facility Name:

Sterlino Forest Research Center l

Inspection At:

Tuxedo. New York 10987 Inc 'ction Conducted: Aucus' 21-24. 1979 Date of Last Physical Security Inspection Visit: July 17-20, 1978 j

Type of Inspection Unannounced Ph7sical Security

/d [

W I

Inspectors:

\\

i c

Roland J. BaiTey, Physical Jecurity Inspector

/ cate i

'

,

date

-

-

)

l date

,,

,

Approved by:

ddlv

/cb

b-Aames W. Devlin, Chief, Security and Investigation

' date'

'

  • d ection, Safeguards Branch

.

!

Insoection Summarv:

'

,

Routine unannounced inspection August 21-24, 1979 (Combined Report Nos. 50-54/

79-04 and 70-687/ 79-04)

i Areas Inspected:

Included review of Security Plan, Protection of SNM, Security Organization, Access Control, Alarm Systems, Keys, Locks, and Combinations, Communications, Surveillance, Procedures, Security Program Review, Radiological Sabotage. The inspection involved 30 inspector hours onsite by one NRC Regional Based Inspcctor.

The inspection was begun during regular hours; two inspection j

hours were accomplished during offshift periods.

'

Resul ts:

The licensee was found to be in compliance with the Physical Security Plan within~the 11 areas examined during the inspection except for the following item: Alarm system, the hot cell manipulators and doors were not locked and alarmed in the manner prescribed by the MPP-3 License Condition 9.2 (Infraction).

f 30102307/7 Region I Form 167 (August 1979)

.

-

.

..

_. - -.

.

_.

.

..

_.