Category:INSPECTION REPORT
MONTHYEARIR 05000020/19992011999-07-30030 July 1999 Insp Rept 50-020/99-201 on 990628-0701.No Violations Noted. Major Areas Inspected:Announced Insp Included Onsite Review Selected Aspects of Design Change Functions Program, Radiation Protection Program IR 05000020/19982031999-02-0101 February 1999 Insp Rept 50-020/98-203 on 981207-10.No Violations Noted. Major Areas Inspected:Radiological Control During Major Facility Mod Projects IR 05000020/19972021998-01-0909 January 1998 Insp Rept 50-020/97-202 on 971118-21.No Violations Noted. Major Areas Inspected:Organization & Operations & Maint Activities,Procedures & Documentation,Review & Audit & Design Change Functions & Emergency Preparedness IR 05000020/19972011997-10-0909 October 1997 Insp Repts 50-020/97-201 & 70-0938/97-201 on 970915-16.No Noncompliances Noted.Major Areas Inspected:Security Plan & Matl Accountability Programs IR 05000020/19970011997-05-0808 May 1997 Insp Rept 50-020/97-01 on 970407-11.No Violations Noted. Major Areas Inspected:Respiratory Protection Program,Program Aspects,Radiation Protection Program Policies & Radiological Controls During Irradiation of Bnct Patient IR 05000020/19960021996-10-16016 October 1996 Insp Rept 50-020/96-02 on 960916-20.No Violations Noted. Major Areas Inspected:Emphasis on Maint & Training After Departure of Staff Members Resulted in Improved Program Performance IR 05000020/19930031993-12-17017 December 1993 Insp Repts 50-020/93-03 & 70-0938/93-01 on 931206,08 & 09. No Violations Noted.Major Areas inspected:on-site follow-up of Previously Identified Item,Facility Operation,Shipping & Receiving,Storage & Internal Controls & Physical Security IR 05000020/19920021992-12-30030 December 1992 Insp Rept 50-020/92-02 on 921201-03.No Safety Concerns or Violations Noted.Major Areas Inspected:Previously Identified Items,Treatment Room Mods,Facility Staffing,Control of Experiments,Safety Sys Surveillances & Shipment of Waste IR 05000020/19900011990-10-31031 October 1990 Insp Rept 50-020/90-01 on 900917-20.No Violations Noted. Major Areas Inspected:Operations & Radiological Controls at Facility,Including,Organization,Operations Logbooks,Safety Committees & Status of Previous Items IR 05000020/19890021989-08-15015 August 1989 Insp Rept 50-020/89-02 on 890717-18.No Violations Noted. Major Areas Inspected:Changes to Emergency Preparedness Program,Emergency Facilities & Equipment,Notifications & Communications,Training,Drills & Exercises ML20244D1131989-04-0505 April 1989 Combined Insp Repts 50-020/89-01 & 70-0938/89-01 on 890308-10.Violation Noted.Major Areas Inspected:Nuclear Matl Control,Accounting & Physical Security,Including Organization & Operation & Shipping & Receiving IR 05000020/19880031988-08-29029 August 1988 Insp Rept 50-020/88-03 on 880718-20.No Violations Noted. Major Areas Inspected:Facility Organization,Operations, Notification,Communication,Equipment & Training ML20151H6261988-07-15015 July 1988 Insp Rept 50-020/88-02 on 880620-23.No Violations Noted. Major Areas Inspected:Action Taken on Previous Findings, Facility Operations,Requalification Training,Surveillance, Experiments,Logs & Records & Refueling Activities ML20149D9381987-12-28028 December 1987 Insp Rept 50-020/87-03 on 871202-04.Violation Noted.Major Areas Inspected:Radiological Controls,Including Status of Previously Identified Items,Implementation of Radiation Protection Program & Transportation of Radioactive Matl IR 05000020/19870021987-08-20020 August 1987 Insp Repts 50-020/87-02 & 70-0938/87-02 on 870708 & 09.No Violations Noted.Major Areas Inspected:Nuclear Matl Control & Accounting & Physical Security,Including Organization & Operation & Shipping & Receiving IR 05000020/19860021986-08-21021 August 1986 Insp Rept 50-020/86-02 on 860721-22.No Violations or Deviations Noted.Major Areas Inspected:Radiological Controls Including Status of Previously Identified Items & Training & Qualification of Personnel IR 05000020/19860011986-04-23023 April 1986 Insp Rept 50-020/86-01 on 860225-28.No Violation Noted. Major Areas Inspected:Action on Previous Insp Findings, Facility Tour & Operations,Requalification Training, Surveillance,Experiments & Radiation Protection IR 05000020/19850021985-11-18018 November 1985 Physical Protection Insp Rept 50-020/85-02 on 850925.No Violation Noted.Major Areas Inspected:Implementation of Physical Security Plan IR 05000020/19780061978-10-16016 October 1978 IE Inspec 50-020/78-06 on 780927-29 During Which 1 Item of Noncompliance Was Noted.Reactor Safeguards Comm Meetings Were Too Infrequent 1999-07-30
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000020/19992011999-07-30030 July 1999 Insp Rept 50-020/99-201 on 990628-0701.No Violations Noted. Major Areas Inspected:Announced Insp Included Onsite Review Selected Aspects of Design Change Functions Program, Radiation Protection Program IR 05000020/19982031999-02-0101 February 1999 Insp Rept 50-020/98-203 on 981207-10.No Violations Noted. Major Areas Inspected:Radiological Control During Major Facility Mod Projects IR 05000020/19972021998-01-0909 January 1998 Insp Rept 50-020/97-202 on 971118-21.No Violations Noted. Major Areas Inspected:Organization & Operations & Maint Activities,Procedures & Documentation,Review & Audit & Design Change Functions & Emergency Preparedness IR 05000020/19972011997-10-0909 October 1997 Insp Repts 50-020/97-201 & 70-0938/97-201 on 970915-16.No Noncompliances Noted.Major Areas Inspected:Security Plan & Matl Accountability Programs IR 05000020/19970011997-05-0808 May 1997 Insp Rept 50-020/97-01 on 970407-11.No Violations Noted. Major Areas Inspected:Respiratory Protection Program,Program Aspects,Radiation Protection Program Policies & Radiological Controls During Irradiation of Bnct Patient IR 05000020/19960021996-10-16016 October 1996 Insp Rept 50-020/96-02 on 960916-20.No Violations Noted. Major Areas Inspected:Emphasis on Maint & Training After Departure of Staff Members Resulted in Improved Program Performance IR 05000020/19930031993-12-17017 December 1993 Insp Repts 50-020/93-03 & 70-0938/93-01 on 931206,08 & 09. No Violations Noted.Major Areas inspected:on-site follow-up of Previously Identified Item,Facility Operation,Shipping & Receiving,Storage & Internal Controls & Physical Security IR 05000020/19920021992-12-30030 December 1992 Insp Rept 50-020/92-02 on 921201-03.No Safety Concerns or Violations Noted.Major Areas Inspected:Previously Identified Items,Treatment Room Mods,Facility Staffing,Control of Experiments,Safety Sys Surveillances & Shipment of Waste IR 05000020/19900011990-10-31031 October 1990 Insp Rept 50-020/90-01 on 900917-20.No Violations Noted. Major Areas Inspected:Operations & Radiological Controls at Facility,Including,Organization,Operations Logbooks,Safety Committees & Status of Previous Items IR 05000020/19890021989-08-15015 August 1989 Insp Rept 50-020/89-02 on 890717-18.No Violations Noted. Major Areas Inspected:Changes to Emergency Preparedness Program,Emergency Facilities & Equipment,Notifications & Communications,Training,Drills & Exercises ML20244D1131989-04-0505 April 1989 Combined Insp Repts 50-020/89-01 & 70-0938/89-01 on 890308-10.Violation Noted.Major Areas Inspected:Nuclear Matl Control,Accounting & Physical Security,Including Organization & Operation & Shipping & Receiving IR 05000020/19880031988-08-29029 August 1988 Insp Rept 50-020/88-03 on 880718-20.No Violations Noted. Major Areas Inspected:Facility Organization,Operations, Notification,Communication,Equipment & Training ML20151H6261988-07-15015 July 1988 Insp Rept 50-020/88-02 on 880620-23.No Violations Noted. Major Areas Inspected:Action Taken on Previous Findings, Facility Operations,Requalification Training,Surveillance, Experiments,Logs & Records & Refueling Activities ML20149D9381987-12-28028 December 1987 Insp Rept 50-020/87-03 on 871202-04.Violation Noted.Major Areas Inspected:Radiological Controls,Including Status of Previously Identified Items,Implementation of Radiation Protection Program & Transportation of Radioactive Matl IR 05000020/19870021987-08-20020 August 1987 Insp Repts 50-020/87-02 & 70-0938/87-02 on 870708 & 09.No Violations Noted.Major Areas Inspected:Nuclear Matl Control & Accounting & Physical Security,Including Organization & Operation & Shipping & Receiving IR 05000020/19860021986-08-21021 August 1986 Insp Rept 50-020/86-02 on 860721-22.No Violations or Deviations Noted.Major Areas Inspected:Radiological Controls Including Status of Previously Identified Items & Training & Qualification of Personnel IR 05000020/19860011986-04-23023 April 1986 Insp Rept 50-020/86-01 on 860225-28.No Violation Noted. Major Areas Inspected:Action on Previous Insp Findings, Facility Tour & Operations,Requalification Training, Surveillance,Experiments & Radiation Protection IR 05000020/19850021985-11-18018 November 1985 Physical Protection Insp Rept 50-020/85-02 on 850925.No Violation Noted.Major Areas Inspected:Implementation of Physical Security Plan IR 05000020/19780061978-10-16016 October 1978 IE Inspec 50-020/78-06 on 780927-29 During Which 1 Item of Noncompliance Was Noted.Reactor Safeguards Comm Meetings Were Too Infrequent 1999-07-30
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000020/19992011999-07-30030 July 1999 Insp Rept 50-020/99-201 on 990628-0701.No Violations Noted. Major Areas Inspected:Announced Insp Included Onsite Review Selected Aspects of Design Change Functions Program, Radiation Protection Program IR 05000020/19982031999-02-0101 February 1999 Insp Rept 50-020/98-203 on 981207-10.No Violations Noted. Major Areas Inspected:Radiological Control During Major Facility Mod Projects ML20203H5651998-02-11011 February 1998 Initial Exam Rept 50-020/OL-98-01 Administered on 980130. During Wk of 980126,NRC Administered Retake of Section B of Written Exam to One RO Candidate.Exam Results:Candidate Passed Exam IR 05000020/19972021998-01-0909 January 1998 Insp Rept 50-020/97-202 on 971118-21.No Violations Noted. Major Areas Inspected:Organization & Operations & Maint Activities,Procedures & Documentation,Review & Audit & Design Change Functions & Emergency Preparedness IR 05000020/19972011997-10-0909 October 1997 Insp Repts 50-020/97-201 & 70-0938/97-201 on 970915-16.No Noncompliances Noted.Major Areas Inspected:Security Plan & Matl Accountability Programs IR 05000020/19970011997-05-0808 May 1997 Insp Rept 50-020/97-01 on 970407-11.No Violations Noted. Major Areas Inspected:Respiratory Protection Program,Program Aspects,Radiation Protection Program Policies & Radiological Controls During Irradiation of Bnct Patient PNO-I-96-096, on 961223,licensee Informed NRC of Disturbance Involving Mechanic,Employed by Mit to Support Reactor Facility.Employee Abruptly Left Facility in Very Agitated State.Regional Personnel Will Maintain Contact W/Licensee1996-12-24024 December 1996 PNO-I-96-096:on 961223,licensee Informed NRC of Disturbance Involving Mechanic,Employed by Mit to Support Reactor Facility.Employee Abruptly Left Facility in Very Agitated State.Regional Personnel Will Maintain Contact W/Licensee IR 05000020/19960021996-10-16016 October 1996 Insp Rept 50-020/96-02 on 960916-20.No Violations Noted. Major Areas Inspected:Emphasis on Maint & Training After Departure of Staff Members Resulted in Improved Program Performance ML20128K1101996-10-0303 October 1996 Initial Exam Rept 50-020/OL-96-01 on 960903-05.Exam Results: Four RO & One Srou Successfully Passed Exam IR 05000020/19930031993-12-17017 December 1993 Insp Repts 50-020/93-03 & 70-0938/93-01 on 931206,08 & 09. No Violations Noted.Major Areas inspected:on-site follow-up of Previously Identified Item,Facility Operation,Shipping & Receiving,Storage & Internal Controls & Physical Security ML20058D6691993-11-15015 November 1993 Exam Rept 50-020/OL-93-01 on 930913-15.Exam Results:All Applicants Passed Exams & Issued Appropriate License IR 05000020/19920021992-12-30030 December 1992 Insp Rept 50-020/92-02 on 921201-03.No Safety Concerns or Violations Noted.Major Areas Inspected:Previously Identified Items,Treatment Room Mods,Facility Staffing,Control of Experiments,Safety Sys Surveillances & Shipment of Waste IR 05000020/19900031990-11-26026 November 1990 Exam Rept 50-020/90-03OL on 901015-16.Exam Results:All Candidates Passed All Sections of Exams IR 05000020/19900011990-10-31031 October 1990 Insp Rept 50-020/90-01 on 900917-20.No Violations Noted. Major Areas Inspected:Operations & Radiological Controls at Facility,Including,Organization,Operations Logbooks,Safety Committees & Status of Previous Items IR 05000020/19890021989-08-15015 August 1989 Insp Rept 50-020/89-02 on 890717-18.No Violations Noted. Major Areas Inspected:Changes to Emergency Preparedness Program,Emergency Facilities & Equipment,Notifications & Communications,Training,Drills & Exercises ML20244D1131989-04-0505 April 1989 Combined Insp Repts 50-020/89-01 & 70-0938/89-01 on 890308-10.Violation Noted.Major Areas Inspected:Nuclear Matl Control,Accounting & Physical Security,Including Organization & Operation & Shipping & Receiving ML20244D1081989-03-30030 March 1989 Notice of Violation from Insp on 890308-10.Violation Noted:Failure to Conduct Physical Inventory of All SNM in Possession Under License IR 05000020/19880021988-10-19019 October 1988 Exam Rept 50-020/88-02OL on 880912 & 13.Exam Results:Both Candidates Successfully Completed Respective Exams & Licenses Granted IR 05000020/19880041988-10-19019 October 1988 Exam Rept 50-020/88-04OL on 880912 & 13.Exam Results:One Senior Reactor Operator & One Reactor Operator Passed IR 05000020/19880031988-08-29029 August 1988 Insp Rept 50-020/88-03 on 880718-20.No Violations Noted. Major Areas Inspected:Facility Organization,Operations, Notification,Communication,Equipment & Training ML20151H6261988-07-15015 July 1988 Insp Rept 50-020/88-02 on 880620-23.No Violations Noted. Major Areas Inspected:Action Taken on Previous Findings, Facility Operations,Requalification Training,Surveillance, Experiments,Logs & Records & Refueling Activities IR 05000020/19880011988-03-10010 March 1988 Exam Rept 50-020/88-01OL on 880125-26.Exam Results:All Candidates Passed Exam ML20149D9321987-12-30030 December 1987 Notice of Violation from Insp on 871202-04.Violation Noted: Airborne Concentration of H-3 Exceeded 25% of Limits & Equipment Room Not Posted W/Sign Reading Caution:Airborne Radioactivity Area ML20149D9381987-12-28028 December 1987 Insp Rept 50-020/87-03 on 871202-04.Violation Noted.Major Areas Inspected:Radiological Controls,Including Status of Previously Identified Items,Implementation of Radiation Protection Program & Transportation of Radioactive Matl ML20238E3151987-09-0404 September 1987 Exam Rept 50-020/87-01OL on 870810-11.Exam Results:Both Senior Reactor Operators Passed Written & Operating Exams. Written Exam & Answer Key & Util Comments on Exams After Util Review & NRC Response to Comments Encl IR 05000020/19870021987-08-20020 August 1987 Insp Repts 50-020/87-02 & 70-0938/87-02 on 870708 & 09.No Violations Noted.Major Areas Inspected:Nuclear Matl Control & Accounting & Physical Security,Including Organization & Operation & Shipping & Receiving IR 05000020/19860031986-10-20020 October 1986 Exam Rept 50-020/86-03OL on 860901-05.Exam Results:Three Reactor Operators & One Senior Reactor Operator Candidates Examined.All Candidates Passed All Portions of Exams IR 05000020/19860021986-08-21021 August 1986 Insp Rept 50-020/86-02 on 860721-22.No Violations or Deviations Noted.Major Areas Inspected:Radiological Controls Including Status of Previously Identified Items & Training & Qualification of Personnel IR 05000020/19860011986-04-23023 April 1986 Insp Rept 50-020/86-01 on 860225-28.No Violation Noted. Major Areas Inspected:Action on Previous Insp Findings, Facility Tour & Operations,Requalification Training, Surveillance,Experiments & Radiation Protection IR 05000020/19850021985-11-18018 November 1985 Physical Protection Insp Rept 50-020/85-02 on 850925.No Violation Noted.Major Areas Inspected:Implementation of Physical Security Plan IR 05000020/19850031985-11-0808 November 1985 Exam Rept 50-020/85-03 on 850930 & 1001.Exam Results:One Senior Reactor Operator Candidate & One Reactor Operator Candidate Passed & One Reactor Operator Candidate Failed ML20150D5731978-10-16016 October 1978 Notice of Violation from Inspec on 780927-29 IR 05000020/19780061978-10-16016 October 1978 IE Inspec 50-020/78-06 on 780927-29 During Which 1 Item of Noncompliance Was Noted.Reactor Safeguards Comm Meetings Were Too Infrequent 1999-07-30
[Table view] |
Text
{{#Wiki_filter:h *
U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report N /78-06 Docket N License N R-37 Priority --
Category F Licensee: Massachusetts Institute of Technology MIT Research Reactor 138 Albany Street Cambridge, Massachusetts Facility Name: MITR II Inspection at: Cambridge, Massachusetts Inspection conducted: September 27-29, 1978 Inspectors: \/ ~
'
T.'Stetka, Reactor Inspector
/v dete/ signed c[[
bY +~
E. Greenman, Reactor Inspector
/O l/3 l79 dste signed
'
, , date signed Approved by: .
.b /4.-/3-76
,/2. C. McCaba(Jr. , Chpf/, fea'ctor Projects date signed Section No. 2, RO&Nk'BrMch Inspection Summary:
Inspection on September 27-29,1978 (Recort No. 50-20/78-06)
Areas Inspected: Routine, unannounced inspection by two NRC regional based inspectors of licensee event report review (inoffice and onsite); surveillance; procedures; independent effort; and, turnover of project inspector responsibilit The inspection involved 32 inspector-hours on site by two NRC regional based inspector Results: Of the three areas inspected, no items of noncompliance were found in two areas; one item of noncompliance was identified in one area (Deficiency -
- failure to conduct Reactor Safeguards Coninittee Meeting within required frequency -
l Detail 3).
781206ogq Region I Form 12 (Rev. April 77)
_ _ _ _ _ _ _ _ _ - _ _ _ - .
_ - ____-____
DETAILS 1. Persons Contacted
*J. Bernard, Day Shift Supervisor
*L. Clark, Jr., Director of Reactor Operations P. Coggio, Health Physics Technician
*K. Collins, Reactor Supervisor
*G. Dooley, Senior Operator
*0. Harling, Director of the Reactor Laboratory E. Karaian, Reactor Protection Officer The inspector also interviewed other licensee representatives including operations and office staff personne * denotes those present at the exit intervie . Previous Inspection Item Update (0 pen) Unresolved Item (78-03-03): Requalification Examinations are scheduled for October 28, 1978. Grading and administration will be reviewed subsequent to completion of exams by licensed individual (Closed) Unresolved Item (78-03-02): The licensee filed a supple-mental LER (Report No. 50-20/78-2A, dated June 28,1978),which addressed actions planned to preclude similar type failures. The
,
!
inspectors also reviewed purchase orders for a new flow / differential temperature system and automatic control circuit. Additional chambers and instrumentation are being procure The inspectors had no further questions regarding this item.
I 3. MIT Reactor Safeauards Committee Meetinas
The MITRSC met on July 12,1977 (Meeting No. 57) and September 6, 1978 (Meeting No. 58) and the minutes were reviewed by the inspector Minutes indicated committee identification of late completion of the annual report and biannual review of the security plan. The annual report was submitted to the NRC September 12, 1978 (due date August 30,1978). As of the date of this inspection, the biannual review of a security plan was in progress. The licensee stated that this review will be completed by November 30, 1978. This is, an unresolved item (78-06-01). Review of minutes for Meeting -
Nos. 57 and 58 indicated that meetings were held at a frequency in excess of one year, which is contrary to TS 7.5.2(f) and constitutes a Deficiency level item of noncompliance (78-06-02).
j
-
_____
.
3 Review of Annual Report -
The Annual Report f or the period July 1,1977 to June 30,1978, for the MIT Research Reactor was reviewed. Review included verification that information specified in the Technical Specifications has been reporte With the exception of the late submittal of this report, as identified in paragraph 3, no unacceptable conditions were identifie i Nonroutine Event Review The inspector reviewed the following nonroutine events, both inoffice and onsite, for safety significant circumstances and relationship to Technical Specification protective limits. The licensee's review, evaluation and corrective action was also verified by inspector review and observatio LER Number Description 50-20/78-03 Auxiliary Intake Damper failed to close during testing. The inspector con-firmed that all corrective action had been complete '
50-20/78-04 Two Valves in the Emergency Cooling System were left misaligned following testin The inspector confirmed that all, corrective action had been complete The referenced LERs had not yet been 7 viewed by the Safeguards Com-mittee. A cognizant licensee repr- tive stated that this review would be accomplished at the next j scheduled for November,197 This item (78-06-03) is unresolved
, Facility Tour The inspector toured various areas of the facility including the control room; equipment room; reactor room operating floor; shops and process areas; and, exterior areas to determine the general state of cleanliness, housekeeping and adherence to fire protection guidelines. Minimum licensed operator complement requirements were verified. Nuclear instru mentation operability requirements, flow limits and power level parameters were also confirmed. No unaccept-able conditions were identifie _ _ _ _ _ _ _ _ - _ _ __
- _ _ _ _ _ _ _ _ _ .
.
7. Facili: Procedure Review
' The inspector reviewed the licensee's ad.ninistrative guidance and verified that responsibilities of operators and senior operators were established via procedures, including changes, approvals and levels of subsequent review. The foliowing pro-cedures were reviewed:
- PM-II,1.3-1, Authority and Responsibility for Safe Operations, dated December 14, 1973;
- PM-II,1.4-1, Review and Approval of Plans, Procedures, and Facility Equipment and Changes Thereto, dated April 9,1974; and,
-
PM-II, 1.5-1, Procedure Adherence and Temporary Change Method, dated September 14, 197 No unacceptabit .onditions were identifie The inspector reviewed the following procedures for technical adequacy and conformance with Technical Specification require-ments:
- PM-II, 2.2-6, Nonroutine Reactor Startup, dated March 8, 1975 and Checklist PM 3.1.4, dated February 13, 1978;
- PM-II, 2.4-3, Restart After Unscheduled Shutdown, dated March 24, 1977 and Checklist PM 3.1.6, Restart from Unanticipated Shutdown, dated December 21, 1977;
- PM-II, 2.3, Continuous Power Operation, dated March 8, 1975 and Checklist PM 3.5, Daily Checklist, dated August 9, 1977; and,
-
PM-II, 3.7.1, Security Weekly Checklist, dated April 24, 197 The inspectors walked through partial portions of Checklists PM 3.5 and PM-II, 3.7.1, identified above, and verified step-by-step that the procedures accomplished their intended purpose and were the latest revisio No unacceptable conditions were identifie ;
. . . . _ _ . _ _ _
- .
.
-
.
.-
'
.
3. Limiting Conditions of Operations (LCO) Review The following operating conditions were observed during the plant tour and record reviews:
Parametar TS Limit Obseryed Value Primary Coolant Flow > 1800 gpm 2100 gpm (10/RR)
Reactor . Thermal Power 5 MW 4.7 MW (10/RR)
Pool Water Level > 4 inches below At overflow pipe (IO)
overflow pipe Primary Coolant Outlet < 60'C 48 C (10/RR)
Temperature Shim Rod Position Within 2" of Bank Within 0.2" of Position Bank Position (10)
Scram Insertion Time < l.0 sec to 80% < 0.7 sec for of Full Insertion all control blades (RR)
Recombiner Middle > 50 C 105 C (IO)
Temperature Radiation Monitors Operable Operable (IO/RR)
Containment Building < 3.0" Ho0 1.9" H 2O (RR)
Overpressure Scram 10 - Inspector observation of process instrumentatio RR - Record review by inspecto No items of noncompliance were identifie . Surveillance Review The following surveillance procedures were reviewed to verify that the procedures were adequate to accomplish their intended function and meet Technical Specification requirements:
- PM 6.1.2.5, Charcoal Filter Efficienc3 Test, dated November 6, 1975. Data was reviewed for tests performed on May 22,1978 and November 14, 197 .
.
- PM 6.1.4.4, Primary Coolant Flow Scram Time, dated June 4,197 Data was reviewed for'the test performed on February 29, 197 PM 3.1.1.2, section entitled, Magnet Currents, dated March 30, 1978. Data was reviewed for tests performed on September 26, 1978, September 19, 1978, September 12, 1978, September 5,1978, August 29, 1978 and August 22, 197 PM -6.1.3.3, Primary Coolant Flow Scram Calibration, dated J'ine 4, 1975. Data was reviewed for test performed on February 27, 197 PM 2.3.2, Thermal Power Calibration, dated March 8, 1975. Data was reviewed for calibrations performed for the months of August and September,197 PM 6.1.4.1, Nuclear Safety System Response Time, dated May 24, 1977. Data was reviewed for test performed or. March 4, 197 PM 3.1.1.2, section entitled, Process System Scram Checks, dated May 2, 1978. Data was reviewed for checks performed on September 26, 1978, September 19, 1978, September 12, 1978, September 5,1978, August 29, 1978 and August 22, 197 PM 6.1.3.9.1, Water Monitor Calibration Procedure, dated May 24, 1977. Data was reviewed for checks performed on February 27, April 24, May 13, June 19 and August 24, 197 No items of noncompliance were identifie . Primary System The licensee has completed installation of a third primary coolant
- to secondary coolant heat exchanger. Amendment No. 14 to License R-37 authorizing this change was issued by the NRC on August 25, 1978. Preoperational test procedures had not been written and approved as of the date of this inspection. The inspectors re-viewed documentation associated with the purchase of this unit from a foreign manufacturer. The new heat exchanger is equivalent to one of the existing units. This area is unresolved pending review of procedures, the preoperational test 3rogram and applicable l requirements for the heat exchanger inc'iuding welder qualifications (78-06-04). .
- - - _ _ ___
? .
_
. -
11. Unresolved Items Unresolved items are those items for which further information is required to determine whether they are acceptable items or items of noncompliance. Unresolved Items are contained in Paragraph 3, 5 and 100f this repor . Exit Interview The inspector met with licensee repre.sentatives (denoted in para-graph 1) at the conclusion of the inspection on September 29, 197 The inspector summarized the scope and findings of the inspection as they are detailed in this report. During this meeting, the unresolved items and the item of noncompliance were identifie ;
.