HNP-09-088, Preparation and Scheduling of Operator Licensing Examinations
| ML092440764 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 08/24/2009 |
| From: | Corlett D Progress Energy Carolinas |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| HNP-09-088, RIS-09-011 | |
| Download: ML092440764 (2) | |
Text
Progress Energy G 2SERIAL:
HNP-09-088 AUG 2 4 2009 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/RENEWED LICENSE NO. NPF-63 NRC REGULATORY ISSUE
SUMMARY
2009-11, PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS Ladies and Gentlemen:
As requested by NRC Regulatory Issue Summary 2009-11, "Preparation and Scheduling of Operator Licensing Examinations," Carolina Power & Light Company, doing business as Progress Energy Carolinas, Inc., is providing the enclosed completed NRC Form 536, "Operator Licensing Examination Data," for the Harris Nuclear Plant.
If you have any questions regarding the information provided, please contact Mr. Terry Toler at (919) 362-3259.
Sincerely, D. H. Corlett Supervisor - Licensing/Regulatory Programs Harris Nuclear Plant DHC/mgw
Enclosure:
NRC Form 536 c:
Mr. J. D. Austin (NRC Senior Resident Inspector, HNP)
Ms. M. G. Vaaler (NRC Project Manager, HNP)
Mr. M. T. Widmann (NRC Chief, Operations Branch, Region II)
Progress Energy Carolinas, Inc.
e -.3 Harris Nuclear Plant P. 0. Box 165 iv G
New Hill, NC 27562
NRC FORM 536 U,S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10131W2011 r*2008t EEstimated burden per resonrse to comply with this voiuntary information coliection request: 1 lour. This irormation collection is used to :Ian, budgets and rosrources for operator examinations.
Send comments regarding tcurden OPERATOR LICENSING estimate lo til Recorrzi and FO,,Privacy Services Branch (T-5 F53). U.S.
Nuc~ear Regu:ato"y Com i'ssion, Washington, DC 20555-0001, ar by internet E XA M INiA TI O N D AT Ae-mail tu iintoco'e¢;ls'
._ov, and to the Desk Officer, Office o' Infomnation a
cd Regulatory Affairs, NEOB-10202. (3150-0131), Office of arianaeneert!
end Budget. Washington, DC 205'031 If a
-;ut.ýiv.!*I oo:le'crlor' eons not display a cu~rrently Val 3MI ii~lr;, nrn:.',r. tl:* NR*C,man, not conduct or sFonsor. and a person is nu: :utquiru.t to iaupot, "O,
`the intorrmation collectiPon.
FACILITY NRC REGION Harris Nuclear Plant II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 (Y 2011 CY 2012 CY 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED 0
1 2
1 EXAMINATIONS ESTIMATED NUMBEROF NRC-PREPARED 0
0 0
0 EXAMINATIONS
,B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 2 010 Cy 2011 Cy 2 01 2 Cy 2 013 NUMBER OF REACTOR 8
OPERATORS 0
6 8
NUMBER OF SENIOR REACTOR 4
OPERATORS-INSTANT 0
3 4
4 NUMBER OF SENIOR REACTOR 0
3 OPERATORS - UPC3R,\\DE 4
0 NUMBER OF SENIOR REACTOR 00 0
OPERATORS - LIMITED 0
PROPOSED DATES 2/20/2012 PiRIMARY DATE 5/30/2011 11/26/2012 6/3/2013 3/12/2012 AL.TERNATE DAT.
6/27/2011 12/10/2012 6/24/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE I
NRC FORM 5J6 1-08 PRINTED ON RECYCLED PAPER