Progress Energy AUG 0 6 2008 SERIAL: HNP-08-084 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 NRC REGULATORY ISSUE

SUMMARY

2008-16, PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS Ladies and Gentlemen:

As requested by NRC Regulatory Issue Summary 2008-16, "Preparation and Scheduling of Operator Licensing Examinations," Carolina Power & Light Company, doing business as Progress Energy Carolinas, Inc., is providing the enclosed completed NRC Form 536, Operator Licensing Examination Data for the Harris Nuclear Plant.

If you have any questions regarding the information provided, please contact Mr. Greg Kilpatrick at (919) 362-3355.

Sincerely, D. H. Corlett Supervisor - Licensing/Regulatory Programs Harris Nuclear Plant DHC/mgw Enclosure c:

Mr. M. E. Pribish (Acting NRC Senior Resident Inspector, HNP)

Mr. L. A. Reyes (NRC Regional Administrator, Region II)

Ms. M. G. Vaaler (NRR Project Manager, HNP)

Mr. M. T. Widmann (NRC Chief, Operations Branch, Region II)

Progress Energy Carolinas, Inc.

Harris Nuclear Plant P. 0. Box 165 New Hill, NC 27562 Y(

3

.4-71, 1 -it NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EX(AMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Harris Nuclear Plant A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 2

1 1

2 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2009 CY2010 CY2011 CY2012 NUMBER OF REACTOR 6

6 6

6 OPERATORS 7

6 NUMBER OF SENIOR REACTOR 3

3 3

3 OPERATORS - INSTANT 1

3 NUMBER OF SENIOR REACTOR 3

3 33 OPERATORS - UPGRADE 2

3 NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED 0

PROPOSED DATES PRIMARY DATE 03/02/2009 08/02/2010 05/30/2011 02/20/2012 11/30/2009 11/26/2012 03/12/20 12 ALTERNATE DATE 08/30/2010 06/27/2011 12/10/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 CY 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF I9 9