ENS 58141
ENS Event | |
|---|---|
02:55 Jan 31, 2026 | |
| Title | Manual Reactor Trip Due to a Steam Leak |
| Event Description | The following information was provided by the licensee via phone and email:
At 2155 EST, on January 30, 2026, with unit 1 in mode 1 at 100 percent power, the reactor was manually tripped due to a steam leak in the feedwater heater system. The trip was not complex with all systems responding normally post-trip. Operations responded and stabilized the plant. Decay heat is being removed by the emergency feedwater system. Due to the reactor protection system actuation while critical, this event is being reported as a four-hour, non-emergency notification per 10 CFR 50.72(b)(2)(iv)(B) and an eight-hour, non-emergency notification per 10 CFR 50.72(b)(3)(iv)(A) resulting from a valid actuation of the reactor protection and emergency feedwater systems. There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified. |
| Where | |
|---|---|
| Summer South Carolina (NRC Region 2) | |
| Reporting | |
| 10 CFR 50.72(b)(2)(iv)(B), RPS Actuation | |
| Time - Person (Reporting Time:+-2.73 h-0.114 days <br />-0.0162 weeks <br />-0.00374 months <br />) | |
| Opened: | Elvis Zimmerman 00:11 Jan 31, 2026 |
| NRC Officer: | Josue Ramirez |
| Last Updated: | Jan 31, 2026 |
| 58141 - NRC Website
Loading map... | |
Unit 1 | |
|---|---|
| Reactor critical | Critical |
| Scram | Yes, Manual Scram |
| Before | Power Operation (100 %) |
| After | Hot Standby (0 %) |
WEEKMONTHYEARENS 581412026-01-31T02:55:00031 January 2026 02:55:00
[Table view]10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Trip Due to a Steam Leak ENS 579872025-10-14T19:52:00014 October 2025 19:52:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Trip ENS 575402025-02-10T17:16:00010 February 2025 17:16:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Electrohydraulic Control System Leak ENS 564532023-04-05T10:51:0005 April 2023 10:51:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip ENS 555802021-11-15T22:28:00015 November 2021 22:28:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Main Transformer Fault ENS 530602017-11-08T00:57:0008 November 2017 00:57:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip on Turbine Trip ENS 529322017-08-28T12:37:00028 August 2017 12:37:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip on Turbine Trip ENS 528332017-06-29T12:57:00029 June 2017 12:57:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Trip Due to a Loss of Normal Feedwater Flow to B Steam Generator ENS 502932014-07-22T08:14:00022 July 2014 08:14:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to Low Steam Generator Level ENS 455772009-12-16T19:15:00016 December 2009 19:15:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Following a Failure of the Steam Dump System ENS 454042009-10-02T10:49:0002 October 2009 10:49:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip on Turbine Trip Possibly Caused by a Faulted Main Generator Breaker ENS 439322008-01-24T21:04:00024 January 2008 21:04:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Failure of the "C" Feedwater Flow Control Valve ENS 431412007-02-05T08:07:0005 February 2007 08:07:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Steam Leak During Main Feed Booster Pump Startup ENS 430042006-11-22T09:26:00022 November 2006 09:26:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Main Turbine Trip Due to High- High Steam Generator "B" Water Level During Feedwater Swap Over. ENS 406282004-03-30T16:29:00030 March 2004 16:29:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown, 10 CFR 50.72(b)(3)(ii)(A), Seriously Degraded Automatic Reactor Trip Due to Lo-Lo Steam Generator Level 2026-01-31T02:55:00 | |