21:04 Jan 24, 2008 | |
Title | Manual Reactor Trip Due to Failure of the "C" Feedwater Flow Control Valve |
Event Description | At 1604 [EST], VC Summer Nuclear Station was manually tripped due to rapidly decreasing level in 'C' Steam Generator. The decreasing Steam Generator level was due to a failure of the 'C' Feedwater Flow Control Valve. All systems responded as required. All Emergency Feedwater Pumps automatically started on Lo-Lo Steam Generator level. The Steam Generator levels recovered quickly. The Pressurizer Level Control System cycling resulted in lifting the Letdown System Relief Valve due to high temperature and pressure. The Letdown Relief Valve reseated with no further problems. One Moisture Separator Reheater Relief Valve lifted momentarily and reseated.
Presently, the plant is in Mode 3 with normal RCS pressure and temperature. Decay heat is being removed by dumping steam to the condenser. The plant will remain in Mode 3 until repairs are completed on the 'C' Feedwater Flow Control Valve. During the trip, all control rods fully inserted into the core. The electrical grid is stable and emergency power is being supplied from offsite via the station start-up transformer. There is no known primary to secondary leakage. The licensee has notified the NRC Resident Inspector and will be notifying State and local agencies. |
Where | |
---|---|
Summer South Carolina (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+-2.08 h-0.0867 days <br />-0.0124 weeks <br />-0.00285 months <br />) | |
Opened: | Arnie Cribb 18:59 Jan 24, 2008 |
NRC Officer: | Howie Crouch |
Last Updated: | Jan 24, 2008 |
43932 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 43932\u003C/a\u003E - \u003Ca href=\"/Summer\" title=\"Summer\"\u003ESummer\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EManual Reactor Trip Due to Failure of the \"C\" Feedwater Flow Control Valve\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 43932 - Summer\n","link":"","lat":34.29653611111111,"lon":-81.31628333333333,"icon":"/w/images/6/6b/South_Carolina_Electric_%26_Gas_Company_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | Yes, Manual Scram |
Before | Power Operation (100 %) |
After | Hot Standby (0 %) |
Summer with 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
WEEKMONTHYEARENS 569782024-02-19T07:36:00019 February 2024 07:36:00
[Table view]10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Start of B Emergency Diesel Generator ENS 564532023-04-05T10:51:0005 April 2023 10:51:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip ENS 555802021-11-15T22:28:00015 November 2021 22:28:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Main Transformer Fault ENS 531762018-01-18T17:02:00018 January 2018 17:02:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Emergency Diesel Generator Actuation Due to Loss of One of Two Offsite Power Supplies ENS 530602017-11-08T00:57:0008 November 2017 00:57:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip on Turbine Trip ENS 529622017-09-11T20:48:00011 September 2017 20:48:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Emergency Diesel Generator Actuation on Low Voltage ENS 529322017-08-28T12:37:00028 August 2017 12:37:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip on Turbine Trip ENS 528332017-06-29T12:57:00029 June 2017 12:57:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Trip Due to a Loss of Normal Feedwater Flow to B Steam Generator ENS 502932014-07-22T08:14:00022 July 2014 08:14:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to Low Steam Generator Level ENS 488462013-03-24T08:58:00024 March 2013 08:58:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Start of an Emergency Diesel Generator Due to a Lightning Strike ENS 468992011-05-27T16:00:00027 May 2011 16:00:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Safety Injection Initiated Due to a High Differential Pressure Between Main Steam Lines ENS 455772009-12-16T19:15:00016 December 2009 19:15:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Following a Failure of the Steam Dump System ENS 454042009-10-02T10:49:0002 October 2009 10:49:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip on Turbine Trip Possibly Caused by a Faulted Main Generator Breaker ENS 442312008-05-21T21:04:00021 May 2008 21:04:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Emergency Diesel Generator Shifted to Emergency Start During Post Maintenance Test ENS 439322008-01-24T21:04:00024 January 2008 21:04:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Failure of the "C" Feedwater Flow Control Valve ENS 431412007-02-05T08:07:0005 February 2007 08:07:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Steam Leak During Main Feed Booster Pump Startup ENS 430042006-11-22T09:26:00022 November 2006 09:26:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Main Turbine Trip Due to High- High Steam Generator "B" Water Level During Feedwater Swap Over. ENS 429982006-11-09T19:44:0009 November 2006 19:44:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Emergency Diesel Generator Actuation During Testing ENS 417062005-05-18T05:54:00018 May 2005 05:54:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Loss of Balance of Plant Power Due to Transformers Lockout ENS 408112004-06-13T00:29:00013 June 2004 00:29:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Emergency Diesel Started and Loaded on Bus Undervoltage Signal ENS 406282004-03-30T16:29:00030 March 2004 16:29:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown, 10 CFR 50.72(b)(3)(ii)(A), Seriously Degraded Automatic Reactor Trip Due to Lo-Lo Steam Generator Level ENS 403482003-11-21T14:10:00021 November 2003 14:10:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Control Bank "C" Rods Tripped Due to Incorrect Digital Rod Position Indication (Drpi) 2024-02-19T07:36:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_43932&oldid=426582"