ENS 57769
ENS Event | |
|---|---|
01:27 Jun 20, 2025 | |
| Title | Automatic Reactor Trip and Automatic Actuation of Auxiliary Feedwater System |
| Event Description | The following information was provided by the licensee via phone and email:
On June 19, 2025, at 2027 CDT, with Unit 2 in mode 1 at 100 percent power, the reactor automatically tripped due to an `A' steam generator (SG) water level low signal. The low level in the SG was caused by a feedwater control system malfunction. All safety related systems responded normally post-trip. Operations responded and stabilized the plant. Decay heat is being removed by steam dumps to the main condenser. Farley Unit 1 is not affected. An automatic actuation of auxiliary feedwater system also occurred, which is an expected response from the reactor trip. Due to the reactor protection system actuation while critical, this event is being reported as a four-hour, non-emergency notification per 10 CFR 50.72(b)(2)(iv)(B) and an eight-hour non-emergency notification per 10 CFR 50.72(b)(3)(iv)(A) as an event that results in a valid actuation of the auxiliary feedwater system. There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified. |
| Where | |
|---|---|
| Farley Alabama (NRC Region 2) | |
| Reporting | |
| 10 CFR 50.72(b)(2)(iv)(B), RPS Actuation 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
| Time - Person (Reporting Time:+-1.52 h-0.0633 days <br />-0.00905 weeks <br />-0.00208 months <br />) | |
| Opened: | Blake Mitchell 23:56 Jun 19, 2025 |
| NRC Officer: | Josue Ramirez |
| Last Updated: | Jun 20, 2025 |
| 57769 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 57769\u003C/a\u003E - \u003Ca href=\"/Farley\" title=\"Farley\"\u003EFarley\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EAutomatic Reactor Trip and Automatic Actuation of Auxiliary Feedwater System\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 57769 - Farley\n","link":"","lat":31.223047222222224,"lon":-85.11253055555555,"icon":"/w/images/1/14/Southern_Nuclear_icon.png"}],"imageoverlays":null} | |
Farley | |
WEEKMONTHYEARENS 577892025-06-28T03:09:00028 June 2025 03:09:00
[Table view]10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip and Automatic Actuation of Auxiliary Feedwater System ENS 577692025-06-20T01:27:00020 June 2025 01:27:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip and Automatic Actuation of Auxiliary Feedwater System ENS 569712024-02-16T11:34:00016 February 2024 11:34:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip and Automatic Actuation of Auxiliary Feedwater System ENS 568522023-11-14T16:41:00014 November 2023 16:41:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip ENS 563292023-02-01T15:56:0001 February 2023 15:56:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due and Automatic Actuation of Auxiliary Feedwater System ENS 560282022-08-03T17:58:0003 August 2022 17:58:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to Loss of Power to START-UP Transformer ENS 542872019-09-21T13:00:00021 September 2019 13:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Trip Due to Reactor Coolant Pump Vibration Alarm ENS 540402019-05-01T21:43:0001 May 2019 21:43:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation En Revision Imported Date 5/9/2019 ENS 523952016-11-27T06:26:00027 November 2016 06:26:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip with Automatic Auxiliary Feedwater System Actuation Due to Voltage Oscillations ENS 523562016-11-08T06:00:0008 November 2016 06:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Steam Generator Reduced Feedflow ENS 522742016-10-01T10:12:0001 October 2016 10:12:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Automatic Reactor Trip Due to Inadvertent Closure of Main Steam Isolation Valve ENS 519182016-05-11T11:53:00011 May 2016 11:53:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Farley Unit 2 Trip on Hi Hi Steam Generator Level ENS 510432015-05-05T09:22:0005 May 2015 09:22:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Auxiliary Feedwater Pump Auto Start Signal Initiated During Startup ENS 506182014-11-15T09:53:00015 November 2014 09:53:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Valid Actuation of the Reactor Protection System for Abnormal Rod Position Indication ENS 505332014-10-14T08:41:00014 October 2014 08:41:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Loss of a Start-Up Transformer ENS 491062013-06-12T02:05:00012 June 2013 02:05:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unit 1 Automatic Reactor Trip Due to the Loss of a Start-Up Transformer ENS 478132012-04-06T19:44:0006 April 2012 19:44:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Valid Load Shed Signal Occurred Due to Loss of the 1B Startup Transformer ENS 478092012-04-05T17:20:0005 April 2012 17:20:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unplanned Systems Actuations While Performing a Surveillance Test ENS 466612011-03-07T07:40:0007 March 2011 07:40:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Inadvertant Auto-Start Signal to the 1B Diesel Generator During Testing ENS 459462010-05-22T21:34:00022 May 2010 21:34:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Loss of Steam Generator Water Level Control ENS 458892010-05-01T02:00:0001 May 2010 02:00:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Inadvertent System Actuation Occurred During a Surveillance Test ENS 448552009-02-16T22:55:00016 February 2009 22:55:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Inadvertent Relay Actuation Results in Auto Start of 1C Emergency Diesel Generator ENS 446662008-11-19T10:25:00019 November 2008 10:25:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Trip ENS 436872007-10-03T19:10:0003 October 2007 19:10:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Trip on Loss of Forced Flow to Rcs Loop "a ENS 411752004-11-05T15:11:0005 November 2004 15:11:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Inadvertent Loss of "B" Train Site Power During Testing ENS 406672004-04-12T08:47:00012 April 2004 08:47:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Unit 2 Experienced a Reactor Trip During Startup Due to an Invalid Sr Trip Signal ENS 406662004-04-11T16:05:00011 April 2004 16:05:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Trip for Unknown Reasons During Plant Startup ENS 405582004-03-01T11:22:0001 March 2004 11:22:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unit 1 Experienced a Reactor Trip on Turbine Trip Due to a Feedwater System Problem ENS 403092003-11-10T16:36:00010 November 2003 16:36:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to False Rcp Breaker Open Signal 2025-06-28T03:09:00 | |