ENS 47809
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
17:20 Apr 5, 2012 | |
Title | Unplanned Systems Actuations While Performing a Surveillance Test |
Event Description | Unit 1 was performing a planned refueling outage surveillance test, FNP-1-STP-40.0, 'Safety Injection with Loss of Off-Site Power [LOSP].' The systems were being returned to normal following the actuation portion of the test. When the B1F Sequencer Test Trip Override Switch was taken to the 'ON' position, the 1-2A Diesel Generator output breaker opened, which caused a loss of power to the 'A' Train 4 kV busses. Prior to the event, the 1-2A Diesel Generator was running at normal speed and voltage carrying the 'A' Train 4kV busses. When the diesel generator output breaker opened, it then reclosed upon receipt of the LOSP signal causing the LOSP sequencer loads to automatically start. This included the 1C Component Cooling Water Pump, the 1A High Head Safety Injection Pump (discharge isolation was closed prior to the event), and the 1A and 1B SW pumps. Therefore, during the test, the system actuated in a way that was not part of the planned surveillance testing. The 1A RHR pump was in shutdown cooling mode at the time of the event and was load shed. RHR was restarted manually by the operating crew approximately 1 minute later (no auto start [signal] present due to a loss of site power - LOSP signal without a safety injection signal present).
The investigation revealed that a step in the procedure sequence was not performed during the restoration portion of the test. The operator did not parallel the diesel with off-site power prior to operating the B1F Sequencer Test Trip Override Switch which opened the diesel output breaker without off-site power aligned to the 'A' Train 4kV busses. The 1-2A Diesel Generator was subsequently paralleled to the grid and properly shutdown per the test procedure restoration. The licensee notified the NRC Resident Inspector. |
Where | |
---|---|
Farley Alabama (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
LER: | 05000348/LER-2012-003 |
Time - Person (Reporting Time:+1.02 h0.0425 days <br />0.00607 weeks <br />0.0014 months <br />) | |
Opened: | Alton Deweese 18:21 Apr 5, 2012 |
NRC Officer: | Vince Klco |
Last Updated: | Apr 5, 2012 |
47809 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 47809\u003C/a\u003E - \u003Ca href=\"/Farley\" title=\"Farley\"\u003EFarley\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EUnplanned Systems Actuations While Performing a Surveillance Test\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 47809 - Farley\n","link":"","lat":31.223047222222224,"lon":-85.11253055555555,"icon":"/w/images/1/14/Southern_Nuclear_icon.png"}],"imageoverlays":null} | |
WEEKMONTHYEARENS 569712024-02-16T11:34:00016 February 2024 11:34:00
[Table view]10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip and Automatic Actuation of Auxiliary Feedwater System ENS 568522023-11-14T16:41:00014 November 2023 16:41:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip ENS 563292023-02-01T15:56:0001 February 2023 15:56:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due and Automatic Actuation of Auxiliary Feedwater System ENS 560282022-08-03T17:58:0003 August 2022 17:58:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to Loss of Power to START-UP Transformer ENS 542872019-09-21T13:00:00021 September 2019 13:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Trip Due to Reactor Coolant Pump Vibration Alarm ENS 540402019-05-01T21:43:0001 May 2019 21:43:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation En Revision Imported Date 5/9/2019 ENS 523952016-11-27T06:26:00027 November 2016 06:26:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip with Automatic Auxiliary Feedwater System Actuation Due to Voltage Oscillations ENS 523562016-11-08T06:00:0008 November 2016 06:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Steam Generator Reduced Feedflow ENS 522742016-10-01T10:12:0001 October 2016 10:12:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Automatic Reactor Trip Due to Inadvertent Closure of Main Steam Isolation Valve ENS 519182016-05-11T11:53:00011 May 2016 11:53:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Farley Unit 2 Trip on Hi Hi Steam Generator Level ENS 510432015-05-05T09:22:0005 May 2015 09:22:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Auxiliary Feedwater Pump Auto Start Signal Initiated During Startup ENS 506182014-11-15T09:53:00015 November 2014 09:53:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Valid Actuation of the Reactor Protection System for Abnormal Rod Position Indication ENS 505332014-10-14T08:41:00014 October 2014 08:41:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Loss of a Start-Up Transformer ENS 491062013-06-12T02:05:00012 June 2013 02:05:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unit 1 Automatic Reactor Trip Due to the Loss of a Start-Up Transformer ENS 478132012-04-06T19:44:0006 April 2012 19:44:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Valid Load Shed Signal Occurred Due to Loss of the 1B Startup Transformer ENS 478092012-04-05T17:20:0005 April 2012 17:20:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unplanned Systems Actuations While Performing a Surveillance Test ENS 466612011-03-07T07:40:0007 March 2011 07:40:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Inadvertant Auto-Start Signal to the 1B Diesel Generator During Testing ENS 459462010-05-22T21:34:00022 May 2010 21:34:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Loss of Steam Generator Water Level Control ENS 458892010-05-01T02:00:0001 May 2010 02:00:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Inadvertent System Actuation Occurred During a Surveillance Test ENS 448552009-02-16T22:55:00016 February 2009 22:55:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Inadvertent Relay Actuation Results in Auto Start of 1C Emergency Diesel Generator ENS 436872007-10-03T19:10:0003 October 2007 19:10:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Trip on Loss of Forced Flow to Rcs Loop "a ENS 411752004-11-05T15:11:0005 November 2004 15:11:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Inadvertent Loss of "B" Train Site Power During Testing ENS 405582004-03-01T11:22:0001 March 2004 11:22:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unit 1 Experienced a Reactor Trip on Turbine Trip Due to a Feedwater System Problem ENS 403092003-11-10T16:36:00010 November 2003 16:36:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to False Rcp Breaker Open Signal 2024-02-16T11:34:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_47809&oldid=423978"