WEEKMONTHYEARENS 573332024-09-23T11:20:00023 September 2024 11:20:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram Due to Generator Trip ENS 563732023-02-19T06:05:00019 February 2023 06:05:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Specified System Actuation ENS 561192022-09-26T07:06:00026 September 2022 07:06:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram ENS 520422016-06-24T16:15:00024 June 2016 16:15:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Scram Due to Reactor Recirculation Pumps Degradation ENS 486762013-01-16T02:12:00016 January 2013 02:12:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Loss of a 4160 Volt Bus While Performing Testing ENS 483862012-10-05T17:03:0005 October 2012 17:03:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Rps and Pciv Actuation Due to Loss of Offsite Power ENS 445462008-10-07T10:35:0007 October 2008 10:35:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Specified System Actuation Due to Loss of Power During Testing ENS 437522007-10-28T04:59:00028 October 2007 04:59:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Scram Due to Lowering Intake Level ENS 436352007-09-12T10:35:00012 September 2007 10:35:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Scram Following Intake Structure Traveling Screen Fouling ENS 419872005-09-14T06:13:00014 September 2005 06:13:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram on Low Reactor Vessel Water Level During Planned Maintenance ENS 400722003-08-14T20:26:00014 August 2003 20:26:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unusual Event Declared Due to a Loss of Offsite Power. 2024-09-23T11:20:00
[Table view] |