| Title | Part 21 Report - Ametek 85-Rp2675-01 Power Supply Mounting Hardware |
| Event Description | The following is a synopsis of a Part 21 report received by email:
SUMMARY - AMETEK Solidstate Controls recently discovered a concern with the structural integrity of the 85-RP2675-01 Rack Mounted Power supply. While qualifying a replacement part for an obsolete breaker, the left panel of the power supply came loose after the hardware had sheared during the seismic simulation testing of the qualification. The loss of structural integrity of the power supply led to internal shorting and a premature stoppage of the simulation testing. PROBLEM - During a seismic event, a structural failure of the power supply enclosure resulting in a loss of output could occur. At this point, it is suspected that the failure is related to a variation in the components that increased strain on the power supply enclosure, and it is indeterminate if there is a widespread deviation. It is also possible that the cause of the failure is attributed to inadequately sized hardware that supports the bottom panel of the power supply. In the current design, there are 3 #10-32 machine screws through each of the side panels that fasten to the bottom panel to support the transformer. AMETEK is unable to identify the actual structural support of power supplies in the field. In the recent testing performed, no support was provided under the power supply during the testing. If there is support in the end application from the bottom of the power supply, there may not be a structural concern as the connection screws would not be exposed to the same forces. In this instance, the power supply had been exposed to a peak acceleration of approximately 4.8 giga second. It should also be noted that acceptable results have been obtained in previous seismic tests and changes have not been made to the structure of the power supply since its initial design in 1996. ACTION RECOMMENDED - At this time, there are no actions to take as the evaluation is ongoing. The next step is to determine if the screws are likely to become overstrained with enough seismic force. To do this, AMETEK is repeating the test with two new power supplies. One power supply will not have any changes made to the structure while the second power supply will be enhanced to improve its seismic withstand capabilities. The enhancement is an increase in the size of the hardware to 1/4 inch bolts that connects the side panels to the bottom panel through 5/16 inch through holes with a nut and washers. In combination, these changes will increase the force required to shear the hardware [and] reduce the force on the bolt itself by allowing some movement to dampen the forces during a seismic event. While AMETEK believes this solution will be suitable, it has not been validated with a follow up seismic simulation test. Additionally, AMETEK is unable to determine the criticality of the applications the power supplies are installed in and if the safety function is required to be maintained during a seismic event, which will determine the need to take corrective actions. A report of the next seismic test results will follow upon completion as a final evaluation. The current expected date for completion is May, 2020. For questions or clarifications in the meantime, please contact Ethan Salsbury, Quality Director, at 1-614-410-6293.
The following is an update of a Part 21 report received by email: ACTION RECOMMENDED - AMETEK does not consider this to be a likely failure based on these test results. Additionally, AMETEK is unable to determine the criticality of the applications the power supplies are installed in and if the safety function is required to be maintained during a seismic event, which will determine the need to take corrective actions. The following enhancements can be applied to power supplies in operation: - Add a #10-32 nut to each of the six (6) mounting screws to avoid any lateral movement of the sheet metal parts that would lead to potential elongation or striping of the fastener. - Add support to the bottom of the transformer to prevent horizontal forces on the support screws Although recent testing did not result in a similar failure, AMETEK is taking actions to enhance the design of the power supply. On new power supplies, the mounting hardware will use ¬" bolts that connect the side panels to the bottom panel through 5/16" through holes with a nut and washers. In combination, these changes will increase the force required to shear the hardware reduce the force on the bolt itself by allowing some movement to dampen the forces during a seismic event. Notified R1DO (Bower), R2DO (Miller), R3DO (Feliz-Adorno), and R4DO (Kellar) and Part 21/50.55 Reactors via email. |
| Where | |
|---|---|
| AMETEK, Paragon Energy Solutions Columbus, Ohio (NRC Region 3) | |
| Organization: | Ametek Solidstate Controls |
| Reporting | |
| 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component | |
| Time - Person (Reporting Time:+-5 h-0.208 days <br />-0.0298 weeks <br />-0.00685 months <br />) | |
| Opened: | Ethan Salsbury 00:00 Feb 11, 2020 |
| NRC Officer: | Kerby Scales |
| Last Updated: | Dec 9, 2020 |
| 54520 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[],"imageoverlays":null} | |
AMETEK with 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component | |
WEEKMONTHYEARENS 574832024-10-29T05:00:00029 October 2024 05:00:00
[Table view]10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Part 21 - Interim Report for Regulating Transformer ENS 569582023-12-13T00:00:00013 December 2023 00:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect, 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Part 21 - Interim Report for Oil Filled Capacitors ENS 551672021-04-01T04:00:0001 April 2021 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect, 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Part 21 Interim Report - Failure of Ametek 300V, 250A Clamp Diodes ENS 545202020-02-11T05:00:00011 February 2020 05:00:00 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Part 21 Report - Ametek 85-Rp2675-01 Power Supply Mounting Hardware 2024-10-29T05:00:00 | |