ENS 51421
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
02:00 Sep 24, 2015 | |
Title | High Pressure Coolant Injection Inoperable Due to Mgu Failure |
Event Description | During surveillance testing of the U2 HPCI [High Pressure Coolant Injection] system, the HPCI motor gear unit [MGU] was positioned from 100 percent to 75 percent demand to satisfy operability testing. The motor gear unit did not respond as system demand was returned to 100 percent. This indicated a failure of the MGU which requires declaration of inoperability of the HPCI System. This is a 14 day LCO. HPCI is a single train system and reportable under SAF 1.8 'Event or condition that could have prevented fulfillment of a safety function.'
The licensee will be notifying the NRC Resident Inspector. |
Where | |
---|---|
Dresden ![]() Illinois (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
Time - Person (Reporting Time:+3.87 h0.161 days <br />0.023 weeks <br />0.0053 months <br />) | |
Opened: | Jeff Simpson 05:52 Sep 24, 2015 |
NRC Officer: | Jeff Rotton |
Last Updated: | Sep 24, 2015 |
51421 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 51421\u003C/a\u003E - \u003Ca href=\"/Dresden\" title=\"Dresden\"\u003EDresden\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EHigh Pressure Coolant Injection Inoperable Due to Mgu Failure\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 51421 - Dresden\n","link":"","lat":41.3886,"lon":-88.26909166666667,"icon":"/w/images/b/be/Constellation_icon.png"}],"imageoverlays":null} | |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_51421&oldid=421375"