ENS 42976
From kanterella
Jump to navigation
Jump to search
ENS Event | |
|---|---|
04:54 Nov 9, 2006 | |
| Title | Failure of Control Room Hvac to Maintain Control Room Temperature |
| Event Description | At 22:54 hours on November 8, 2006, the B Control Room HVAC Refrigeration and Condensing Unit (RCU) failed to maintain proper Control Room temperature and cycling excessively. The RCU is a single train system and therefore is reportable per 10CFR50.72(b)(3)(v)(D). The RCU is required to operate during a design basis accident to maintain Main Control Room habitability/temperature. The Air Filtration Unit (AFU) of CREVS remains operable. This places unit 2 in a 30 day LCORA per Tech Spec 3.7.5 Required Action A.1.
The licensee notified the NRC Resident Inspector. |
| Where | |
|---|---|
| Dresden Illinois (NRC Region 3) | |
| Reporting | |
| 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
| Time - Person (Reporting Time:+-0.35 h-0.0146 days <br />-0.00208 weeks <br />-4.7943e-4 months <br />) | |
| Opened: | Bruce Franzen 04:33 Nov 9, 2006 |
| NRC Officer: | Mike Ripley |
| Last Updated: | Nov 9, 2006 |
| 42976 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 42976\u003C/a\u003E - \u003Ca href=\"/Dresden\" title=\"Dresden\"\u003EDresden\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EFailure of Control Room Hvac to Maintain Control Room Temperature\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 42976 - Dresden\n","link":"","lat":41.3886,"lon":-88.26909166666667,"icon":"/w/images/b/be/Constellation_icon.png"}],"imageoverlays":null} | |
Unit 2 | |
|---|---|
| Reactor critical | Critical |
| Scram | No |
| Before | Power Operation (85 %) |
| After | Power Operation (85 %) |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_42976&oldid=427156"