ENS 51046
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
11:00 May 7, 2015 | |
Title | Offsite Notification Due to Shutdown for an Unisolable Steam Leak |
Event Description | At 0700 on 5/7/15, Indian Point Unit 3 commenced a shutdown due to the inability to isolate a steam leak on a feedwater instrument line.
Offsite power is available. Indian Point Unit 2 is unaffected and remains in Mode 1 at 100% power. The NRC Resident Inspector, the NYISO (New York Independent System Operator), and NY Public State Commission have been notified. |
Where | |
---|---|
Indian Point ![]() New York (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release | |
Time - Person (Reporting Time:+-3.82 h-0.159 days <br />-0.0227 weeks <br />-0.00523 months <br />) | |
Opened: | Francisco Mercado 07:11 May 7, 2015 |
NRC Officer: | Charles Teal |
Last Updated: | May 7, 2015 |
51046 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 51046\u003C/a\u003E - \u003Ca href=\"/Indian_Point\" title=\"Indian Point\"\u003EIndian Point\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EOffsite Notification Due to Shutdown for an Unisolable Steam Leak\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 51046 - Indian Point\n","link":"","lat":41.26799722222222,"lon":-73.9514,"icon":"/w/images/7/79/Entergy_icon.png"}],"imageoverlays":null} | |
Unit 3 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (98 %) |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_51046&oldid=421604"