ENS 41046
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
03:18 Sep 17, 2004 | |
Title | Offsite Notification to Public Service Commission |
Event Description | The following was received from the licensee via facsimile:
Indian Point Unit 2 synchronized to the grid at 2318 on September 16, 2004. NRC notification required per Item 44 of IP-SMM-LI-108, Event Notification and Reporting, due to notification of other government agencies of Indian Point Unit 2 synchronizing to the grid. This is a 4-hour non-emergency event notification per 10 CFR 50.72 (b)(2)(xi). The licensee will notify the NRC Resident Inspector. |
Where | |
---|---|
Indian Point New York (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release | |
Time - Person (Reporting Time:+-2.68 h-0.112 days <br />-0.016 weeks <br />-0.00367 months <br />) | |
Opened: | Frank Kich 00:37 Sep 17, 2004 |
NRC Officer: | Gerry Waig |
Last Updated: | Sep 17, 2004 |
41046 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 41046\u003C/a\u003E - \u003Ca href=\"/Indian_Point\" title=\"Indian Point\"\u003EIndian Point\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EOffsite Notification to Public Service Commission\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 41046 - Indian Point\n","link":"","lat":41.26799722222222,"lon":-73.9514,"icon":"/w/images/7/79/Entergy_icon.png"}],"imageoverlays":null} | |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (8 %) |
After | Power Operation (8 %) |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_41046&oldid=428346"