ENS 41241
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
20:55 Dec 3, 2004 | |
Title | Press Release Regarding Plant Shutdown to Repair Secondary Steam Pressure Instrument Line |
Event Description | At 1555 hours0.018 days <br />0.432 hours <br />0.00257 weeks <br />5.916775e-4 months <br /> on 12/03/04, Indian Point Unit 2 commenced a plant shutdown at 200 MW/Hour. Plant shutdown will be completed within 5 to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. This shutdown is due to a crack on an unisolable secondary steam pressure instrument line on the H.P. [high pressure] turbine (PT-412B). The reactor is expected to remain critical at approximately 4% power on auxiliary feedwater. The plant is expected to be restarted within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following repair to the (3/4 inch) instrument line.
The licensee noted that the crack was visually observed during rounds but was not yet blowing steam. The licensee plans to issue a press release. The licensee has notified the NRC Resident Inspector. |
Where | |
---|---|
Indian Point New York (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release | |
Time - Person (Reporting Time:+-3.7 h-0.154 days <br />-0.022 weeks <br />-0.00507 months <br />) | |
Opened: | Tim Rieger 17:13 Dec 3, 2004 |
NRC Officer: | Bill Huffman |
Last Updated: | Dec 3, 2004 |
41241 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 41241\u003C/a\u003E - \u003Ca href=\"/Indian_Point\" title=\"Indian Point\"\u003EIndian Point\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EPress Release Regarding Plant Shutdown to Repair Secondary Steam Pressure Instrument Line\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 41241 - Indian Point\n","link":"","lat":41.26799722222222,"lon":-73.9514,"icon":"/w/images/7/79/Entergy_icon.png"}],"imageoverlays":null} | |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (53 %) |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_41241&oldid=428219"