ENS 47482
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
21:50 Nov 28, 2011 | |
Title | Offsite Notification of Oil Sheen in Discharge Canal |
Event Description | At approximately 1650 EST on 11/28/2011 an oil sheen of about 20 ft. in diameter was observed in the Unit 2 discharge canal. The source of the oil is unknown at this time. There is no adverse impact on the plant. All required notifications have been made, including the New York State Dept. of Environmental Conservation, Westchester County Dept. of Health, and the U.S. Coast Guard National Response Center.
The NRC Resident Inspector has been informed. |
Where | |
---|---|
Indian Point New York (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release | |
Time - Person (Reporting Time:+-3.17 h-0.132 days <br />-0.0189 weeks <br />-0.00434 months <br />) | |
Opened: | Matt Johnson 18:40 Nov 28, 2011 |
NRC Officer: | Charles Teal |
Last Updated: | Nov 28, 2011 |
47482 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 47482\u003C/a\u003E - \u003Ca href=\"/Indian_Point\" title=\"Indian Point\"\u003EIndian Point\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EOffsite Notification of Oil Sheen in Discharge Canal\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 47482 - Indian Point\n","link":"","lat":41.26799722222222,"lon":-73.9514,"icon":"/w/images/7/79/Entergy_icon.png"}],"imageoverlays":null} | |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_47482&oldid=424209"