Title | Partial Loss of Emergency Assessment During Planned Modifications |
Event Description | On September 27, 2012, Comanche Peak Nuclear Power Plant began a cyber security related modification to the Unit 1 and 2 Plant Computer Systems (PCS) and associated network infrastructure. The entire PCS for each unit will be out of service for approximately 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. During that time, the PCS satellite display systems (SDSs) in the TSC and EOF will be inoperable. After approximately 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, the PCS will be restored to service along with the SDSs in the TSC. The SDSs in the EOF will remain out of service until the modification and related site acceptance testing is complete, currently scheduled for October 5, 2012. During this period. the remote display of Radiation Monitoring System (RMS) information in the EOF and OSC will be unavailable.
The loss of EOF SDS terminals will be compensated by use of an alternate plant parameter display system, and loss of EOF/OSC RMS remote display will be compensated by means of the status board recorder telephone loop. Therefore, it is expected that appropriate assessment of plant conditions. notifications, dose projections, and communications could still be made, if required, during the time that the SDSs and RMS remote displays are inoperable. The extended loss of the EOF SDSs and EOF/OSC remote RMS data is being reported in accordance with 10.CFR.50.72(b)(3)(xiii). which is any event that results in a major loss of emergency assessment capability, offsite response capability, or off site communications capability. The NRC Resident Inspector has been notified. A follow-up ENS communication will be made when the EOF SDSs and EOF/OSC remote RMS remote displays are fully restored to service.
Maintenance has been completed on the Unit 1 and Unit 2 Plant Computer System. The system has been tested and returned to service. The licensee will notify the NRC Resident Inspector. Notified R4DO (Powers). |
Where | |
---|---|
Comanche Peak Texas (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+-3.77 h-0.157 days <br />-0.0224 weeks <br />-0.00516 months <br />) | |
Opened: | Raul Martinez 14:08 Sep 27, 2012 |
NRC Officer: | Mark Abramovitz |
Last Updated: | Oct 6, 2012 |
48352 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 48352\u003C/a\u003E - \u003Ca href=\"/Comanche_Peak\" title=\"Comanche Peak\"\u003EComanche Peak\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EPartial Loss of Emergency Assessment During Planned Modifications\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 48352 - Comanche Peak\n","link":"","lat":32.29839166666667,"lon":-97.78532222222222,"icon":"/w/images/d/d7/Luminant_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 556942022-01-07T07:20:0007 January 2022 07:20:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Meteorological Emergency Assessment Capability ENS 553052021-06-13T03:27:00013 June 2021 03:27:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Main Steam Line (Msl) Radiation Monitor Non-Functional ENS 553042021-06-12T22:25:00012 June 2021 22:25:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Main Steam Line (Msl) Radiation Monitor Non-Functional ENS 549292020-09-30T13:15:00030 September 2020 13:15:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | Radiation Monitors Required for Event Assessment Out of Service for Planned Maintenance ENS 544332019-12-10T15:20:00010 December 2019 15:20:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Planned Loss of Emergency Response Facilities and Equipment ENS 544302019-12-10T03:26:00010 December 2019 03:26:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Main Steam Line (Msl) Radiation Monitor to Be Non-Functional ENS 543672019-11-03T14:00:0003 November 2019 14:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness En Revision Imported Date 12/11/2019 ENS 543292019-10-14T14:11:00014 October 2019 14:11:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Main Steam Line (Msl) Radiation Monitor Removed from Service for Planned Maintenance ENS 534722018-06-26T05:00:00026 June 2018 05:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Main Steam Line Radiation Monitor Determined to Be Non-Functional ENS 534232018-05-23T13:48:00023 May 2018 13:48:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Assessment Capability ENS 533802018-05-03T17:20:0003 May 2018 17:20:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Assessment Capability ENS 532122018-02-15T09:06:00015 February 2018 09:06:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Main Steam Line Radiation Monitor Determined to Be Non Functional ENS 531542018-01-06T17:26:0006 January 2018 17:26:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Main Steam Line Radiation Monitor Determined to Be Non-Functional ENS 531432018-01-02T17:37:0002 January 2018 17:37:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Unplanned Loss of Emergency Response Equipment Due to Loss of Plant Computer ENS 531052017-12-06T02:00:0006 December 2017 02:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Unplanned Loss of Multiple Radiation Monitors During Maintenance ENS 529372017-08-30T07:10:00030 August 2017 07:10:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Unplanned Loss of Emergency Response Equipment ENS 523632016-11-13T16:12:00013 November 2016 16:12:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness One Main Steam Line Radiation Monitor Failed ENS 519552016-05-24T15:22:00024 May 2016 15:22:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Unplanned Loss of Emergency Assessment Capability ENS 518712016-04-19T18:43:00019 April 2016 18:43:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Main Steam Line Radiation Detector Determined to Be Non Functional ENS 517172016-02-09T14:12:0009 February 2016 14:12:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Planned Maintenance of the Plant Computer System ENS 516392016-01-07T13:59:0007 January 2016 13:59:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Both Meteorological Towers Due to Power System Failure ENS 509652015-04-07T16:00:0007 April 2015 16:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Inoperable Seismic Instrumentation Identified During Historical Review ENS 509552015-04-05T13:52:0005 April 2015 13:52:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Both Primary and Backup Meteorological Towers Due to Partial Loss of 25Kv Power Distribution ENS 507732015-01-28T16:18:00028 January 2015 16:18:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Emergency Operations Facility Unavailable Due to Planned Ventilation Maintenance ENS 507152015-01-03T11:38:0003 January 2015 11:38:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Meteorological Emergency Assessment Capability ENS 507132015-01-02T09:14:0002 January 2015 09:14:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Meteorological Emergency Assessment Capability ENS 503502014-08-07T14:25:0007 August 2014 14:25:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Emergency Operations Facility Air Conditioning Operating at Reduced Capacity ENS 489532013-04-22T14:00:00022 April 2013 14:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Emergency Operations Facility Not Available ENS 483522012-09-27T17:54:00027 September 2012 17:54:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Partial Loss of Emergency Assessment During Planned Modifications ENS 483182012-09-18T15:55:00018 September 2012 15:55:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Outage of Plant Radiation Monitoring System Remote Readout Due to Planned Modification ENS 482472012-08-29T13:57:00029 August 2012 13:57:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Partial Loss of Plant Radiation Monitoring System Remote Readout ENS 447642009-01-13T08:19:00013 January 2009 08:19:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Communications Capability Due to a Fiber Optic Cable Cut ENS 442822008-06-10T15:11:00010 June 2008 15:11:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of the Safety Parameter Display System ENS 441912008-05-07T16:00:0007 May 2008 16:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Multiplexer Power Supply ENS 422042005-12-13T19:45:00013 December 2005 19:45:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Offsite Notification ENS 408842004-07-20T20:39:00020 July 2004 20:39:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Assessment Capability Exceeding 8 Hours 2022-01-07T07:20:00 [Table view] | |