ENS 48157
ENS Event | |
---|---|
04:00 Aug 3, 2012 | |
Title | Part 21 - Defective Valve Seal Cap |
Event Description | The following was provided via fax:
Background: On July 17, 2012, Duke Power - McGuire NPP notified Flowserve Corporation that they had attempted to install a Seal Cap supplied by Flowserve on a Kerotest 1-1500 Y-Type Globe Valve. They found that the Seal Cap could not be installed on the valve due to interference with the Valve Stem. Discussion: The Seal Cap is used to contain leakage past the Valve Diaphragm. The Seal Cap fits over the Valve Stem after Handle removal and is screwed onto the Yoke until it contacts the top of the Body. It is then seal welded to the Body to create a leak tight cap. At this point the Seal Cap is considered pressure retaining. Inspection of the Seal Cap revealed an inside flat bottom in lieu of the conical bottom shown on the drawing. The conical drill point allows clearance for the valve stem when the Seal Cap is installed on the valve. Review of a layout shows the Seal Cap with a Flat bottom cannot be completely installed whether the valve is open or closed. Conclusion: The Seal Cap with a flat bottom cannot be properly installed on the Kerotest Series R9900 size 1/2 to 2 Valves for which it was designed. The Valve Stem will prevent complete installation and the ability to seal weld the Seal Cap to the Body. The Seal Caps supplied would not be available at the Nuclear Power Plant site for an urgent repair if required. The following Nuclear Power Plant Utilities were provide these Seal Caps without the conical shaped area. TVA - Purchase Order# 00020077-00050 and 00020077-00018 First Energy - Purchase Order# 45108999, and 45254808 Alabama Power - Purchase Order# QP040387, QP040872 and QP060575 Duke Power - Purchase Order # NM18494 001, NM25245, 00108212 and 00124677. Based on the above, the Nuclear Utilities need to be notified concerning this deviation so that an evaluation may be performed to determine if this constitutes a defect that could create a substantial safety hazard. |
Where | |
---|---|
Flowserve Raleigh, North Carolina (NRC Region 1) | |
Organization: | Flowserve |
Reporting | |
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
Time - Person (Reporting Time:+10.57 h0.44 days <br />0.0629 weeks <br />0.0145 months <br />) | |
Opened: | Robert Barry 14:34 Aug 3, 2012 |
NRC Officer: | Charles Teal |
Last Updated: | Aug 3, 2012 |
48157 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[],"imageoverlays":null} | |
Flowserve with 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
WEEKMONTHYEARENS 571672024-06-07T04:00:0007 June 2024 04:00:00
[Table view]10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Check Valve Fails Bench Test ENS 562192022-09-11T04:00:00011 September 2022 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Flowserve Solenoid Valve Deficiency Report ENS 559742022-02-02T04:00:0002 February 2022 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 REPORT- Failure of Flowserve Solenoid Coil ENS 555052021-08-04T04:00:0004 August 2021 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Actuator Failure ENS 538912019-02-20T05:00:00020 February 2019 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Flowserve Valve Assist Springs May Prevent Full Closure ENS 522122016-08-31T04:00:00031 August 2016 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Notification - Flowserve Swing Check Valves ENS 481572012-08-03T04:00:0003 August 2012 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Defective Valve Seal Cap ENS 480042012-05-25T04:00:00025 May 2012 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Published Flow Coefficients for Pilot Operated Relief Valves Greater than Actual 2024-06-07T04:00:00 | |