04:00 May 25, 2012 | |
Title | Part 21 Report - Published Flow Coefficients for Pilot Operated Relief Valves Greater than Actual |
Event Description | This is to notify the US Nuclear Regulatory Commission, in accordance with the provisions of 10CFR-Part 21 of a potential deviation identified by Flowserve Corporation.
On May 25, 2012, Flowserve Corporation notified Exelon - Byron and Braidwood Nuclear Power Stations of the results of a Steam flow test performed by Wyle Labs to confirm steam flow capacity against that specified for WKM PORVs. A refurbished size 6 class 900 WKM model 70-19-9 angle pattern control valve with 4" linear trim had been tested to determine its maximum steam flow capacity. The maximum steam flow was approximately 74% of the anticipated flow rate based on the original published WKM rated Cv for the valve. Background and Discussion: As part of their power up rate project, Exelon Braidwood Station procured larger 4" linear valve trim from Flowserve, Raleigh for their steam generator PORVs to increase the valve's steam flow capacity. The original valves were supplied by ACF Industries, WKM Valve Division in the mid to late 1970's with 3" linear trim. The designs for the WKM PORV valves were subsequently acquired by Flowserve. The larger trim was installed in a site spare PORV and tested for steam flow capacity. CFD analysis performed by Flowserve on the tested valve with the 4" trim, determined a Cv value that would yield steam flows similar to the test results. Analysis of the valve with the original 3" trim produced similarly reduced Cv values. Based on this testing and subsequent CFD analysis it appears that the originally published WKM rated Cv values for WKM angle control valve model 70-19-9 for sizes greater than size 2 are higher than actual values. The actual Cv's are believed to be 65% to 75% of the original WKM ratings. Conclusion: Based on the above, the Nuclear Industry needs to be notified concerning this deviation so that an evaluation may be performed to determine if this constitutes a defect that could create a substantial safety hazard. Although Flowserve subsequently acquired the rights to the WKM PORV designs, it does not have the historic sales records from ACF industries (WKM Valve Division). The total number of WKM valves potentially affected and their installed locations are not known. |
Where | |
---|---|
Flowserve Raleigh, North Carolina (NRC Region 1) | |
Organization: | Flowserve |
Reporting | |
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
Time - Person (Reporting Time:+322.32 h13.43 days <br />1.919 weeks <br />0.442 months <br />) | |
Opened: | Robert D Barry 14:19 Jun 7, 2012 |
NRC Officer: | Donald Norwood |
Last Updated: | Jun 7, 2012 |
48004 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[],"imageoverlays":null} | |
Flowserve with 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
WEEKMONTHYEARENS 571672024-06-07T04:00:0007 June 2024 04:00:00
[Table view]10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Check Valve Fails Bench Test ENS 562192022-09-11T04:00:00011 September 2022 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Flowserve Solenoid Valve Deficiency Report ENS 559742022-02-02T04:00:0002 February 2022 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 REPORT- Failure of Flowserve Solenoid Coil ENS 555052021-08-04T04:00:0004 August 2021 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Actuator Failure ENS 538912019-02-20T05:00:00020 February 2019 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Flowserve Valve Assist Springs May Prevent Full Closure ENS 522122016-08-31T04:00:00031 August 2016 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Notification - Flowserve Swing Check Valves ENS 481572012-08-03T04:00:0003 August 2012 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Defective Valve Seal Cap ENS 480042012-05-25T04:00:00025 May 2012 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Published Flow Coefficients for Pilot Operated Relief Valves Greater than Actual 2024-06-07T04:00:00 | |