ENS 46979
From kanterella
Jump to navigation
Jump to search
ENS Event | |
|---|---|
15:00 Jun 23, 2011 | |
| Title | High Pressure Coolant Injection System Declared Inoperable |
| Event Description | During performance of scheduled surveillance testing, the Unit 1 High Pressure Coolant Injection (HPCI) turbine control valve did not fully close when the system was secured. The HPCI system was removed from service and the control valve was inspected. The inspection identified a broken steam supply valve internal to the control valve. This condition would have prevented HPCI from fulfilling its safety function and is being reported for the inability of a single train system to mitigate the consequences of an accident. |
| Where | |
|---|---|
| Limerick Pennsylvania (NRC Region 1) | |
| Reporting | |
| 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
| Time - Person (Reporting Time:+2.65 h0.11 days <br />0.0158 weeks <br />0.00363 months <br />) | |
| Opened: | John Weissinger 17:39 Jun 23, 2011 |
| NRC Officer: | Donald Norwood |
| Last Updated: | Jun 23, 2011 |
| 46979 - NRC Website
Loading map... | |
Unit 1 | |
|---|---|
| Reactor critical | Critical |
| Scram | No |
| Before | Power Operation (100 %) |
| After | Power Operation (100 %) |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_46979&oldid=87503"