| Title | Hot Oil System Emergency Shutdown Fails Annual Preventative Maintenance Check |
| Event Description | It was reported to EH&S Management that on April 29, 2010, the annual preventative maintenance functional check on the hot oil system emergency shutdown system failed. This function is an Item Relied On For Safety (IROFS) and is identified in the Integrated Safety Analysis (ISA) Summary for the conversion area of the Columbia Fuel Fabrication Facility. This IROFS designation is ADUHOS-407 and this IROFS is a control applied to a fire related sequence. Information pertaining to the accident sequence can be found in the January 2010, ISA Summary 03 page 78. There were no actual fire incidents; there were no hazardous materials or special nuclear materials released.
Current plant status: This functional test requires the conversion lines and associated hot oil dryer be shut down. The conversion lines which utilize the hot oil system protected by this function were in normal shutdown at the time of the functional check was performed. The Columbia Fuel Fabrication Facility is currently shutdown for performance of the annual inventory and associated maintenance outage. This notification is made base on 10 CFR 70 Appendix A (b)(2) 'Loss or degradation of items relied on for safety that results in failure to meet the performance requirements of 10 CFR 70.61.' The performance requirements for this accident sequence require the Overall Likelihood Index (OLI) be a -4, which corresponds to Highly Unlikely. With this control failure the sequence OLI is -3 which corresponds to Unlikely. Corrective Actions: The corresponding conversion lines and associated hot oil dryer systems are currently in a normal shutdown mode, and will remain so until appropriated troubleshooting and repairs are conducted and the IROFS is restored to an operable status. |
| Where | |
|---|---|
| Westinghouse Electric Corporation Columbia, South Carolina (NRC Region 2) | |
| License number: | SNM-1107 |
| Reporting | |
| Part 70 App A (B)(2) | |
| Time - Person (Reporting Time:+19.5 h0.813 days <br />0.116 weeks <br />0.0267 months <br />) | |
| Opened: | Gerard Couture 12:34 Apr 30, 2010 |
| NRC Officer: | Pete Snyder |
| Last Updated: | Apr 30, 2010 |
| 45884 - NRC Website | |
Westinghouse Electric Corporation with Part 70 App A (B)(2) | |
WEEKMONTHYEARENS 574722024-12-12T15:30:00012 December 2024 15:30:00
[Table view]Part 70 App A (B)(2) Degradation of Safety Item ENS 542982019-09-27T19:15:00027 September 2019 19:15:00 Part 70 App A (B)(2) Procedural Noncompliance with Administrative Item Relied on for Safety ENS 519742016-06-02T16:45:0002 June 2016 16:45:00 Part 70 App A (B)(2) Administrative Verifications of Ventilation Clean-Out Containers Were Not Performed ENS 510242015-04-29T14:00:00029 April 2015 14:00:00 Part 70 App A (B)(2) Valve Classified as Item Relied on for Safety Failed to Operate as Designed ENS 459262010-05-13T16:33:00013 May 2010 16:33:00 Part 70 App A (B)(2) a Valve Classified as an Item Relied on for Safety Found Closed While Position Indicator Showed Open ENS 458842010-04-29T17:04:00029 April 2010 17:04:00 Part 70 App A (B)(2) Hot Oil System Emergency Shutdown Fails Annual Preventative Maintenance Check ENS 449282009-03-23T11:30:00023 March 2009 11:30:00 Part 70 App A (B)(2) Degraded Item Required for Safety in the Pelleting Area ENS 438142007-11-30T16:00:00030 November 2007 16:00:00 Part 70 App A (B)(2) Potential Loss of Item Relied on for Safety (Irofs) ENS 414242005-02-19T21:04:00019 February 2005 21:04:00 Part 70 App A (B)(2) 24-Hour Criticality Control Report - Failure to Obtain Required Powder Samples 2024-12-12T15:30:00 | |