ENS 43404
ENS Event | |
---|---|
21:00 Jun 4, 2007 | |
Title | Unanalyzed Condition Due to Identified Non Compliant Fire Protection Manual Operator Actions |
Event Description | During performance of NFPA-805 Transition Project Task SUP-1, 'Manual Action Compliance,' it was determined there were 5 non-compliant manual operator actions that were being performed to achieve and maintain hot safe shutdown in Fire Area 29, Admin Building Electrical & Piping Room 1. These manual actions were being performed in an Appendix R Section III.G.1/G.2 fire area, however, they do not meet the criteria for allowable manual actions specified in RIS 2006-10, 'Regulatory Expectations with Appendix R Paragraph III.G.2 Operator Manual Actions.'
The discovery of these non-compliant manual actions is being reported as an unanalyzed condition as defined by 10 CFR 50.72(b)(3)(ii). The alternate compensatory measure for Fire Area 29 is to perform the manual action. An extent of condition review has been initiated that will encompass the remainder of the safe shutdown areas in both Prairie Island Nuclear Generating Plant (PINGP) units. The results of the extent of condition will be documented in the site's corrective action program with compensatory measures being established as appropriate. The 60-day licensee event report, submitted to the Commission in accordance with 10 CFR 50.73(a)(2)(ii), will provide the results of the manual action compliance review and follow-up corrective actions. The licensee will notify the NRC Resident Inspector.
During performance of NFPA-805 Transition Project Task SUP-1, 'Manual Action Compliance,' it was determined that non compliant manual operator actions are credited to achieve and maintain hot safe shutdown for a fire. The following actions were identified during the extent of condition reviews conducted subsequent to EN 43404 report. Numbers of Non-compliant Actions and Fire Areas Affected: 2 actions for Fire Area 2, Ventilation Fan Room, Unit 1; 2 actions for Fire Area 10, Train A Event Monitoring Equipment Room; 6 actions for Fire Area 20, Unit 1 4.16 KV Safeguards Switchgear (Bus 16); 2 actions for Fire Area 22, 480V Safeguards Switchgear (Bus 121); 1 action for Fire Area 23, Unit 2, 4.16 KV Normal Switchgear (Bus 23, 24); 2 actions for Fire Area 30, Administration Building Electrical & Piping Room #2; 1 action for Fire Area 33, Battery Room 11; 1 action for Fire Area 34, Battery Room 12; 6 actions for Fire Area 37, Unit 1 480V Normal Switchgear Room; 4 actions for Fire Area 41A, Screenhouse (DDCWP Rooms); 6 actions for Fire Area 41B, Screenhouse Basement; 10 actions for Fire Area 58 and 73, [Auxiliary] Building Ground Floor Unit 1 & 2; 2 actions for Fire Area 59, [Auxiliary] Building Mezzanine Level Unit 1; 1 action for Fire Area 80, 480V Safeguard Switchgear Room (Bus 112); and 4 actions for Fire Area 81, 4.16 KV Safeguard Switchgear Room (Bus 15). These manual actions are credited for safe shutdown in an Appendix R Section III.G.1/G.2 fire area; however, they do not meet the criteria for allowable manual actions specified in RIS 2006-10, 'Regulatory Expectations with Appendix R Paragraph III.G-2 Operator Manual Actions.' The discovery or these non-compliant manual actions is being reported as an unanalyzed condition as defined by 10 CFR 50.72(b)(3)(ii). The manual actions have been determined to be feasible and will be treated as alternate compensatory measures for Fire Areas 2, 10, 20, 22, 23, 30, 33, 34, 37, 41A, 41B, 58, 59, 73, 80, and 81. An extent of condition review is continuing that will encompass the remainder of the safe shutdown areas in both Prairie Island Nuclear Generating Plant (PINGP) Units. The licensee notified the NRC Resident Inspector. Notified R3DO (M. Phillips).
During performance of NFPA-805 Transition Project Task SUP-1, 'Manual Action Compliance,' it was determined that noncompliant manual operator actions are credited to achieve and maintain hot safe shutdown for a fire. The following actions were identified during the extent of condition reviews conducted subsequent to EN 43404 report.
1 action for Fire Area 4, Fuel Handling Area 12 actions for Fire Area 31, 'A' Train Hot SD panel, AFW & Air Compressors 11 actions for Fire Area 32, 'B' Train Hot SD panel, AFW & Air Compressors 2 actions far Fire Area 38, Unit 2 480V Normal Switchgear Room 1 action for Fire Area 39, Radwaste Building 2 actions for Fire Area 46, Cooling Tower Equipment House 4 actions for Fire Area 69, Turbine Building Ground & Mezzanine Floors Unit 1 3 actions for Fire Area 70, Turbine Building Ground & Mezzanine Floors Unit 2 2 actions for Fire Area 71, Containment Unit 2 2 actions for Fire Area 72, Containment Annulus Unit 2 5 actions for Fire Area 74, Aux Building Mezzanine Level Unit 2 These manual actions are credited for safe shutdown in an Appendix R Section III.G.1/G.2 fire area, however, they do not meet the criteria for allowable manual actions specified in RIS 2006-10, 'Regulatory Expectations with Appendix R Paragraph III.G.2 Operator Manual Actions.' The discovery of these non-compliant manual actions is being reported as an unanalyzed condition as defined by 10 CFR 50.72(b)(3)(ii). The manual actions have been determined to be feasible and will be treated as alternate compensatory measures for Fire Areas 4, 31, 32, 38, 39, 46, 69, 70, 71, 72, and 74. This concludes the extent of condition review of the safe shutdown areas in both Prairie Island Nuclear Generating Plant (PINGP) units. The licensee notified the NRC Resident Inspector. Notified the R3DO (Phillips). |
Where | |
---|---|
Prairie Island Minnesota (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition | |
Time - Person (Reporting Time:+-3.53 h-0.147 days <br />-0.021 weeks <br />-0.00484 months <br />) | |
Opened: | William Bodin 17:28 Jun 4, 2007 |
NRC Officer: | Mark Abramovitz |
Last Updated: | Jun 6, 2007 |
43404 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 43404\u003C/a\u003E - \u003Ca href=\"/Prairie_Island\" title=\"Prairie Island\"\u003EPrairie Island\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EUnanalyzed Condition Due to Identified Non Compliant Fire Protection Manual Operator Actions\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 43404 - Prairie Island\n","link":"","lat":44.62379722222222,"lon":-92.64153611111111,"icon":"/w/images/6/6c/Xcel_Energy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 526382017-03-20T21:39:00020 March 2017 21:39:00
[Table view]10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Historical Event Related to Past Operability ENS 518772016-04-21T20:50:00021 April 2016 20:50:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Missing Fire Barriers ENS 516422016-01-08T01:00:0008 January 2016 01:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition - Appendix R Credited Procedures Not in Place ENS 516162015-12-21T22:25:00021 December 2015 22:25:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Due to Non-Compliant Fire Protection Manual Operator Actions ENS 514982015-10-26T12:03:00026 October 2015 12:03:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Associated with a High Energy Line Break ENS 509942015-04-19T22:45:00019 April 2015 22:45:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Due to Non Compliance with 10 Cfr 50 App R ENS 508012015-02-10T08:50:00010 February 2015 08:50:00 10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Voids Identified That Result in an Unanalyzed Condition ENS 505312014-10-13T19:25:00013 October 2014 19:25:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Due to a Missing Fire Barrier ENS 505232014-10-10T22:17:00010 October 2014 22:17:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Missing Fire Barrier ENS 504752014-09-19T18:53:00019 September 2014 18:53:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Due to Missing Fire Barriers ENS 503622014-08-08T15:26:0008 August 2014 15:26:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Due to Lack of Appropriate Fuse Protection ENS 496852013-12-31T15:33:00031 December 2013 15:33:00 10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Due to Removal of Multiple Steam Generator Lateral Support Shims and Bumpers ENS 493612013-09-19T17:20:00019 September 2013 17:20:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition No Documented Plan in Place to Receive Additional Fuel Oil During Maximum Probable Flood Condition ENS 491282013-06-17T21:15:00017 June 2013 21:15:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Potential Unanalyzed Condition - Carbon Dioxide Fire Suppression System Does Not Meet Design Requirements ENS 479492012-05-22T21:30:00022 May 2012 21:30:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Identified During a Fire Protection Review ENS 475222011-12-09T17:59:0009 December 2011 17:59:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition- Degraded Fire Barrier Between Fire Areas ENS 466992011-03-25T15:53:00025 March 2011 15:53:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Potential Unanalyzed Condition Due to Power Level Greater than Limit ENS 465082010-10-23T00:49:00023 October 2010 00:49:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition - Battery Chargers May Lockup During a Design Basis Event ENS 463182010-10-07T18:52:0007 October 2010 18:52:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Degraded Fire Barrier ENS 462612010-09-16T18:43:00016 September 2010 18:43:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition - Degraded Fire Barrier Identified ENS 458552010-04-19T03:25:00019 April 2010 03:25:00 10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Lco 3.0.3 Entry and Loss of Safety Function Due to Loss of Turbine Building High Energy Line Break Compensatory Measure ENS 455672009-12-14T18:00:00014 December 2009 18:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Related to Certain Fire Conditions ENS 449312009-03-23T22:00:00023 March 2009 22:00:00 10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition for Postulated Missile Hazard That Could Disable Both Trains of Component Cooling ENS 447732009-01-14T17:30:00014 January 2009 17:30:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Manual Actions for Fire Not in Compliance ENS 443792008-07-31T18:45:00031 July 2008 18:45:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Postulated High-Energy Line Break That Could Disable Both Trains of Component Cooling ENS 435922007-08-24T16:30:00024 August 2007 16:30:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Fire Barrier Separation Criteria Not Met for Afwp Rooms ENS 434042007-06-04T21:00:0004 June 2007 21:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Due to Identified Non Compliant Fire Protection Manual Operator Actions ENS 430102006-11-25T01:45:00025 November 2006 01:45:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition ENS 413772005-02-06T02:46:0006 February 2005 02:46:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition 4160 Volt Relaying and Metering Single Failure Vulnerability 2017-03-20T21:39:00 | |