Title | Inadvertent De-Energization of 4160 V Safety Related A.C. Bus with Edg Auto Start |
Event Description | On 5/18/05 at 20:59 the 1A3 4160 V safety related A.C. bus inadvertently de-energized and the 1A Emergency Diesel Generator [EDG] automatically started and loaded onto the bus. The inadvertent de-energization of the 1A3, 4160 V bus appears to have resulted from testing of the 4160 V under voltage relays. Currently, normal power has been restored to the 1A3, 4160 V bus and the 1A Emergency Diesel Generator has been secured.
This notification is being made pursuant to 10 CFR 50.72(b)(3)(iv)(A) to be completed within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> as a safety systems actuation of the 1A3, 4160 V under voltage relaying and inadvertent start and load of the 1A Emergency Diesel Generator. The licensee notified the NRC Resident Inspector.
On 5/18/05 at 20:59 the 1A3 4,160 KV safety related AC bus inadvertently de-energized and the 1A Emergency Diesel Generator (EDG) automatically started and loaded onto the bus. This event was initiated during the performance of a plant surveillance 1-OSP-100.07, to test the 1A3 4,160 KV Bus Under Voltage Relay. The 1A EDG loaded and carried the 1A3 bus. The 1B3 4,160 KV bus was unaffected and the "B" side power remained energized. This update is to provide the following additional information identified during the follow up investigation. This update is to identify that HVS-1B, Containment Fan Cooler, did not start as expected after the 1A EDG automatically loaded on the 1A3 4,160 KV Bus. The HVS-1A and HVS-1B were both load shed from the bus prior to closure of the 1A EDG output breaker. The HVS-1A did start as expected following closure of the EDG output breaker. The HVS-1B is on the three (3) second load block for the 1A EDG to restart, but did not start. A Root Cause Team has been formed to identify the cause of the initiating event and the auto-start failure of HVS-1B. A Condition Report was generated and a troubleshooting plan has been developed to determine the cause of the initiating event and failure of the HVS-1B to automatically restart. The 1B3 4,160 KV safety related AC bus and associated EDG were not affected by this event and remained operable during and following the event. Troubleshooting for the subject failed equipment is ongoing. The licensee notified the NRC Resident Inspector. The R2DO (Ogle) was notified. |
Where | |
---|---|
Saint Lucie Florida (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+3.63 h0.151 days <br />0.0216 weeks <br />0.00497 months <br />) | |
Opened: | James Hurchalla 04:37 May 19, 2005 |
NRC Officer: | Arlon Costa |
Last Updated: | May 19, 2005 |
41715 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 41715\u003C/a\u003E - \u003Ca href=\"/Saint_Lucie\" title=\"Saint Lucie\"\u003ESaint Lucie\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EInadvertent De-Energization of 4160 V Safety Related A.C. Bus with Edg Auto Start\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 41715 - Saint Lucie\n","link":"","lat":27.348672222222223,"lon":-80.24639722222223,"icon":"/w/images/9/9b/NextEra_Energy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 560872022-09-03T02:48:0003 September 2022 02:48:00
[Table view]10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Loss of Feed Pump ENS 550782021-01-20T23:22:00020 January 2021 23:22:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to Trip of Motor Control Center ENS 530362017-10-26T06:12:00026 October 2017 06:12:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Following a Loss of Load ENS 527572017-05-15T22:00:00015 May 2017 22:00:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Valid Emergency Diesel Generator Signal Generated Upon Loss of 4160V Power ENS 521912016-08-21T23:37:00021 August 2016 23:37:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unusual Event - Loss of Offsite Power ENS 514232015-09-17T16:22:00017 September 2015 16:22:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Valid Actuation of Uv Relays Following Loss of Unit 2 Startup Transformer ENS 513022015-08-10T02:15:00010 August 2015 02:15:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip During Testing ENS 506072014-11-12T20:48:00012 November 2014 20:48:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Lowering Steam Generator Water Level ENS 495362013-11-14T17:18:00014 November 2013 17:18:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Low Level in the 2B Steam Generator ENS 483882012-10-08T01:40:0008 October 2012 01:40:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Essential Bus Deenergized While Defueled ENS 483692012-10-03T12:43:0003 October 2012 12:43:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Failure of Startup Transformer Caused Undervoltage Condition on Essential Bus ENS 479152012-05-11T07:55:00011 May 2012 07:55:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Feedwater Control Valve Failure ENS 476572012-02-10T06:34:00010 February 2012 06:34:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Maintenance Activities Cause an Inadvertent Emergency Diesel Generator Start ENS 469282011-06-06T07:29:0006 June 2011 07:29:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Error During Reactor Protection System Surveillance Leads to Reactor Trip ENS 458432010-04-15T19:39:00015 April 2010 19:39:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unplanned Manual Reactor Trip ENS 453742009-09-21T17:34:00021 September 2009 17:34:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unplanned Manual Reactor Trip During Reactor Startup ENS 449522009-04-01T22:05:0001 April 2009 22:05:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unplanned Manual Reactor Trip ENS 442762008-06-07T12:18:0007 June 2008 12:18:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Following the Trip of a Condensate Pump ENS 438742007-12-29T06:31:00029 December 2007 06:31:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip When Five Control Rods Unexpectedly Dropped 20 Inches ENS 419112005-08-11T14:48:00011 August 2005 14:48:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip on a Condensate Pump Bus Lockout ENS 417152005-05-19T00:59:00019 May 2005 00:59:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Inadvertent De-Energization of 4160 V Safety Related A.C. Bus with Edg Auto Start ENS 412932004-12-25T11:52:00025 December 2004 11:52:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unit 2 Manually Tripped to Remove Failing Condensate Pump from Service ENS 410722004-09-26T03:56:00026 September 2004 03:56:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unusual Event Declared Due to a Loss of Offsite Power ENS 404032003-12-20T14:49:00020 December 2003 14:49:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Rps Actuation Due to Loss of Turbine Generator Excitation 2022-09-03T02:48:00 | |