Title | Component Cooling System Surge Tank Supports May Fail During a Seismic Event |
Event Description | During an ISI inspection of the component cooling system, it was discovered that several of the surge tank support stiffener plates were missing due to a design change that was never fully implemented. This condition creates a question as to the adequacy of the tanks to withstand a seismic event. This deficiency affects both trains of component cooling on Units 1 and 2. The problem will be corrected on Unit 1 while it is in its refueling outage. Work on the Unit 2 "A" train is currently ongoing, making that train of the component cooling system inoperable, therefore, putting the plant in a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> LCO. When work on the "A" train is completed, they will exit the LCO, but re-enter it when work begins on the "B" train.
Licensee will notify the NRC Resident Inspector, the State and local agencies.
The subject EN#40359 was made on 11/28/03. Following additional review by the licensee, this event was determined to not meet the reportability requirements of 10 CFR 50.72. The event was determined to not result in a condition that could have prevented fulfillment of a safety function, as the tank supports were analyzed to withstand a seismic event. In addition, the event did not result in the plant being in an unanalyzed condition. The condition did not prevent the fulfillment of a safety function or system that is needed to remove residual heat or mitigate the consequences of an accident. The licensee plans to notify the NRC Resident Inspector. Notified R2DO Caudle Julian. |
Where | |
---|---|
Catawba South Carolina (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition 10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
Time - Person (Reporting Time:+-2 h-0.0833 days <br />-0.0119 weeks <br />-0.00274 months <br />) | |
Opened: | Jamie Mcconnell 01:55 Nov 28, 2003 |
NRC Officer: | Chauncey Gould |
Last Updated: | Jan 26, 2004 |
40359 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 40359\u003C/a\u003E - \u003Ca href=\"/Catawba\" title=\"Catawba\"\u003ECatawba\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EComponent Cooling System Surge Tank Supports May Fail During a Seismic Event\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 40359 - Catawba\n","link":"","lat":35.05162222222222,"lon":-81.06938055555555,"icon":"/w/images/7/75/Duke_Energy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Not Critical |
Scram | No |
Before | Refueling Shutdown (0 %) |
After | Refueling Shutdown (0 %) |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_40359&oldid=428750"