DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application

From kanterella
(Redirected from DCL-24-008)
Jump to navigation Jump to search
Schedule Considerations for Review of the DCPP License Renewal Application
ML24017A322
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/17/2024
From: Zawalick M
Pacific Gas & Electric Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
DCL-24-008
Download: ML24017A322 (1)


Text

Pacific Gas and Eler:mc Company "'

Maureen R. Zawalick Diablo Canyon Power Plant Vice President P.O. Box 56 Business and Avila Beach, CA 93424 Technical Services 805.545.4242 Maureen.Zawalick@pge.com

PG&E Letter DCL-24-008

ATTN: Document Control Desk 10 CFR 54 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Diablo Canyon Units 1 and 2 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Schedule Considerations for Review of the DCPP License Renewal Application

Reference:

1. Nuclear Regulatory Commission Letter to Pacific Gas and Electric Company, Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Determination of Acceptability and Sufficiency for Docketing and Notice of Opportunity to Request a Hearing Regarding Pacific Gas and Electric Company's Application for License Renewal, dated December 19, 2023 (ML23341A004)

Dear Commissioners and Staff:

In Reference 1, the Nuclear Regulatory Commission (NRC) indicated the staff is in the process of formulating its projected review schedule for the Diablo Canyon Power Plant license renewal application (LRA). Pacific Gas and Electric Company (PG&E) has reviewed the typical LRA review schedule based on industry precedent and identified that some of these activities, such as audits, could potentially be scheduled during the upcoming Unit 2 refueling outage. The specific dates associated with the Unit 2 refueling outage have been communicated to the NRC License Renewal Project Managers. In addition to the normal resource demands during a refueling outage, the upcoming outage includes the NRC regional inspection on license renewal and implementation of many license renewal inspections. Therefore, PG&E requests the NRC avoid scheduling any LRA review activities during the upcoming Unit 2 refueling outage to ensure sufficient resources are available to support NRC staff requests and respond to review questions in a timely manner.

PG&E makes no new or revised regulatory commitments (as defined in NEI 99-04) in this letter.

If you have any questions or require additional information, please contact Mr. Philippe Soenen at (805) 459-3701.

A member of the STARS Alliance Callaway Diablo Canyon Palo Verde Wolf Creek Document Control Desk PG&E Letter DCL-24-008 Page 2

Sincerely,

Maureen Zawalick January 17, 2024 Vice President Generation Business and Technical Services Date

cc: Diablo Distribution Christian Arechavaleta, Department of Water Resources Kimberly Conway, NRC Environmental Project Manager Lauren Gibson, License Renewal Branch Chief Brian Harris, NRC Senior Project Manager Mahdi O. Hayes, NRC Senior Resident Inspector Samson S. Lee, NRC Senior Project Manager John Monninger, NRC Region IV Administrator

A member of the STARS Alliance Callaway Diablo Canyon Palo Verde Wolf Creek