MONTHYEARDCL-24-095, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20232024-11-0606 November 2024 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2023 DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report DCL-24-045, Annual Report of Occupational Radiation Exposure for 20232024-04-24024 April 2024 Annual Report of Occupational Radiation Exposure for 2023 DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations DCL-24-022, Notification of Changes to Decommissioning Schedule2024-04-0202 April 2024 Notification of Changes to Decommissioning Schedule DCL-24-023, Revised Certification of Permanent Cessation of Power Operations2024-04-0202 April 2024 Revised Certification of Permanent Cessation of Power Operations DCL-24-031, Decommissioning Funding Report2024-03-27027 March 2024 Decommissioning Funding Report DCL-24-032, 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant2024-03-27027 March 2024 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant DCL-24-028, Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability2024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability DCL-24-018, License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2024-02-28028 February 2024 License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) DCL-2024-507, 2023 Annual Report on Discharge Self-Monitoring2024-02-27027 February 2024 2023 Annual Report on Discharge Self-Monitoring DCL-24-020, Nuclear Material Transaction Report for New Fuel2024-02-21021 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-014, Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage2024-02-12012 February 2024 Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage DCL-24-013, Nuclear Material Transaction Report for New Fuel2024-02-0707 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel DCL-2024-502, 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP)2024-01-25025 January 2024 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP) DCL-2024-501, Sea Turtle Stranding Report (Green Sea Turtle)2024-01-24024 January 2024 Sea Turtle Stranding Report (Green Sea Turtle) DCL-2024-500, Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring2024-01-18018 January 2024 Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) 2024-09-09
[Table view] Category:Annual Operating Report
MONTHYEARML24003A7212023-11-27027 November 2023 Independent Safety Committee; Diablo Canyon Nuclear Power Plant Operations, Thirty-Third Annual Report on the Safety July 1, 2022-June 30, 2023 ML23318A2092023-09-13013 September 2023 Thirty-Third Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations, July I, 2022 - June 30, 2023 - Volume 1 (Main Report) ML23318A2082023-09-13013 September 2023 Thirty-Third Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations, July I, 2022 - June 30, 2023 - Volume 2 (Exhibits) DCL-23-041, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20222023-05-22022 May 2023 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2022 ML23037A8312022-09-28028 September 2022 Independent Safety Committee; Thirty-Second Annual Report on the Safety July 1, 2021 - June 30, 2022, Volume II - Exhibits ML23037A8302022-09-28028 September 2022 Independent Safety Committee; Thirty-Second Annual Report on the Safety July 1, 2021 - June 30, 2022, Volume I - Main Report ML23041A3772022-06-30030 June 2022 Independent Safety Committee Thirty-Second Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations July 1, 2021-June 30, 2022 DCL-22-033, Annual Report of Occupational Radiation Exposure for 20212022-04-26026 April 2022 Annual Report of Occupational Radiation Exposure for 2021 DCL-2021-514, NPDES Receiving Water Monitoring Program: 2020 Annual Report2021-04-27027 April 2021 NPDES Receiving Water Monitoring Program: 2020 Annual Report DCL-19-078, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20182019-10-0303 October 2019 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2018 DCL-18-028, Submittal of 2017 Annual Radioactive Effluent Release Report2018-04-24024 April 2018 Submittal of 2017 Annual Radioactive Effluent Release Report DCL-18-032, Summary Report of 10 CFR 50.59. Changes, Tests, and Experiments, for the Period of January 1, 2016, Through December 31, 20172018-04-18018 April 2018 Summary Report of 10 CFR 50.59. Changes, Tests, and Experiments, for the Period of January 1, 2016, Through December 31, 2017 DCL-17-075, Transmittal of 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20162017-09-0606 September 2017 Transmittal of 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2016 DCL-16-105, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20152016-10-18018 October 2016 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2015 DCL-2016-518, NPDES Receiving Water Monitoring Program: 2015 Annual Report2016-04-25025 April 2016 NPDES Receiving Water Monitoring Program: 2015 Annual Report DCL-16-045, Submittal of 2015 Annual Radiological Environmental Operating Report2016-04-21021 April 2016 Submittal of 2015 Annual Radiological Environmental Operating Report DCL-16-046, Summary Report of 10 CFR 50.59, Changes, Tests, and Experiments, for the Period of January 1, 2014, Through December 31, 20152016-04-18018 April 2016 Summary Report of 10 CFR 50.59, Changes, Tests, and Experiments, for the Period of January 1, 2014, Through December 31, 2015 ML15117A6572015-04-27027 April 2015 2014 Annual Radiological Environmental Operating Report for the Year 2014) - Part 3 of 5 ML15117A6622015-04-27027 April 2015 2014 Annual Radiological Environmental Operating Report for the Year 2014) - Part 5 of 5 ML15117A6602015-04-27027 April 2015 2014 Annual Radiological Environmental Operating Report for the Year 2014) - Part 4 of 5 DCL-15-046, 2014 Annual Radiological Environmental Operating Report for the Year 2014) - Part 1 of 52015-04-27027 April 2015 2014 Annual Radiological Environmental Operating Report for the Year 2014) - Part 1 of 5 ML15117A6562015-04-27027 April 2015 2014 Annual Radiological Environmental Operating Report for the Year 2014) - Part 2 of 5 DCL-13-077, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20122013-07-30030 July 2013 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2012 DCL-13-058, Annual Commitment Change Summary Report2013-05-30030 May 2013 Annual Commitment Change Summary Report DCL-13-029, Annual Radiological Environmental Operating Report2013-04-30030 April 2013 Annual Radiological Environmental Operating Report DCL-13-045, Annual Nonradiological Environmental Operating Report2013-04-30030 April 2013 Annual Nonradiological Environmental Operating Report DCL-13-042, Submittal of 2012 Annual Radioactive Effluent Release Report2013-04-30030 April 2013 Submittal of 2012 Annual Radioactive Effluent Release Report DCL-13-022, Annual Report of Occupational Radiation Exposure for 20122013-03-12012 March 2013 Annual Report of Occupational Radiation Exposure for 2012 DCL-12-117, 2011 Annual Commitment Change Summary Report2012-11-20020 November 2012 2011 Annual Commitment Change Summary Report DCL-12-070, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20112012-07-19019 July 2012 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2011 DCL-12-040, 2011 Annual Radioactive Effluent Release Report2012-04-30030 April 2012 2011 Annual Radioactive Effluent Release Report ML1120101782011-07-19019 July 2011 Diablo Canyon, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for 2010 DCL-11-082, Diablo Canyon, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for 20102011-07-19019 July 2011 Diablo Canyon, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for 2010 DCL-11-082, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for 20102011-07-19019 July 2011 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for 2010 ML11129A0852011-04-28028 April 2011 2010 Annual Radiological Environmental Operating Report DCL-11-049, 2010 Annual Radioactive Effluent Release Report, in Accordance with 10 CFR 50.36a(a)(2) and Section 5.6.32011-04-28028 April 2011 2010 Annual Radioactive Effluent Release Report, in Accordance with 10 CFR 50.36a(a)(2) and Section 5.6.3 DCL-11-051, 2010 Annual Nonradiological Environmental Operating Report2011-04-28028 April 2011 2010 Annual Nonradiological Environmental Operating Report ML1111807472011-04-28028 April 2011 2010 Annual Nonradiological Environmental Operating Report DCL-11-050, Diablo Canyon, Units 1 & 2, 2010 Annual Radiological Environmental Operating Report2011-04-28028 April 2011 Diablo Canyon, Units 1 & 2, 2010 Annual Radiological Environmental Operating Report DCL-10-055, Units, 1 and 2, 2009 Annual Commitment Change Summary Report2010-05-19019 May 2010 Units, 1 and 2, 2009 Annual Commitment Change Summary Report DCL-10-043, Submittal of 2009 Annual Radiological Environmental Operating Report2010-04-28028 April 2010 Submittal of 2009 Annual Radiological Environmental Operating Report DCL-10-039, 10 CFR 50.59 Report of Changes, Tests, and Experiments for the Period January 1, 2008, Through December 31, 20092010-04-19019 April 2010 10 CFR 50.59 Report of Changes, Tests, and Experiments for the Period January 1, 2008, Through December 31, 2009 DCL-10-034, Annual Report of Occupational Radiation Exposure for 20092010-03-26026 March 2010 Annual Report of Occupational Radiation Exposure for 2009 DCL-2009-523, 2008-2009 Annual Report for Storm Water Discharges Associated with Industrial Activities, Diablo Canyon Power Plant (Dcpp), Facility Wdid No. 340I0182482009-06-11011 June 2009 2008-2009 Annual Report for Storm Water Discharges Associated with Industrial Activities, Diablo Canyon Power Plant (Dcpp), Facility Wdid No. 340I018248 DCL-09-031, Submittal of 2008 Annual Commitment Change Summary Report2009-05-0707 May 2009 Submittal of 2008 Annual Commitment Change Summary Report DCL-09-029, 2008 Annual Radiological Environmental Operating Report2009-04-24024 April 2009 2008 Annual Radiological Environmental Operating Report DCL-08-061, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for 2007, Affect Peak Cladding Temperature (PCT) Calculations2008-07-23023 July 2008 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for 2007, Affect Peak Cladding Temperature (PCT) Calculations DCL-08-031, Transmittal of 10 CFR 50.59 Report of Changes, Tests, and Experiments for the Period of January 1, 2006, Through December 31, 20072008-04-17017 April 2008 Transmittal of 10 CFR 50.59 Report of Changes, Tests, and Experiments for the Period of January 1, 2006, Through December 31, 2007 ML0729107542007-10-22022 October 2007 2006 Rulemaking Annual Report DCL-07-071, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for 20062007-07-23023 July 2007 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for 2006 2023-09-13
[Table view] |
Text
Pacific Gas and Electric Company Barry S. Allen Diablo Canyon Power Plant Site Vice President Mail Code 104/6 P. O. Box 56 Avila Beach, CA 93424 805.545. 4888 May 30, 201 3 Internal: 691.4888 Fax: 805.545.6445 PG&E Letter DCL-13-058 u.s. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 2012 Annual Commitment Change Summary Report
Dear Commissioners and Staff:
In accordance with Nuclear Energy Institute (NEI) 99-04, "Guidelines for Managing NRC Commitment Changes," Revision 0, endorsed by the U.S. Nuclear Regulatory Commission (NRC) in SECY-00-0045, "Acceptance Of NEI 99-04, 'Guidelines for Managing NRC Commitments,'" Pacific Gas and Electric Company (PG&E) is submitting the enclosed summary of regulatory commitment changes report for Diablo Canyon Power Plant, Units 1 and 2. The report provides a summary of the regulatory commitment changes that were considered by NEI 99-04 to require notification and occurred during the period January 1, 2012, through December 31 ,
2012. The summary for each change identifies the source document(s), describes the original and revised commitments, and justifies the change. In cases where the Original Commitment and the Revised Commitment are both listed, the relevant changes are marked in bold text.
PG&E processed the regulatory commitment changes described in the report in accordance with the NEI guideline, and determined that they did not require prior NRC approval. The report does not include commitment changes that are contained in 10 CFR 50.59 evaluation summary reports, or in other submittals previously transmitted to the NRC.
PG&E makes no regulatory commitments (as defined by NEI 99-04) in this letter.
If you have any questions or require additional information, please contact Steven Zawalick at (805) 545-4040.
Sincerely, J5~ 5, ;ftt--
Barry S.(Alien A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway. Comanche Peak. Diablo Canyon
- Palo Verde. San Onofre. South Texas Project. Wolf Creek
Document Control Desk PG&E Letter DCL-13-058 May 30,2013 Page 2 ssz/640 18345 Enclosure cc/enc: Thomas R. Hipschman, NRC Senior Resident Inspector Arthur T. Howell, III, NRC Region IV James T. Polickoski, NRR Project Manager A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway. Comanche Peak. Diablo Canyon
- Palo Verde. San Onofre. South Texas Project. Wolf Creek
PG&E Letter DCL-13-058 Enclosure
SUMMARY
OF REGULATORY COMMITMENT CHANGES JANUARY 1, 2012, THROUGH DECEMBER 31, 2012 CONTENTS Item Commitment Subject 1.0 Steam Generator Tube Integrity Commitments T19173, T19174, T19175, T19176 2.0 Timeliness of Corrective Actions on Quality Problems 3.0 Non-Destructive Examination of Lifting Rig
PG&E letter DCl-13-058 Enclosure 1.0 Steam Generator Tube Integrity Commitments T19173, T19174, T19175, T19176 Source Document(s)
PG&E letter DCl 85-215 NRC Generic letter 85-02 Original Commitment Various commitments in PG&E's response to NRC Generic letter 85-02, Steam Generator (SG) Tube Integrity:
T19173: Visual inspection of the SG Tube Sheet secondary side.
T19174: Housekeeping and Foreign Material Exclusion T19175: Water Chemistry T19176: Condenser Inspection Program Revised Commitment None; they have been deleted.
Justification for Change These four commitments are the remaining active Diablo Canyon Power Plant (DCPP) Procedure Commitment Database (PCD) commitments from PG&E letter DCl 85-215, the PG&E response to Generic letter 85-02. All other PCD commitments from DCl 85-215 have been previously deleted for various reasons, including SG replacement. These remaining commitments may be deleted because the program for SG tube integrity is now described in the DCPP Technical Specification (TS) Surveillance Requirement (SR) 3.4.17 and DCPP TS 5.5.9, as implemented in PG&E adoption of TS Task Force (TSTF) 449. The NRC issued License Amendment 194/195 in a letter to PG&E dated March 21, 2007 (License Amendment Request 06-04). These new TSs are performance-based and are programmatically consistent with the industry's NEI 97-06 SG program initiative. The TS Bases for SR 3.4.17.1 state that NEI 97-06 and its referenced EPRI guidelines establish the content of the SG program. The following six EPRI guidelines describe acceptable methods for SG Programs and are referenced in NEI 97-06: "PWR Steam Generator Examination Guidelines," "PWR Primary-to-Secondary leak Guidelines," "PWR Secondary Water Chemistry Guidelines," "PWR Primary Water Chemistry Guidelines," "Steam Generator Integrity Assessment Guidelines," and "Steam Generator In Situ Pressure Test Guidelines." Per NEI 03-08, "Guideline for the Management of Materials Issues," and DCPP Inter-Departmental Administrative Procedure (IDAP) TS1.ID1 0, "Reactor Coolant System Materials Degradation Management Program," PG&E must adhere to the requirements of these EPRI guidelines, or justify exceptions by developing technical justifications.
In conclusion, after adoption of TSTF-449 into the TS, prior PG&E commitments made in DCl 85-215 related to maintenance of SG tube integrity are considered superseded by the requirements in the EPRI guidelines referenced above.
PG&E letter DCl-13-058 Enclosure 2.0 Timeliness of Corrective Actions on Quality Problems Source Document(s)
PG&E letter DCl 87-136 PG&E letter DCl 89-006 Original Commitment To improve timeliness of corrective actions on quality problems, an action plan was written. The action plan requires:
- Quality Evaluation coordinators (Corrective Action Program (CAP) Coordinator) to be established in each department
- improved communication between Quality Control and departmental coordinators
- re-evaluation of the present priority system
- procedure revisions to streamline and clarify the problem reporting program Revised Commitment To improve timeliness of corrective actions for quality problems, an action plan was written. The action plan requires:
- re-evaluation of the present priority system
- procedure revisions to streamline and clarify the problem-reporting program Justification for Change This commitment was made to address a Notice of Violation documented in NRC Inspection Report 50-275/88-15 and 50-323/88-14, issued on September 6,1988.
The timeliness of the corrective actions is being monitored by each line organization independently of the CAP Coordinators [currently, Performance Improvement Coordinators (PICOs)]. Specifically, each line organization can monitor the status of the pertinent corrective actions via different tools, such as the CAP Index report, Plant Performance Improvement Reports, or CAP searches (ZDCITEMS), regardless of whether or not a PICO is assigned to that line organization.
A portion of DCPP Commitment T36490, "Corrective Action Program Expectations," which is implemented via PG&E IDAP OM7.ID1, "Problem Identification and Resolution," calls for the clarification of the PICOs' roles and responsibilities. Therefore, T36490 incorporates the intent of those portions of T31401 that should be deleted.
PG&E letter DCl-13-058 Enclosure 3.0 Non-Destructive Examination of Lifting Rig Source Document( s)
PG&E letter DCl 83-509 PG&E letter DCl 83-729 NUREG 0612, "Control of Heavy loads at Nuclear Power Plants" ANSI N14.6 - 1978, "Special Lifting Devices for Shipping Containers Weighing 10000 Pounds (4500 Kg) or More for Nuclear Materials" ASME N45.2.15 - 1981, "Quality Assurance Program Requirements for Nuclear Power Plants" Original Commitment The major load-bearing welds and critical areas shall be non-destructively examined when the (reactor pressure vessel head and internals) lift (rigs) are repainted every ten years.
This examination may be in accordance with Westinghouse specifications used in the original examination, in accordance with ANSI N14.6 -1978, Section 5.5, or ANSI N45.2.15-1981, Section 6.2.
Revised Commitment The major load-bearing welds and critical areas (reactor pressure vessel head and internals lift rigs) shall be non-destructively examined every ten years.
This examination may be in accordance with Westinghouse specifications used in the original examination, in accordance with ANSI N14.6 -1978, Section 5.5, or ANSI N45.2.15-1981, Section 6.2.
Areas where coating repair are deemed necessary as the result of any observed damage and/or degradation of coating shall be repaired.
Justification for Change PG&E made the original commitment as part of the implementation of an alternate program for continued testing and maintenance of the special lifting devices (Le. SlD1 and SlD2) for the reactor internals. The commitment was to satisfy the intent of the NUREG-0612 and ANSI N14.6-1978 requirements, yet would not subject the lifting devices to unnecessarily conservative annual testing requirements, namely, load test to 150 percent of maximum design load or to dimensional testing, visual inspection, and non-destructive testing of load carrying welds. This commitment change was to clarify that the ten-year interval requirement applied to the non-destructive examination only and not the coating or painting. CAP Notification 50477942 Task 1 clarifies the intent of the commitment for repainting.