Text

SAFEGUARDS INFORMATION Enclosures 1 and 2 Contain Safeguards Information Withhold Under 10 CFR 2.390 When separated from the Safeguards Information enclosures, the cover letter is DECONTROLLED provided the transmittal document does not warrant protection from unauthorized disclosure.

~CONNECTICUT YANKEE ATOMIC POWER HADDAM COMPANY NECK PLANT 362 INJUN HOLLOW ROAD

Subject:

Haddam Neck Plant Independent Spent Fuel Storage Installation Physical Security Plan, Revision 3 In accordance with the provisions of 10 CFR 50.54, "Conditions of Licenses," paragraph (p)(2), the Connecticut Yankee Atomic Power' Company (CYAPCO) is submitting changes to the Haddam Neck Plant (HNP) Independent Spent Fuel Storage Installation (ISFSD) Physical Security Plan.

  • These changes were implemented on July 30, 2015.

A summary of changes to the HNP ISFSI Physical Security Plan is provided in Enclosure 1.

  • The H-NP ISFSI Physical Security Plan, Revision 3, is provided in Enclosure 2. The enclosures contain Safeguards Information. It is therefore requested that this information be withheld from public disclosure in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for*

Withholding," paragraph (d)(1), and 10 CFR 73.22, "Protection of Safeguards Information: Specific Requirements," paragraph (a)(4). When detached from Enclosures 1 and 2, this cover letter does not contain Safeguards Information and may be decontrolled.

This letter contains no commitments.

%col SAFEGUARDS INFORMATION Enclosures 1 and 2 Contain Safeguards Information Withhold Under 10 CFR 2.390 When separated from the Safeguards Information enclosures, the cover letter is DECONTROLLED provided the transmittal document does not warrant protection from unauthorized disclosure.

SAFEGUARDS INFORMATION Enclosures 1 and 2 Contain Safeguards Information Withhold Under 10 CFR 2.390 When seParated from the Safeguards Information enclosures, the cover letter is DECONTROLLED provided the transmittal document does not warrant protection from unauthorized disclosure.

Connecticut Yankee Atomic Power Company CY- 15-029/July 30, 2015/Page 2 of 2 If you have any question regarding this submittal, please do not hesitate to contact me at (860) 267-6426.

Respectfully, Brantley* Buerger, P.E.

ISFSI lManager

Enclosures:

1. Summary of Changes to the H-NP ISFSI Physical Security Plan in accordance with NEI 11-08
2. HINP ISFSI Physical Security Plan, Revision 3 cc: D. H. Dorman, NRC Region I Administrator (Cover Letter Only)

M. S. Ferdas, Chief, Decommissioning Branch, NRC, Region I J. Goshen, NRC Project Manager J. Semancik, Director, CT DEEP, Radiation Division (Cover Letter Only).

SAFEGUARDS INFORMATION Enclosures 1 and 2 Contain Safeguards Information Withhold Under 10 CFR 2.390 When separated from the Safeguards Information enclosures, the cover letter is DECONTROLLED provided the transmittal document does not warrant protection from unauthorized disclosure.