CY-15-001, Independent Spent Fuel Storage Installation - Report of 10 CFR 50.59 Changes, Tests, and Experiments

From kanterella
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation - Report of 10 CFR 50.59 Changes, Tests, and Experiments
ML15022A059
Person / Time
Site: Haddam Neck  File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 01/06/2015
From: Buerger B
Connecticut Yankee Atomic Power Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
CY-15-001
Download: ML15022A059 (1)


Text

HADDAM NECK PLANT C 362 INJUN HOLLOW ROAD EAST HAMPTON, CT 06424-3099 January 6, 2015 CY-15-001 10 CFR 50.4 and 10 CFR 50.59 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 - 0001 Connecticut Yankee Atomic Power Company Haddam Neck Plant Independent Spent Fuel Storage Installation NRC License Nos. DPR-61 and SFGL-21 (NRC Docket Nos. 50-213 and 72-39)

Subject:

Report of 10 CFR 50.59 Changes, Tests, and Experiments In accordance with 10 CFR 50.59(d)(2), Connecticut Yankee Atomic Power Company is required to submit to the NRC a brief description of any changes, tests or experiments made pursuant to 10 CFR 50.59(c), including a summary of the evaluation of each. This report covers the period from January 1, 2013 through December 31, 2014. During that time period, there were no changes, tests, or experiments made pursuant to paragraph (c) of 10 CFR 50.59.

This letter contains no regulatory commitments.

If you have any questions regarding this submittal, please do not hesitate to contact me at (860) 267-6426 ext. 303.

Respectfully, Brantley B "erger, PE ISFSI Marager cc: D. Dorman, NRC Region I Administrator M. S. Ferdas, Chief, Decommissioning Branch, NRC, Region 1 J. Goshen, NRC Project Manager, Haddam Neck Plant J. Semancik, Director, CT DEEP, Radiation Division 0 HS_5 Z