CY-09-002, 10 CFR 50.59 Summary Report

From kanterella
Jump to navigation Jump to search
10 CFR 50.59 Summary Report
ML090650598
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 02/24/2009
From: Lenois J
Connecticut Yankee Atomic Power Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
CY-09-002
Download: ML090650598 (1)


Text

CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD

  • EAST HAMPTON, CT 06424-3099 February 24, 2009 CY-09-002 Docket No. 50-213 Re: 10 CFR 50.59 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Haddam Neck Plant 10 CFR 50.59 Summary Report Pursuant to the provisions of 10 CFR 50.59(d)(2), Connecticut Yankee Atomic Power Company submits this letter as the, report of Changes, Tests, and Experiments for the Haddam Neck Plant for the period of January. 1, 2007 to December 31, 2008. There were no 10 CFR 50.59 reports generated during the periodstated.

If you have any questions, please contact me at (860) 267-6426 (303).

Sincerely, (J'a-mZe-s M. Lenois Sr. Date A1SFSI Manager cc: S.J. Collins, NRC Region I Administrator J.M. Goshen, NRC Project Manager E.W. Cobey, Chief, Decommissioning Branch, NRC Region I E. L. Wilds, Jr., Director, CT.DEP'Monitoring and Radiation Division

@47